ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf

上传人:hopesteam270 文档编号:447356 上传时间:2018-11-16 格式:PDF 页数:7 大小:238.04KB
下载 相关 举报
ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf_第1页
第1页 / 共7页
ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf_第2页
第2页 / 共7页
ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf_第3页
第3页 / 共7页
ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf_第4页
第4页 / 共7页
ARMY MIL-PRF-49368C-1999 LENS ASSEMBLY EYEPIECE AN PVS-4 AND AN TVS-5.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-PRF-413bBC U 7777706 2087208 T23 I 1 INCH-POUND I MIL-PRF-49368C (CR) 4 March 1999 SUPERSEDING MIL-L-49368B (CR) 27 May 1992 PERFORMANCE SPECIFICATION LENS ASSEMBLY, EYEPIECE, AN/PVS-4 AND AN/TVS-5 This specification is approved for use by US Army Communications- Electronics Command, Department

2、of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the Lens Assembly, Eyepiece, AN/PVS-4 and AN/TVS-5 (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in s

3、ections 3 and 4 of this specification. This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet

4、all specified requirements in sections 3 and 4 of this specification, whether or not they are listed. Beneficial comments (recommendation, additions, deletions) and any data which may be of use in improving this document should be addressed to HQ, USA Communications-Electronics Command ATTN: AMSEL-L

5、C-LEO-E-EP Fort Monmouth, NJ 07703-5023 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 5855 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Copyright Communications - Electro

6、nics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-PRF-49368C RI 99Ob 2087209 9bT 111 MIL-PRF-49368C (CR) 2.1.2 Reference documents, drawings and publications. The following other Government documents, drawings

7、and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2.d). DRAW IN G S USA COMMUNICATIONS-ELECTRONICS COMMAND SM-D-850400 - Lens Assembly, Eyepiece, AN/PVS-4 and AN/TVS-5 (Copies of specificati

8、ons, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Order of precedence. In the event of a conflict between the text of this document and th

9、e references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Description. The Lens Assembly, Eyepiece, herein referred to as the eyepiece assembl

10、y, is part of the Night Vision Sight, Individual Served Weapon, AN/PVS-4 and Night Vision Sight, Crew Served Weapon, AN/TVS-5. 3.2.1 First Article Testing (FAT). When specified in the contract or purchase order (see 6.2.f), the contractor shall furnish FAT eyepiece assemblies for inspection and appr

11、oval (see 4.2). 3.3 Construction. The eyepiece assembly shall be constructed to assure compliance with the contract configuration baseline and in accordance with SM-D-850400 as applicable. 3.4 Material. The contractor shall select parts and materials that are fully capable of meeting all of the oper

12、ational and environmental requirements specified herein. The materials specified in the applicable drawings are recommended, but not mandatory. Selection criteria of the class, grade or type part shall ensure the material will be able to perform its intended function when it is assembled. Verificati

13、on of the supplier meeting the overall performance requirements shall be the governing acceptance standard. Recovered materials shall be used to the maximum extent possible. 3.5 Components. The eyepiece assembly shall consist of optical components assembled within a housing as specified on the drawi

14、ngs. 2 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-IIL-PRF-443bBC = 9999906 2087230 bB1i 4 MIL-PRF-49368C (CR) 3.6 Performance characteristics. 3.6.1 Effective focal length. T

15、he effective focal length shall be 26.5, k 0.3mm. 3.6.2 Flange focal distance. The flange focal distance of the eyepiece assembly at zero diopter shall be 4.753 f 0.207, -0.435mm. 3.6.3 Field curvature. The field curvature of the eyepiece assembly shall deviate no more than +1/4 diopter over the ful

16、l 25m.n flat format. 3.6.4 Linear distortion. The linear distortion of the eyepiece assembly shall be between O and 9 percent pincushion distortion at the edge of the 25mm format. 3.6.5 Exit pupil. The exit pupil diameter shall be 5.0, f 0.2mm at eye relief of 28.0, IO.5mm. 3.6.6 Transmission. The t

17、ransmission of the eyepiece assembly shall be not less than 80 percent over the full eyepiece assembly aperture for the spectral output of the P-20 phosphor. 3.6.7 Resolution. The eyepiece shall have an on-axis resolution of not less than 50 lp/mm. The resolution measurement shall be made using a 28

18、56K light source filtered to simulate the phosphor. 3.6.8 Diopter adjustment. The diopter adjustment shall operate smoothly, without binding, throughout its complete range of movement at all operating temperatures specified herein. Dynamic torque shall be between 2 and 20 inch-pounds. 3.6.9 Diopter

19、range. The eyepiece assembly focus range shall not be less than 8 diopters when one rotational stop is set at -6 (+1/4 -0) diopters. 3.7 Environmental. NOTE: Post-environmental verification of performance shall be Exit pupil (3.6.5), Transmission (3.6.6) and Resolution (3.6.7). Failure to meet these

20、 requirements shall constitute failure due to degradation of performance of input or output characteristics per the damage technical interpretation of 3.10.1. 3.7.1 Temperature Extremes. The eyepiece assembly shall not be damaged (see 3.10.1) after storage in any temperature from -51OC to +68OC. The

21、 eyepiece assembly shall not be damaged (see 3.10.1) after being subjected to repetitive temperature changes between +23“C and +68C in 5 minutes and between +23OC and -51OC in 5 minutes. The transition from +68OC to -5loC and from -51OC to +68OC shall include a 2 hour soak at +23Oc. Soak time at tem

22、perature extremes shall be sufficient or the entire eyepiece assembly to attain stabilization. 3 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-49368C MIL-PRF-49368C (CR)

23、 3.7.2 Vibration. The eyepiece assembly shall not be damaged (see 3.10.1) after being subjected to simple harmonic motion having an amplitude of 0.015 inch (0.03 inch total excursion) with the frequency being varied between 5 and 55 hertz (Hz). Vibration shall be applied in 3 mutually perpendicular

24、planes, one of which is perpendicular to the optical axis. The duration of vibration shall be 5 minutes in each plane. 3.7.3 Altitude. The eyepiece assembly shall not be damaged (see 3.10.1) after storage at a pressure equivalent to 10,000 feet altitude above sea level. 3.7.4 Humidity. The eyepiece

25、assembly shall not be damaged (see 3.10.1) after storage up to +68“C minimum with 95 f 5 percent relative humidity. 3.7.5 Immersion. The eyepiece assembly shall not be damaged (see 3.10.1) after being immersed in fresh water to a depth of not less than 3 feet for a period of not less than 30 minutes

26、. The eyepiece assembly shall be pre- conditioned by exposure to a temperature of +45“C I3“C for a period of 2 hours prior to being immersed in the fresh water at a temperature of +18“C f5C. 3.7.6 High intensity shock. The eyepiece assembly shall not be damaged (see 3.10.1) by a sequence of 3 shocks

27、 applied in each direction along each of 3 mutually perpendicular axes (horizontal, vertical, and optical axis when the reticle pattern is erect). The shocks shall be half sine pulses and shall have a time duration of 4 milliseconds I5 percent. Shock pulses applied along the axes horizontal and perp

28、endicular to the optical axis shall have a peak amplitude of 50gs I15 percent (see 3.10.2). Shock pulses applied along the optical axis shall have a peak amplitude of 100 tl5gs. 3.8 Marking. Marking shall be in accordance with applicable drawings unless otherwise specified in the contract or purchas

29、e order. 3.9 Workmanship. Workmanship standards shall be such that the eyepiece assembly will meet all requirements of this specification and any referenced specifications or drawings. 3.10 Technical interpretations. The following technical interpretations, when referenced in sections 3 or 4, are ma

30、ndatory for this specification. 3.10.1 Damage. Breakages, loosening, shifting, evidence of corrosion or failure of any finish, hardware, connection or component; leakage or condensation of moisture within the eyepiece assembly; or degradation in input or output characteristics. 3.10.2 x- “g“ is defi

31、ned as an acceleration or deceleration of 32.17 feet per second per second. 3.10.3 Ambient temperature. Ambient temperature is defined as +23C 2 10C. 3.10.4 Environmental temperature. Environmental chamber temperature shall be controlled within t5“C of the specified temperature unless otherwise spec

32、ified. 4 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-fiIL-PRF-49368C 99999Ob 2087232 454 m Inspection Effective focal length Flange focal length Field curvature Linear distort

33、ion Exit pupil Transmission Resolution Diopter adjustment Diopter range MIL-PRF-4 9368C (CR) Requirement Paragraph 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 4. VERIFICATION Inspection 4.1 Classification of inspection. Inspection shall be classified as follows: a. First article testing (4

34、.2). b. Conformance inspection (4.3). 4.2 First article testing. When specified in the contract or purchase order (see 6.2.f) first article testing shall be performed by the contractor. The quantity of initial production test samples shall be as specified in the contract or purchase order (see 6.2.b

35、). Paragraph 4.2.1 FAT Testing. Each eyepiece assembly in the FAT lot shall be subjected to the inspections of Table I. Samples selected from the lot shall be subjected to the inspections of Table II. Sample size shall be as specified in the contract or purchase order (see 6.2.b). Failure of any ins

36、pection shall be cause for rejection of that eyepiece assembly and may be cause for rejection of the FAT. Inspections may be performed in any order except for Immersion, which shall follow temperature extremes and temperature shock. Vibiat ion 3.1.2 Alt i tude 3.7.3 Humidity 3.1.4 Immersion 3.1.5 Hi

37、gh intensity shock 3.7.6 ? Table I Unit first article testing. Table II Sample first article testing. I I Requirement 5 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-493

38、68C I 9999906 2087233 390 6 MIL-PRF-49368C (CR) 4.3 Conformance inspection. Requirements for conformance inspections shall be as specified in the contract or purchase order (see 6.2.e). Unless otherwise specified, all tests shall be performed at ambient temperature (see 3.10.3). 5. PACKAGING 5.1 Pac

39、kaging requirements. Packaging and preservation shall be best commercial practice unless otherwise specified in the contract or purchase order (see 6.2.g). 6. NOTES (This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.) 6.1 Intended use. The

40、 eyepiece assembly is used for aimed firing at night with the Night Vision Sight, Individual Served Weapon, AN/PVS-4 and the Night Vision Sight, Crew Served Weapon, AN/TVS-5. 6.2 Acquisition requirements. Acquisition documents must specify the following: a. b. C. d. e. f. g- Title, number, and date

41、of specification. Quantity and schedule for FAT testing and disposition of FAT samples. Necessary actions by the contractor in the event of a lot failure (see 4.5.4 ) . Issue of DODISS to be cited in the solicitation, and if required, the specific issue of individual documents referenced (see 2.1.1

42、and 2.1.2.) Statement identifying that the contractor must submit his proposal for conformance inspection to include specific requirements to be verified and the sampling plan to be used to provide the desired confidence level. Statement specifying that FAT testing is, or is not, required and sampli

43、ng requirements for FAT. Packaging and preservation (see section 5). 6.3 Definitions. See 3.10 6.5 Subject term keyword listing. Eyepiece Eyepiece assembly 6.6 Changes from previous issue. Marginal notations are not used in this revision to identify changes with respect to the previous issue due to

44、the extensive changes. 6 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 flIL-PRF-473bC E 7777706 2087214 227 MIL-PRF-49368C (CR) Custodian: Army - CR Preparing Activity: Army - CR Project 5855-0199 7 Copyright Communications - Electronics Command Provided by IHS under license with CRAINot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ANSI UL 842A-2015 UL Standard for Safety Valves for Gasoline and Gasoline Ethanol Blends with Nominal Ethanol Concentrations up to 85 Percent (E0 C E85) (First Edition Reprint with.pdf ANSI UL 842A-2015 UL Standard for Safety Valves for Gasoline and Gasoline Ethanol Blends with Nominal Ethanol Concentrations up to 85 Percent (E0 C E85) (First Edition Reprint with.pdf
  • ANSI UL 842B-2015 UL Standard for Safety Valves for Diesel Fuel Biodiesel Fuel Diesel Biodiesel Blends with Nominal Biodiesel Concentrations up to 20 Percent (B20) Kerosene and Fue.pdf ANSI UL 842B-2015 UL Standard for Safety Valves for Diesel Fuel Biodiesel Fuel Diesel Biodiesel Blends with Nominal Biodiesel Concentrations up to 20 Percent (B20) Kerosene and Fue.pdf
  • ANSI UL 844-2012 UL Standard for Safety Luminaires for Use in Hazardous (Classified) Locations (Thirteenth Edition Reprint with Revisions Through and Including October 6 2017)《分类危险.pdf ANSI UL 844-2012 UL Standard for Safety Luminaires for Use in Hazardous (Classified) Locations (Thirteenth Edition Reprint with Revisions Through and Including October 6 2017)《分类危险.pdf
  • ANSI UL 845-2005 UL Standard for Safety Motor Control Centers (Fifth Edition Reprint with Revisions Through and Including July 15 2011)《电动机控制台标准(公告日期2004年8月19日)》.pdf ANSI UL 845-2005 UL Standard for Safety Motor Control Centers (Fifth Edition Reprint with Revisions Through and Including July 15 2011)《电动机控制台标准(公告日期2004年8月19日)》.pdf
  • ANSI UL 852-2008 UL Standard for Safety Metallic Sprinkler Pipe for Fire Protection Service (Second Edition Reprint with Revisions Through and Including November 17 2014)《消防服务用金属喷水.pdf ANSI UL 852-2008 UL Standard for Safety Metallic Sprinkler Pipe for Fire Protection Service (Second Edition Reprint with Revisions Through and Including November 17 2014)《消防服务用金属喷水.pdf
  • ANSI UL 854-2004 UL Standard for Safety Service-Entrance Cables (Eleventh Edition Reprint with Revisions Through and Including November 18 2014).pdf ANSI UL 854-2004 UL Standard for Safety Service-Entrance Cables (Eleventh Edition Reprint with Revisions Through and Including November 18 2014).pdf
  • ANSI UL 857-2009 UL Standard for Safety Busways (Thirteenth Edition Reprint with Revisions Through and Including August 23 2016)《汇流条通道用安全标准》.pdf ANSI UL 857-2009 UL Standard for Safety Busways (Thirteenth Edition Reprint with Revisions Through and Including August 23 2016)《汇流条通道用安全标准》.pdf
  • ANSI UL 858-2014 UL Standard for Safety Household Electric Ranges (Sixteenth Edition Reprint with revisions through and including November 1 2017).pdf ANSI UL 858-2014 UL Standard for Safety Household Electric Ranges (Sixteenth Edition Reprint with revisions through and including November 1 2017).pdf
  • ANSI UL 858A-2007 UL Standard for Safety Safety-Related Solid-State Controls for Household Electric Ranges (Third Edition Reprint with revisions through and including December 17 2.pdf ANSI UL 858A-2007 UL Standard for Safety Safety-Related Solid-State Controls for Household Electric Ranges (Third Edition Reprint with revisions through and including December 17 2.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1