ASTM C359-2007 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《水凝水泥早硬化的标准试验方法(灰浆法)》.pdf

上传人:eastlab115 文档编号:466359 上传时间:2018-11-27 格式:PDF 页数:4 大小:82.82KB
下载 相关 举报
ASTM C359-2007 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《水凝水泥早硬化的标准试验方法(灰浆法)》.pdf_第1页
第1页 / 共4页
ASTM C359-2007 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《水凝水泥早硬化的标准试验方法(灰浆法)》.pdf_第2页
第2页 / 共4页
ASTM C359-2007 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《水凝水泥早硬化的标准试验方法(灰浆法)》.pdf_第3页
第3页 / 共4页
ASTM C359-2007 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《水凝水泥早硬化的标准试验方法(灰浆法)》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C 359 07Standard Test Method forEarly Stiffening of Hydraulic Cement (Mortar Method)1This standard is issued under the fixed designation C 359; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.

2、 A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method covers the determination of earlystiffening in hydraulic-cement mortar.1.2 The values stated in SI units are the

3、standard. The valuesin parentheses are for information only.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-b

4、ility of regulatory limitations prior to use. (WarningFreshhydraulic cementitious mixtures are caustic and may causechemical burns to skin and tissue upon prolonged exposure.The use of gloves, protective clothing, and eye protection isrecommended. Wash contact area with copious amounts ofwater after

5、 contact. Wash eyes for a minimum of 15 min.Avoidexposure of the body to clothing saturated with the liquid phaseof the unhardened material. Remove contaminated clothingimmediately after exposure.2)1.4 The text of this standard references notes and footnoteswhich provide explanatory material. These

6、notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.2. Referenced Documents2.1 ASTM Standards:3C 183 Practice for Sampling and the Amount of Testing ofHydraulic CementC 185 Test Method for Air Content of Hydraulic CementMortarC 187 Test M

7、ethod for Normal Consistency of HydraulicCementC 305 Practice for Mechanical Mixing of Hydraulic CementPastes and Mortars of Plastic ConsistencyC 670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction MaterialsC 778 Specification for Standard SandC 1005 Specificati

8、on for Reference Masses and Devices forDetermining Mass and Volume for Use in the PhysicalTesting of Hydraulic CementsD 1193 Specification for Reagent WaterE 2251 Specification for Liquid-in-Glass ASTM Thermom-eters with Low-Hazard Precision Liquids3. Terminology3.1 Definitions:3.1.1 early stiffenin

9、g, nthe early development of stiffnessin the working characteristics of a hydraulic-cement paste,mortar, or concrete; varieties include false set and flash set.3.1.2 false set, nthe early development of stiffness in theworking characteristics of a hydraulic-cement paste, mortar, orconcrete without t

10、he evolution of much heat, which stiffnesscan be dispelled and plasticity regained by further mixingwithout addition of water; also known as “grab set,” “premature stiffening,” “hesitation set,” and “rubber set.”3.1.3 flash set, nthe early development of stiffness in theworking characteristics of a

11、hydraulic-cement paste, mortar, orconcrete, usually with the evolution of considerable heat,which stiffness cannot be dispelled nor can the plasticity beregained by further mixing without addition of water; alsoknown as “quick set.”4. Summary of Test Method4.1 A mortar is prepared with the cement to

12、 be tested, usingspecified quantities of cement, standard sand, and an amount ofwater that will produce a mortar with an initial penetration of46 6 3 mm, using the modified Vicat apparatus. Measurementsof penetration are made at stipulated intervals after the begin-ning of the mixing procedure. Upon

13、 completion of the firstseries of penetration measurements, the mortar is returned tothe mixer to be remixed. Following the remix procedure, anadditional penetration, termed the remix penetration, is deter-mined. The report is a tabulation of the penetration measure-ments and the amount of mixing wa

14、ter used.1This test method is under the jurisdiction of ASTM Committee C01 on Cementand is the direct responsibility of Subcommittee C01.30 on Time of Set.Current edition approved June 1, 2007. Published July 2007. Originally approvedin 1955. Last previous edition approved in 2006 as C 359 06.2Secti

15、on on Safety, Manual of Cement Testing, Annual Book of ASTMStandards, Vol 04.01.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page

16、onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5. Significance and Use5.1 The purpose of this test method is to determine thedegree to which a ceme

17、nt mortar develops early stiffening. It isintended for use by those interested in methods for determiningthe potential early stiffening of hydraulic cement.5.2 When used for estimating the relative tendency of acement to manifest early stiffening, a judgment may be madeby comparing the behavior in t

18、he penetration series (see 10.4.1and 10.4.2) and the remix procedure (see 10.4.3) to differen-tiate a relatively less serious and less persistent tendency toearly stiffening (false set) from one that is more persistent and,consequently, more serious (flash set).5.3 Severe false setting in a cement m

19、ay cause difficultyfrom a placing and handling standpoint, but it is not likely tocause difficulties where concrete is mixed for a longer timethan usual, as usually occurs in transit mixing, or where it isremixed prior to placing or transporting, in concrete pumpingoperations. It is most likely noti

20、ced where concrete is mixedfor a short period of time in stationary mixers and transportedto the forms in non-agitating equipment, as on some pavingjobs, and when concrete is made in an on-site batch plant.5.4 Cements with severe false setting usually requireslightly more mixing water to produce the

21、 same consistency,which may result in slightly lower strengths and increaseddrying shrinkage.5.5 Early stiffening resulting from false set is not likely tocause a cement to fail the applicable time of setting require-ment.5.6 Early stiffening resulting from flash set, depending onseverity, can cause

22、 a cement to fail the applicable time ofsetting requirement.6. Apparatus6.1 Vicat Apparatus, conforming to the requirements ofFig. 1 in Test Method C 187, with the following modifications:6.1.1 The 1-mm needle shall be replaced by a mass, suchthat the total mass of the 10-mm plunger, indicator, and

23、addedmass shall be 400 6 0.5 g.6.2 Spoon, conforming to the requirements of Test MethodC 185.6.3 Mixer, Bowl, Paddle, and Scraper, conforming to therequirements of Practice C 305.6.4 Glass Graduates, 200 or 250 mL capacity, conformingto the requirements of Specification C 1005.6.5 Masses and Mass De

24、termining Devices, conforming tothe requirements of Specification C 1005. The devices fordetermining mass shall be evaluated for precision and bias at atotal load of 1000 g.6.6 Thermometer, ASTM No. S12C or S12F, conforming tothe requirements of Specification E 2251.6.7 Flat Trowel, having a sharpen

25、ed straight-edged steelblade 100 to 150 mm in length.6.8 Clock Timer, having a readability to the nearest second.6.9 Containers, approximately 50 by 50 by 150 mm (2 by 2by 6 in.) inside dimensions (Fig. 1). These containers, whichmay be made of any suitable materials such as sheet metal orplastic, s

26、hall be rigid, watertight, and at least 50 mm (2 in.)deep.7. Reagents and Materials7.1 Standard Sand, 20-30 and Graded, conforming to therequirements of Specification C 778.7.2 Mixing WaterPotable water is satisfactory for routinetests. For all referee and cooperative tests, reagent waterconforming

27、to the requirements of Specification D 1193 forType III or Type IV grades of reagent water shall be used.8. Sampling8.1 When the test is part of acceptance testing, sample thecement in accordance with Practice C 183.9. Conditioning9.1 Maintain the temperature of the room, dry materials,paddle, bowl,

28、 and containers at 23.0 6 3.0 C.9.2 The relative humidity of the laboratory shall not be lessthan 50 %.10. Procedure10.1 BatchMix at one time 600 g of cement, 300 g ofgraded standard sand, 300 g of 20-30 standard sand, and anamount of water that produces a mortar with an initialpenetration of 46 6 3

29、 mm.10.2 Mixing of MortarMix in the mechanical mixer asfollows:10.2.1 Place the sand and cement in the dry bowl, and mixthe dry materials for a few seconds with the spoon.10.2.2 Place the bowl in the mixer, set the paddle in place,and mix the dry materials for 10 s at a slow speed (140 6 5r/min).10.

30、2.3 With the mixer operating at a slow speed (140 6 5r/min), add the entire quantity of mixing water within 5 s. Stopthe mixer, quickly change to a medium speed (285 6 10r/min), and continue the mixing for 1 min, timing from the firstaddition of water.10.2.4 Stop the mixer, scrape the sides of the m

31、ixing bowlwith the rubber scraper, and quickly place the thermometer inthe mortar. Allow it to stand undisturbed for the remainder ofa 45-s interval from the time of stopping the mixer.10.2.5 Read the temperature, remove the thermometer, startthe mixer, and mix for 15 s at a medium speed (285 6 10r/

32、min). If the mortar temperature is not in the range from 23 62.0 C, discard the batch and adjust the temperature of thewater or sand, or both, to give the required temperature.10.3 Filling Container:FIG. 1 Container for Early Stiffening TestsC35907210.3.1 Immediately after completion of the mixing,

33、removethe bowl from the mixer and with a spoon, uniformly distributea portion of the mortar into the container until the container isheaping full. Quickly and gently place each spoonful of mortarin the container. When removing the mortar from the bowl, donot remove the material pushed up on the side

34、 of the bowl bythe paddle. After the container has been filled, reassemble themixer, cover the bowl with a lid, and retain the remainingmortar for a remix test to be performed later. To compact themortar in the container, lift the container approximately 80 mm(3 in.) from the table with both hands a

35、nd rap it twice againstthe surface of the table.10.3.2 With the leading edge slightly raised, strike off themortar with one stroke of the trowel along the length of thecontainer. Then remove the excess mortar by means of asawing motion with the straightedge of the trowel along thelength of the conta

36、iner in a direction opposite to that used instriking off. Then, smooth the surface of the mortar with asingle stroke of the trowel.10.4 Penetration Tests:10.4.1 After filling the container, immediately place the10-mm plunger of the modified Vicat apparatus in contact withthe surface of the mortar at

37、 the midpoint of the container on thelongitudinal center line. Set the movable indicator at zero.Release the plunger 3 min after the beginning of the wetmixing and record, as the initial penetration, the depth inmillimetres to which the plunger has settled below the surface10 s after being released.

38、 If the plunger does not settle to adepth of 46 6 3 mm, discard the batch and adjust the quantityof water to produce the required consistency.10.4.2 Immediately withdraw and clean the plunger. In asimilar manner, determine, after moving the Vicat apparatus tothe desired location, the penetrations at

39、 intervals of 5, 8, and 11min after the beginning of mixing. Do not move the filledcontainer until these measurements are completed. Make allpenetrations along the longitudinal center line of the container.Obtain 5 and 8-min penetrations at a distance of approximately40 mm (112 in.) from each end of

40、 the container, respectively,and determine the 11-min penetration at a point approximatelymidway between the points at which the initial and 5-minpenetrations were determined.10.4.3 At the completion of the measurement of the 11-minpenetration, immediately return the mortar in the container tothe bo

41、wl. Start the mixer, raise the bowl into mixing position,and remix the contents of the bowl at medium speed (285 6 10r/min) for 1 min. Fill a clean container as outlined in 10.3.1 and10.3.2, and determine the penetration 45 s after completion ofmixing.11. Calculation11.1 Early Stiffening AmountThe c

42、hange in penetrationfrom the initial penetration to the 11 min penetration.11.1.1 Calculate as follows: A D, where:A = Initial PenetrationB = Penetration at 5 minC = Penetration at 8 minD = Penetration at 11 minE = Penetration after REMIX11.1.2 Report to the nearest mm.11.2 Average Early Stiffening

43、RateAn average of the rateof penetration change between each set of measurements.11.2.1 Calculate as follows:A 2 B21B 2 C31C 2 D33where A,B,C,D are as defined in 11.1.1.11.2.2 Report to the nearest 0.1 mm/min.11.3 Early Stiffening RecoveryThe percent penetrationrecovery accomplished with the REMIX p

44、rocedure.11.3.1 Calculate as follows:100 *EAwhere E and A are as defined in 11.1.1. (See Note 2)11.3.2 Report to the nearest percent.12. Report12.1 Report the measured and calculated values as shownbelow:Mixing Water _mLInitial penetration _mm5-min penetration _mm8-min penetration _mm11-min penetrat

45、ion _mmRemix penetration _mmEarly Stiffening Amount _mmAverage Early Stiffening Rate _mm/minEarly Stiffening Recovery _%13. Precision and Bias413.1 Early Stiffening Amount13.1.1 The single-operator standard deviation has beenfound to be 1.8 mm over a range from 35 to 49 mm. Therefore,results of two

46、properly conducted tests by the same operator onthe same material are not expected to differ by more than 5mm. (See Note 3)13.1.2 The multilaboratory standard deviation has beenfound to be 2.5 mm over a range from 35 to 49 mm. Therefore,results of two properly conducted tests from two differentlabor

47、atories on samples of the same cement are not expected todiffer by more than 7 mm. (See Note 3)13.2 Average Early Stiffening Rate13.2.1 The single-operator standard deviation has beenfound to be 0.50 mm/min over a range from 4.0 to 8.0 mm/min.Therefore, results of two properly conducted tests by the

48、 sameoperator on the same material are not expected to differ bymore than 1.4 mm/min. (See Note 3)13.2.2 The multilaboratory standard deviation has beenfound to be 0.86 mm/min over a range from 4.0 to 8.0 mm/min.Therefore, results of two properly conducted tests from twodifferent laboratories on sam

49、ples of the same cement are notexpected to differ by more than 2.4 mm/min. (See Note 3)13.3 Early Stiffening Recovery13.3.1 The single-operator standard deviation has beenfound to be 6.6 % over a range from 40 to 100+ %. (See Note2) Therefore, results of two properly conducted tests by the4Supporting data have been filed at ASTM International Headquarters and maybe obtained by requesting Research Report RR: C01-1008.C359073same operator on the same material are not expected to differby more than 19 %. (See Note 3)13.3.2 The multilaboratory standard de

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1