ASTM C1618M-2005 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压的混凝土排污管的标准试验方法(米制)》.pdf

上传人:boatfragile160 文档编号:465317 上传时间:2018-11-27 格式:PDF 页数:3 大小:59.28KB
下载 相关 举报
ASTM C1618M-2005 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压的混凝土排污管的标准试验方法(米制)》.pdf_第1页
第1页 / 共3页
ASTM C1618M-2005 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压的混凝土排污管的标准试验方法(米制)》.pdf_第2页
第2页 / 共3页
ASTM C1618M-2005 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压的混凝土排污管的标准试验方法(米制)》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C 1618M 05METRICStandard Test Method forConcrete Sanitary Sewer Pipe by Negative (Vacuum) orPositive Air Pressure Metric1This standard is issued under the fixed designation C 1618M; the number immediately following the designation indicates the year oforiginal adoption or, in the case o

2、f revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers procedures for testing of precastconcrete pipe sections, prior to del

3、ivery, where maximum fieldleakage rates are specified.1.2 Tests described in this standard are intended to be usedat the point of manufacture of the concrete pipe and are notintended for testing installed pipe (for field tests see PracticesC 924, C 969, and C 1214). The user of this specification is

4、advised that individual or multiple pipe sections may be testedfor the purpose of testing the pipe barrel and additionally thejoints in straight alignment when multiple pipe sections aretested.1.3 The two leakage rates shown, which were used incalculating the test times, were chosen based on two gen

5、erallyaccepted field air and vacuum test criteria. Test times are basedon leakage rates and therefore are proportional only to the pipediameter and are constant for any length of test pipe orpipeline.1.4 The values stated in SI units are to be regarded asstandard. No other units of measurement are i

6、ncluded in thisstandard.NOTE 1The availability of this test procedure for concrete pipe variesfrom location to location. Check with local supplier(s) for availability andrecommendations.1.5 This standard does not purport to address all the safetyconcerns, if any, associated with its use. It is the r

7、esponsibilityof the user of this standard to establish the appropriate safetyand health practices and to determine the applicability ofregulatory limitations prior to its use. See Section 6 for specificsafety precautions.2. Referenced Documents2.1 ASTM Standards:2C 822 Terminology Relating to Concre

8、te Pipe and RelatedPracticeC 924 Practice for Testing Concrete Sewer Lines by Low-Pressure Air Test MethodsC 969 Practice for Infiltration and Exfiltration AcceptanceTesting of Installed Precast Concrete Pipe Sewer LinesC 1214 Practice for Testing Concrete Pipe Sewer Lines byNegative Air Pressure (V

9、acuum) Test Method3. Terminology3.1 Definitions: For definitions of terms related to precastconcrete pipe, see Terminology C 822.4. Summary of Test Method4.1 The pipe to be tested shall be sealed at the outer endswith suitable airtight bulkheads. The manufacturer shall chooseto use either low-pressu

10、re air or negative pressure air (vacuum)test methods to evaluate the condition of the pipe beforedelivery. The change in the internal pressure during a specifiedtime is used to determine the acceptability of the pipe.5. Significance and Use5.1 This is a quality test control performed at the manufac-

11、turing plant to establish that the finished, shippable pipe meetsthe leakage limits stated in the specifications.6. Safety Precautions6.1 The user of this specification is advised of the following:1This test method is under the jurisdiction of ASTM Committee C13 onConcrete Pipe and is the direct res

12、ponsibility of Subcommittee C13.09 on Methodsof Test.Current edition approved May 1, 2005. Published June 2005.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the s

13、tandards Document Summary page onthe ASTM website1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6.1.1 This test may be dangerous if a pipe is not preparedproperly and proper procedures are not followed.6.1.2 No one should be allowed

14、 near the ends of the pipe ortest bulkheads during the test.7. Apparatus7.1 For positive air pressure test, one bulkhead shall includea remote controlled valve that will release the internal testpressure.7.2 For the low-pressure air test, tie rods or an external testframe that is designed to resist

15、the force caused by internal airpressure shall be used to restrain the bulkheads. The low-pressure air test assembly shall be protected by a relief valveset to release at a pressure no greater than 42 kPa. Thebulkheads used for negative pressure air tests do not requireexternal restraints.7.3 The pr

16、essure or vacuum pumps shall have adequatecapacity to obtain the required test pressure.7.4 The test pressure shall be measured with a gage ormanometer that is precise enough to measure the increments ofpressure change specified by this standard.7.5 The pressure measuring devices shall be located in

17、 asafe area where they can be observed without danger to testpersonnel.8. Preparation of the Pipe8.1 Allow the test pipe to cool to ambient air temperature.NOTE 2A wetted pipe is desirable and will produce more consistenttest results. Air may pass through the walls of dry pipe.8.2 The pipe joint sha

18、ll be visually inspected for smooth-ness. The dimensions of the gasket bearing surfaces shall beverified to be within tolerances that were established in thedesign criteria.8.3 Test bulkheads shall be installed on the outer ends of thepipe section(s).8.4 Longitudinal tie rods or an external test fra

19、me shall beused to secure bulkheads used for low-pressure air tests.Review safety precautions found in Section 6.9. Procedure for Negative Air Pressure (Vacuum) Test.9.1 Negative air pressure tests are intended for use on pipe2400 mm in diameter and smaller.9.2 A vacuum pump shall be used to increas

20、e the negativepressure of the bulkheaded pipe until the manometer readsapproximately 27.6 kPa. Close off the vacuum source.9.3 When the negative pressure and temperature have sta-bilized and the negative pressure is less than the starting testpressure of 24.1 kPa, begin the test by allowing the nega

21、tivepressure to increase to 24.1 kPa. At that point, the recording oftest time shall be initiated. If the change in pressure is nogreater than 0.3667 kPa in the test time specified in Table 1, thepipe is acceptable.NOTE 3The manufacturer is not prohibited from increasing the testpressure above the r

22、equired 24.1 kPa and reducing the test times found inTable 1 proportional to the increase in test pressure. The allowable changein pressure of 0.3667 kPa must be maintained.10. Procedure For Positive Air Pressure Test10.1 Positive pressure air tests are intended to be used onpipe 600 mm in diameter

23、and smaller.10.2 A pressure pump shall be used to increase the internalair pressure of the bulkheaded pipe until the pressure gagereads approximately 27.6 kPa. Close off the air pressuresource.10.3 When the pressure and temperature have stabilized andthe pressure is above the starting test pressure

24、of 24 kPa, beginthe test by allowing the pressure to drop to 24 kPa. At thatpoint, the recording of the test time shall be initiated. If thedrop in pressure is no greater than 0.3668 kPa in the test timespecified in Table 2, the pipe is acceptable.11. Precision and Bias11.1 No justifiable statement

25、is presently capable of beingmade either on the precision or bias of this procedure since thetest results merely state whether there is conformance tocriteria for the success specified. Due to sealing effects ofground water and internal flow on the pipeline, the testconditions and results are not re

26、producible.12. Repairs12.1 This specification does not prohibit concrete pipesections that fail the air leakage test from being repaired andretested.TABLE 1 Test Times For Negative Pressure Air Test, SecondsNOTE 1A pressure increase of 0.3667 kPa was chosen because itcorresponds to a change in water

27、 column height of approximately 38 mm(37.4015 mm exactly) and a change in manometer oil column height(specific gravity 2.945) of 12 mm. Test times shall be increased propor-tionally if larger changes in the height of the manometer column arerequired.NOTE 2The two leakage rates shown, which were used

28、 in calculatingthe test times, were chosen based on two generally accepted field air andvacuum test criteria.NOTE 3Test times are based on leakage rates and therefore areproportional only to the pipe diameter and are constant for any length oftest pipe or pipeline.Pipe Size, mm 0.000523 CMM/m20.0009

29、21 CMM/m2300 32 18375 41 23450 49 28525 57 32600 64 36675 73 41750 81 46825 90 51900 97 551050 114 641200 128 721350 146 821500 162 921650 180 1021800 194 1101950 209 1182100 226 128C 1618M 052ASTM International takes no position respecting the validity of any patent rights asserted in connection wi

30、th any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible tech

31、nical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful considerat

32、ion at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Ha

33、rbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(ww

34、w.astm.org).TABLE 2 Test Times For Positive Air Pressure Test, SecondsNOTE 1A pressure decrease of 0.3668 kPa was chosen because itcorresponds to a change in water column height of approximately 38 mm(37.4015 mm exactly) and a change in manometer oil column height(specific gravity 2.945) of 12 mm. T

35、est times shall be increased propor-tionally if larger changes in the height of the manometer column arerequired.NOTE 2The two leakage rates shown, which were used in calculatingthe test times, were chosen based on two generally accepted field air andvacuum test criteria.NOTE 3Test times are based on leakage rates and therefore areproportional only to the pipe diameter and are constant for any length oftest pipe or pipeline.Pipe Size, mm 0.000523 CMM/m20.000921 CMM/m2300 32 18375 41 23450 49 28525 57 32600 64 36C 1618M 053