ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf

上传人:twoload295 文档编号:448251 上传时间:2018-11-16 格式:PDF 页数:11 大小:247.22KB
下载 相关 举报
ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf_第1页
第1页 / 共11页
ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf_第2页
第2页 / 共11页
ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf_第3页
第3页 / 共11页
ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf_第4页
第4页 / 共11页
ARMY MIL-S-70682 (2)-1998 SIMULATOR FLASH ARTILLERY M21 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M21型闪光模拟器零件的装载 组装和包装》.pdf_第5页
第5页 / 共11页
亲,该文档总共11页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、* MIL-S-70682 (AR) AMENDMENT 2 20 April 1998 SUPERSEDING AMMENDMENT 1 26 March 1993 MILITARY SPECIFICATION SIMULATOR, FLASH, ARTILLERY, M21 PARTS FOR AND LOADING, ASSEMBLING AND PACKING This Amendment forms a part of MIL-S-70682 (AR), dated 30 Armament, Research, Development and Engineering Center,

2、and is available for use by al-1 Departments and Agencies of the Department of Defense. March 1990, and is approved for use by the U.S. Army PAGE 4 3.4.6 Delete in its entirety. PAGE 5 4.3.1 Change the First Article quantity column of the following parts to read: Part Description Cap, protecting Con

3、tainer, Flash Charge Body Tube Assembly Tube Cover, Flash Charge O-Ring, Cover Plug, Electrical Assembly Insert, Threaded Pin, Electrical Drawing 9342132 9342142 9342143 9342144 9342145 9342149 9342149 9342154 9342155 9342156 Quantity 3/cavity 3/cavity 3 /cavity 5 5 3Icavity 25 3/cavity 5 5 Under ta

4、ble, line seven, delete “ (less quickmatch) “ . Add to table: Plug, Electrical Assembly (Alternate) 1294400 15 4.3.1. Submission. Delete from list: Cap, Short Circuit Assembly in its entirety. AMSC NIA 1 OF 11 FSC 1370 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

5、 Licensed by Information Handling ServicesMIL-S-70682 (AR) AMENDMENT 2 PAGES 6-8 * TABLE I: Delete in their entirety and substitute new pages included. PAGE. 9 TABLE. I: Heat Soak: Delete “Heat soak, 108, -, 3.4.4, 4.5.3.4“. Match and Cable Assembly. Under Electrical resistance test, delete “ (less

6、quickmatch) “. 2 Licensed by Information Handling Servicesz c o a o kk v) v) o 4 Y m 2 Yc? Y mm x 2 Y m Licensed by Information Handling ServicesL c? m x x 2 u: mmcs VI CJ CI v; CI Y m 8 Licensed by Information Handling Servicesi O m c - .- I-Co X ? m Y t Y Y d x 2 u 5 Licensed by Information Handli

7、ng ServicesMIL-S-70682 (AR) AMENDMENT 2 PAGE 13 4.4.2.2 Delete minor defect 201 in its entirety. PAGE 15 4.4.2.4: Delete in its entirety. PAGE 16 4.4.2.5, Major 101: Delete “Gage“ and substitute “Visual - straight edge“. Delete Minor 201 in its entirety PAGE 17 4.4.2.6 Delete major defects 101, 102

8、and minor defects 202, 204 in their entirety. PAGE 18 4.4.2.7: Case, Cartridge Assembly: Add major defect “101 Pull test, Tube Assembly to Body, loo%, -, 3.2, Gage. PAGE 19 * 4.4.2.8 Cover, Flash Charge: Revise Title to “Cover Assembly, Flash Charge“ Change major defect 102 to read; “102 Slot for ca

9、ble missing .40% 3.2 Visual“ Delete Major-103 in its entirety. * Add “Major 106, O-Ring inside diameter, 1.00%, 3.2, Gage“. * Add “Major 107, O-Ring cross section diameter, 1.008, 3.2, Gage“. Add “Major 108, O-Ring missing or in incorrect location, loo%, 3.2, visualn. PAGE 20 4.4.2.9: Quickmatch. De

10、lete in its entirety. 6 Licensed by Information Handling Services. MIL-S-70682 (2) 9999906 2066853 9Tb MIL-S-70682 (AR) AMENDMENT 2 PAGE 21 4.4.2.10 Change major defects 101, 102, and 103 and minor defect 203 to read : “101 Length from slotted end to flange, near side. 102 Length from slotted end to

11、 flange, far side. 103 O.D. of slotted end before cutting slot. 203 Presence of slot .65% 3.2 Visual“. Add : J106 Diameter of pin head, -, 0.40%, 3.2, Gage 107 Length of pin head, min, -, O. 40%, 3.2, Gage 108 Width of slots, -, 0.40%, 3.2, Gage“ PAGE 22 4.4.2.11 Add “Note 1“ callout following “Majo

12、r“ and “Minor“ Add note: “1 - These classified defects do not apply to the alternative part which is a commercial item.“ PAGE 23 4.4.2.12 Delete major defects 101 and 104 in their entirety. Change major defect 102 and 103 to read: “102 Width under head (Datum B) I. “103 Length under head (Datum A) “

13、. PAGE 24 * 4.4.2.13: Clip. Delete in its entirety PAGE 25 * 4.4.2.14: Cap, Short Circuit, Delete in its entirety PAGE 26 4.4.2.15: Major 102, under AQL column, delete “.40% and substitute “1008“. Delete “l/“. - Delete Note 1 in itientirety. Delete major defects 101, 103, 104 and minor defect 201 in

14、 their entirety. 7 Licensed by Information Handling ServicesMIL-S-70682 (AR) AMENDMENT 2 PAGE 27 4.4.2.16: Delete in its entirety, PAGE 28 4.4.2.17: Delete major defect 101 in its entirety. Add “104 Match not completely coated, 1008, 3.2, Visual“. PAGE 31 * 4.4.2.20: Delete in its entirety. PAGE 32

15、4.4.2.21: Delete major 102 in its entirety, PAGE 36A * Add new page 36A included. PAGE 36B * Add new page 36B included. 8 , Licensed by Information Handling ServicesflIL-S-70b82 (2) 9999906 2066853 779 O0 mm c“ Licensed by Information Handling ServicesHIL-S-70b82 (2) m 99999Ob 20bb854 605 m r 10 (36

16、B) , Licensed by Information Handling ServicesMIL-S-70b82 (2) m 99999Ob 20bb855 541 m MIL-S-70682 (AR) AMENDMENT 2 PAGE 37 4.4.5.1, line 7: Delete “The lot shall be rejected in one (1) or more,“ and substitute The lot shall be rejected if two (2) or more .“ . 4.4.5.2, line 7 : Delete “The lot shall

17、be rejected in one (2) or more;“ . and substitute “The lot shall be rejected if two (3) or more .“ . PAGE 39 4.5.2.1 Charge composition. Line 3, delete “Method 102.1“ and substitute “Method 102.2.1“. PAGE 40 4.5.3.6: Delete in its entirety. PAGE 41 4.5.6, line 2: Delete (70 k 5F) The margins of this

18、 amendment are marked with an asterisk or vertical lines to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the government assumes no liability whatsoever for any inaccuracies in these notations

19、Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to previous amendments. Custodian: Amy-AR Preparing activity Army -AR (Project: 1370-0026) 11 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1