ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf

上传人:刘芸 文档编号:446745 上传时间:2018-11-16 格式:PDF 页数:32 大小:1.28MB
下载 相关 举报
ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf_第1页
第1页 / 共32页
ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf_第2页
第2页 / 共32页
ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf_第3页
第3页 / 共32页
ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf_第4页
第4页 / 共32页
ARMY MIL-P-63223 A-1984 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf_第5页
第5页 / 共32页
亲,该文档总共32页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、.I NIL-P-63223A 13 m 977970b OLl25723 8 m MIL-P-63223A(AR) 5 December 1984 SUPERSEDING MIL-P-63223(AR) 17 August 1979 MILITARY SPECIFICATION PROJECTILE, GUIDED, 155MM, M712 This specification is approved for use by the U.S. Army Armament, Munitions and Chemical Command and is available for use by al

2、l Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for the manufacture and acceptance of the M712, 155MM, Guided Projectle, Prime item. 2. APPLICABLE DOCUMENTS 2.1 Goverm2nt .documents 2.1.1 Specifications, standards, and hanb

3、ooks. Unless other- wise specified the following specifications, standards, and hand- book of the issue listed in that issue of the Department of Defense Index of Specifications (DoDISS) specified in the solicitation form a part of this specification to the extent specified herein. SPECIFICATIONS MI

4、LITARY MIL-P-63224 - Projectile, Guided, 155t# M712, Guidance Section for MIL-P-63225 - Projectile, Guided, 155MM, M712, Control Section for MIL-P-63226 - Projectile, Guided, 155t# M712, Warhead for MIL-P-63227 - Projectile, Guided, 155hbf8 M712, Packaging for FSC: 1320 Beneficial comments (recommen

5、dations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander. US Arm Armament Research and Development Center. Attn. DRSMC-QA, D-ver, New a P w O c O 11 Licensed by Information Handling ServicesI MIL-P-63223A 13 9999906 O42593

6、4 2 W rll 0 v 12 Licensed by Information Handling ServicesMIL-P-63223A 13 m 777770b 0425735 Li m n R Y 4 m N N m D I pi I 4 H c r v) w c d u P c W bb Y Z = E 3 rn o - I MIL-P-b3223A 13 W 777770b 0425745 7 WTr-r c I ! ! I I !I MIL- P- 63 22 3A (AR) 3 4 K PSD (G SQ FER EiZ) 23 Licensed by Information

7、Handling ServicesMIL-P-63223A 13 W 7777706 0425746 7 t. MIL-P -632 23A (AR) II k4 4 W P 3 I o C O u b C ru c -0 *rl u PSD (G SQ PER HZ) 24 a I Licensed by Information Handling ServicesT f-r-1 NIL-P-63223A 13 W 7779706 0425747 O W ! I i 1 i i i ! :I I I I l I I 1 ! t ! 9 9 h m II bl MIL-P-632 23A(AR)

8、 I o -. *-* Licensed by Information Handling Services-0 D h MIL-P -63 2 23 A (AR) L C Lh C Y K! Licensed by Information Handling Services MIL-P -63 2 23A (AR) D D h ? II I4 w 3 w I I PSD (C SQ PER HZ) 27 I Licensed by Information Handling Services7- - MIL-P-63223A 13 W 7779706 0425750 O U Q h II IA

9、w w IJ r- ri O O Licensed by Information Handling Services+ MIL-P-63223A 33 m 9999906 0425753 2 m MIL -P -6 3 2 2 3 A ( AR) (a) Cold - The containerized projectiles shall be placed in an environmental chamber preconditioned to -250 + 50F (-31.70 + 3%) and maintained at that temperature for not less

10、than 16 hours. At the conclusion of the conditioning period, and within 5 minutes after removal from the cold chamber, the projectiles shall be cannon launched with a charge that is also conditioned to the same temperature. If, during this procedure, extracton of a cold conditioned projectile is req

11、uired for any reason, the projectile shall require conditioning to ambient temperature, drying, containerizing and environmental reconditioning to temperature prior to launch. an env hours - + 3Oc) (b) Hot - The containerized projectiles shall be placed in ironmental chamber preconditioned to 1450 +

12、 50F (62.80 and maintained at that temperature for not less than 16 At the conclusion of the conditioning period, and within 5 minutes after removal from the hot chamber, the projectiles shall be launched with a charge that is also conditioned to the same temperature. 4.5.8 Soft recovery. After the

13、projectile has been subjected to the environmental conditioning per 4.5.5.1 and 4.5.5.2 it shall be subjected to the live sequence test per 4.5.8.2 after it has been prepared and soft recovered per 4.5.8;l. ?“ne projectile shall be subjected to additional examinations and tests as required by the re

14、sults of the live sequence test. 4.5.8.1. Parachute recovery, The seeker section or guidance section shall be removed and replaced by a parachute pack. The fins shall be removed and the +11 volt battery disconnected. The projectile shall then be cannon fired at high acceleration out of a 155MM canno

15、n, using the M119A2 zone 8 at ambient temperature or equivalent propellant charge. The projectile and the seeker or guidance section shall be preconditioned at -250 + 50F as per 4.5.7(a) prior to cannon launch. section shall be canister fired out of a 8 inch cannon using a propellant charge which wi

16、ll yield at least 6800 gc in acceleration. The seeker sectzon or guidance 29 Licensed by Information Handling Services- MIL-P-b3223A 13 7777706 0425752 4 W MIL-P-63223A (AR) 5 4.5.8.2 Live sequence test. This test is intended to simulate the function of the projectile as it would during flight. The

17、live sequence test shall be conducted in accordance with paragraph 4.5.3.6.7 of MIL-P-63225 and paragraph 4.5.3.17 of MIL-P-63224 . K 5 PACKAGING 5.1 Packing, p ackaging, and marking. Packing and packaging of the projectile and marking of the loaded container shall be in accordance with drawing 9305

18、335, for shipment in accordance with drawing 19-48-4159-2OPM-1003. 5,2 Palletization. Packaged projectiles shall be palletized 6 NOTES 6.1 Intended use. The projectile is intended to be fired 6.2 Orderinq data. Procurement documents shall specify the 6.2.1 Procurement requirements, from a 155MM howi

19、tzer against a variety of military targets. fallowing: fa) Title, number, an date of this specification (b) Exceptions, if any, to this specification (cl Provisions for first article inspection (d) Disposition of first article samples (e) Requirements for lot control. 6.2.2 Contract data requirement

20、s. (a) Contract data requirements for inspection equipment designs (conforming to data Item description DI-R-1714, tailored). (b) Data Cards. When required by incorporation of DD form 1423 into the contract, data cards shall be prepared or each lot in accordance with Data Item description DI-L-1410,

21、 except that for propellant or explosive lots, Acceptance and Description Sheets will be prepared in accordance with MIL-STD-1171. 6.3 Definitions. 6.3.1 Contractor. Unless otherwise specified, the word contractor used throughout this specification shall mean any supplier or producer of items or material to the Government Owned, Contractor Operated (GOCO) plants. 30 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1