1、-1 10 August 1960 mARY SPECIFICATIrn mis amendment form a part of Military Specification XL-T-45464 (ora), dated 23 March 1960. Page 1 - Title: Delete and subetitute: “Meer Assembly, XMg.“ . * Paragraph 2.1, Specification, Military, change: -20332 to WLS-20322“ * Paragraph 2,1, Standards, Nilitary,
2、add: “MIL-sTD-286 - A.opeUant: Sampling, Inspection and Testing.“ Paragraph 2.1, Delete listing under Drawinge, Ordnance Corps, and substitute : “8824975 - Tracer .Aeeerbly, %Mg, 883ij1.33 - Carton,. pscking, Armmtnition, far Tracer, XM9. 8836134 - Box, Packing, Ammunition, for ILTacer, XMg.“ hge 3
3、- Paragraph 3.4, line 1: Delete “9.0 seconda“ and substitute: l18.03econdrrn * Paragraph 3.3.3: Delete and substitute: “3.3.3 Moisture an total volatile content.-The mofeture an total volatile content of the tracer compoeitlon at the tirno of manufacturing the pellets shall not exceed 0.10 percent,
4、and of the igniter composi- tion shall not exceed 0.14 percent, when tested a8 epecified in 4,s.i (see 6,3).“ , Page 1 of 2 FSC i315 f- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- HIL-T-4C464 (2) 13 7777706 0307378 b Paragraph 4.2.2.2: substitut
5、e : “hiador: 1. Delete Yajor defect characteristics 1 and 2, bad Charge missing or less thaa min. required depth from shodePO.o=o.*.o. Visual-Gage,“ Delete Mnor defect characteriaic 42 and eutietitute: Paragreph 4.2.2.2: “Minor: 42, Charge chipped or broken on any one step in excess of l/3 of the to
6、tal area of the step, or total of chipped or broken areas of all steps in excess of i/3 of the total area of the largest step Visual Paragraph 4.2.3.1: Delete and substituta: an igniter c(seet-me contractor aimil provide adequate controls to aesue the compliance of each lot with the applcable requir
7、emnt. least one randomly aelected eample of each composition from each 8 hours production or portion thereof. used for determining compliance. applicable requirerent shall be cause for rejection of the 8 hours production represented by the sample, specified in 4.3.1.“ “4.2*3.1 Moisture and total vol
8、atile matent of tracer ccmpositian The contractor shall test for verification at Compofiite #famgles shall not be Testing &all be performed as Any failure to comply -ith the * Paragraph 4.3.1: &lete and substitute: “4.3.1 Determination of moisture and total volatile content of tracer composition and
9、 imiter composition.-The moisture and total volatile content of the tracer composition and igniter composition ehall be determined in accordance with Standard Ma-STD-286, Metho 101.L.“ * Page 8 - Paragraph 4.3.3: Delete the sentence: The sample . . . . .a component. an substitute: (1 *l?se sample tr
10、acers shall be assembled into shot APDS-T, M392E1, OF other rounds of which it is a component, or M392E1, Boof Sug. * hge 9 - Paragraph 6.2# line 14: Delete sentence: n The mixture. . . . voiaties. and substitute: “The mixture is then dried In an oven, at 80 degrees Centigrade fop approximstely two hours to remove residual volatiles,“ * The asterisk denotes changes which were not included in Amendment 1. CUE t &an : Army-rhnce Corps Prepring activity: Army-rnance Corps 2 F- Page 2 or 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-