ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf

上传人:bonesoil321 文档编号:446970 上传时间:2018-11-16 格式:PDF 页数:21 大小:750.43KB
下载 相关 举报
ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf_第1页
第1页 / 共21页
ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf_第2页
第2页 / 共21页
ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf_第3页
第3页 / 共21页
ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf_第4页
第4页 / 共21页
ARMY MIL-P-71158-1994 PROJECTILE LIQUID XM46《XM46式液体射弹》.pdf_第5页
第5页 / 共21页
亲,该文档总共21页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 MIL-P-71158 m Ob 1990735 3q7 m I INCH-POUND I MIL-P-71158 (AR) 19 October 1994 MILITARY SPECIFICATION PROPELLANT, LIQUID, XM46 This specification is approved for use by the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of

2、 Defense. 1. SCOPE 1.1 ScoDe. This specification covers the requirements, examinations and tests for the manufacture and packaging of XM46 liquid propellant. 2. APPLICABLE DOCUMENTS 2.1 Gove rnment Documents. 2.1.1 SDecificat ions, Sta ndards and handboo ks. The following specifications, standards,

3、and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation (see 6.2).

4、SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for STANDARDS MILITARY Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document, should be addressed to: Commander,

5、U.S. Army, ARDEC, ATTN: SMCAR-BAC-S, Picatinny Arsenal, NJ 07806-5000 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1376 DISTRIBUTION S TATEMENT A . Approved for public release; distribution is unlimited. Pr

6、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-71158 D 999990b l199073b 283 MIL-P-71158 (AR) MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1171 - Acceptance and Description Sheets (for P

7、ropellants and Explosives) (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the DODSSP - Customer Service, Standardization Documents Order Desk, Bldg 4D, 700 Robbins Ave., Philadelphia, PA 19111-5094). 2.1.2 Othe r Gove rnmen t d

8、ocu ments. d rawincrs a nd Dub lications. The following other Government documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS US ARMY ARMAMENTS RESEARCH DEVELOPMENT AND E

9、NGINEERING CENTER 12972309 - Packing and Marking for XM46 Liquid 12972308 - Marking for XM46 Liquid Propellant Inner 12972305 - Drum, Shipping, Inner for XM46 Liquid 12972315 - Packing and Marking for XM46 Liquid Propellant Shipping & Storage Container (30 Gallon Drum) Pack(5 Gallon Drum) Propellant

10、 (5 Gallon Drum) Propellant Shipping and Storage Container (55 Gallon Drum) 12972314 - Marking for XM46 Liquid Propellant Inner Pack (30 Gallon Drum) 12972311 - Drum, Shipping, Inner for XM46 Liquid Propellant (30 Gallon Drum) (Copies of drawings, publications and other Government documents required

11、 by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Non - Gove rnment Dub lications. The following documents form a part of this document to the extent specified herein. Unless otherwise specif

12、ied, the issues of the documents which are DoD adopted shall be those listed in the issue of the DoDISS specified in the solicitation. Unless otherwise specified, the issues of the documents not listed in the DoDISS are the issues of the documents cited in the solicitation (see 6.2). AMERICAN SOCIET

13、Y FOR TESTING AND MATERIALS (ASTM) ASTM E 203 - Test Method for Water Using Karl Fischer Reagent 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-71158 = 9999906 1790737 IILT m MIL-P-71158 (AR) ASTM E 300 - Recommended Practice for Sampling In

14、dustrial Chemicals ASTM D 2905 - Statement on Number of Specimens Required to Determine the Average Quality of a Textile Material (Application for copies of ASTM publications should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103.) AMERICAN CH

15、EMICAL SOCIETY SPECIFICATIONS Reagent Chemicals (Applications for copies should be addressed to the American Chemical Society, 1155 16th Street NW, Washington, DC 20036) 2.3 Drder of D recede nce. In the event of a conflict between the text of this document and the references cited herein, the text

16、of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained (See contract provisions for additional precedence criteria). 3. REQUIREMENTS 3.1 Chemical and nhvsical DroDerties. XM46 liquid propellant sh

17、all be a mixture of 60.8 wt % Hydroxyl ammonium nitrate (HAN), 19.2 wt % Triethanol ammonium nitrate (TEAN) and 20.0 wt % water. The propellant shall conform to the chemical and physical requirements specified in Table I when tested in accordance with the applicable paragraph. TABLE I Chemical and P

18、hvs ical Reau i rement s HAN, wt % TEAN, wt % Water, wt % Nitric acid, wt % Ammonium Nitrate, wt % Iron, ppm Mercury, ppb Total Metals, ppm Density, gm/cc Sulfate ions, ppm Requirement Applicable Min Max Test Method 60.6 61.0 4.5.1.1 4.5.1.1 4.5.1.2 4.5.1.3 4.5.1.4 4.5.1.5 4.5.1.5 4.5.1.5 4.5.1.6 6.

19、8 3.1.1 Metals. The fo low 19.0 19.4 19.8 20.2 o. O01 0.05 0.50 2.0 5.0 10.0 - - 200. - - 1.410 1.450 - ng metals shall be ,nc uded in the value for total metals: Chromium, Cobalt, Copper, Iron, Manganese, Nickel, Vanadium, Zinc and Mercury. Their sum shall not exceed 5.0 ppm. Furthermore, the conce

20、ntration of Mercury 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-P-71L58 9999906 1990738 O56 MIL-P-71158 (AR) shall not exceed 200. ppb and the concentration of Iron shall not exceed 2.0 ppm (See 6.6). 3.1.2 closiire. The sum of concentrati

21、on of HAN, TEAN, water and AN shall add up to 100 - 0.6 + 1.1 wt %. 3.1.3 Total n itrate . The total nitrate concentration of the propellant shall be determined in accordancewith 4.5.1.7 for information purposes. 3.2 Form. The XM46 propellant shall be in the form of a clear, colorless liquid. 3.3 Fi

22、rst art icle insnpct ion. When specified in the contract or purchase order (see 6.2) a sample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4.3). 3.4 ProDellant desc riDtio n sheets . The contractor shall submit a propellant description sheet

23、and a propellant acceptance sheet in accordance with MIL-STD-1171. The sheets, as a minimum, will provide the necessary information in order to demonstrate that the propellant meets the requirements of this specification. These sheets shall be submitted to the Government in accordance with 6.9. 3.5

24、SrJO rkmanshiD. The manufacturer shall implement procedures and controls to assure that the process and the product produced are not compromised by foreign materials and contaminants or any other conditions which may degrade the composition. The propellant shall have no detectable odor during normal

25、 handling operations. 4. QUALITY ASSURANCE PROVISIONS 4.1 -Dons ibilitv for insDect ion. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise sp

26、ecified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the s

27、pecification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements. 4.1.1 ResDons ibilitv for comDliance. All items shall meet all requirements of Sections 3 and 5. The inspections set forth in this specification shall become a part of the con

28、tractors overall inspection system or quality program. The absence of any inspection requirements in this specification shall not relieve the contractor of the responsibility of ensuring that all products and supplies submitted to the Government for acceptance 4 Provided by IHSNot for ResaleNo repro

29、duction or networking permitted without license from IHS-,-,-MIL-P-71158 997790b 1970739 T92 MIL-P-71158 (AR) comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does

30、 not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material. *. 4.1.2 General movisiou . Unless otherwise specified herein, the provisions of MIL-A-48078 apply and form a part of this specification. References shal

31、l be made to MIL-STD-109 to define quality assurance terms used herein. 9. 4.2 -sification of inssection . The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.3). b. Quality conformance inspection (see 4.4). 4.3 First article inssect ion. 4.3.1

32、,Sub missio n. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall be 500 gm of XM46 propellant for chemical testing. A sample of propellant for ballistic testing will be

33、 submitted in accordance with the provisions of the contract. The sample shall be obtained from the first production lot which has been produced by the Contractor using the same production processes, procedures and equipment as will be used in fulfilling the contract. All materials shall be obtained

34、 from the same sources of supply as will be used in regular production. In addition, a new sample, or portion thereof, as directed by the contracting officer, shall also be submitted whenever a change occurs in the manufacturing process, material used, specification or source of supply as to signifi

35、cantly affect the product as determined by the contracting officer. The contractor is in no way authorized by the Government to initiate production of a second lot of propellant until the first article test has been completed and the results are found to be acceptable. 4.3.2 Insnect ions to be nerfo

36、r med. The sample will be subjected by the Government to any or all of the examinations or tests specified in Table II (MIL-A-48078). 4.3.3 Reject ion. If any test specimen fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves th

37、e right to terminate inspection upon any failure of a test specimen to comply with any of the requirements. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-711519 M 9999906 1990740 704 idP4memmulr-m idddrldrlddrl r-Co nmmmmmmmmm ww Jidcdcdcdcdc

38、d-3ddc a, A d cl (d c u) t- ul c -4 JJ 7 O a a, 4 d a U cn d id u 2 a, c JJ . m m c a a, k *d 3 bl a, k cn d (u JJ a, E a, JZ JJ -rl u u a k u c O u a, u c a a, -rl u .ri u a, a cn a, a I+ I+ -rl -d 3 rn u -rl .u cn .rl d d id k O u cn m I I dm 6 Provided by IHSNot for ResaleNo reproduction or netwo

39、rking permitted without license from IHS-,-,-MIL-P-7LL58 0b LO74L 640 MIL-P-71158 (AR) 4.4 Oualitv con formance insDectioq. 4.4.1 InsDect ion lot formation. Unless otherwise approved by the Contracting officer, a lot of XM46 liquid propellant shall be no less than 5,000 Kg. In addition the following

40、 criteria shall apply: A lot shall consist of one or more batches of propellant produced by one manufacturer, in accordance with the same specification, or same specification revision, under one continuous set of operating conditions. Each lot shall consist of that quantity of XM46 propellant that h

41、as been blended and was subjected to the same unit chemical or physical process intended to make the final product homogeneous. The criteria and procedures for the assignment of lot numbers shall be in accordance with MIL-STD-1168. Also, MIL-A-48078 shall apply. Furthermore, a lot of propellant shal

42、l contain: a. Hydroxyl ammonium nitrate from not more than one manufacturer using the same manufacturing process. b. Triethanol ammonium nitrate from not more than one manufacturer using the same process. 4.4.1.1 Blendinu of batc hes. When batches of propellant are blended to form a lot, all batches

43、 that are to make up the lot must simultaneously be placed in one vessel and mixed until homogeneous or the contractor must receive prior approval on a blending procedure if the condition above is not met (See 6.5). 4.4.2 Examination. See MIL-A-48078. a. Classification of characte ristics. Quality c

44、onformance examinations and tests are specified in the following Classification of Characteristics paragraphs. The contractors quality program or detailed inspection system shall provide assurance of compliance of all characteristics with the applicable drawings and specification requirements utiliz

45、ing as a minimum the conformance criteria specified. When cited herein, attributes sampling inspection shall be conducted in accordance with Table III below, using the inspection levels stated in the Classification of Characteristics paragraphs. 7 Provided by IHSNot for ResaleNo reproduction or netw

46、orking permitted without license from IHS-,-,-MIL-P-71158 (AR) TABLE III Attributes Sa mDle nsD&on Minor Samrle Size See Note 2 to 8 5 9 to 15 * 5 16 to 25 * 26 to 50 32 5 51 to 90 32 12 91 to 150 32 12 151 to 280 32 14 281 to 500 32 17 501 to 1200 74 20 1201 to 3200 74 24 3201 to 10,000 87 30 10,00

47、1 to 35,000 109 36 35,001 to 150,000 124 40 150,000 to 500,000 156 40 500,001 and over 187 40 * *- 100 % inspection NOTE: Use 100 % inspection when lot size is less than 5 units. Use sample size when lot size is greater than 5 units. b. Alternate aualitv con formance D rovisions. Unless otherwise sp

48、ecified herein or provided for in the contract, alternative quality conformance procedures, methods, or equipment, such as statistical process control, tool control, other types of sampling procedures, etc. may be used by the contractor when they provide, as a minimum the level of quality assurance

49、required by the provisions specified herein. Prior to applying such alternative procedures, methods, or equipment, the contractor shall describe them in a written proposal submitted to the Government for evaluation (see 6.11). When required, the contractor shall demonstrate that the effectiveness of each proposed alternative is equal to or better than the specified quality assurance provision(s) herein. In cases

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1