[外语类试卷]笔译三级综合能力语气练习试卷3及答案与解析.doc

上传人:deputyduring120 文档编号:485471 上传时间:2018-11-28 格式:DOC 页数:4 大小:28KB
下载 相关 举报
[外语类试卷]笔译三级综合能力语气练习试卷3及答案与解析.doc_第1页
第1页 / 共4页
[外语类试卷]笔译三级综合能力语气练习试卷3及答案与解析.doc_第2页
第2页 / 共4页
[外语类试卷]笔译三级综合能力语气练习试卷3及答案与解析.doc_第3页
第3页 / 共4页
[外语类试卷]笔译三级综合能力语气练习试卷3及答案与解析.doc_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、笔译三级综合能力语气练习试卷 3及答案与解析 一、 PART 3 Cloze Test (20 points) In the following passage, there are 20 blanks representing words that are missing from the context. You are to put each of the blanks the missing word. The time for this part is 20 minutes. 0 A Bushs Legacy ( )布什的遗产 ( ) President Bush arrived i

2、n Washington and forged ahead with an ambitious agenda- (1) tax cuts, vast changes in federal social programs, expansions of executive power and (2) broad remaking of energy and education policies. Claiming a mandate by simply declaring (3) existence, his early successes dazzled his critics. With gu

3、ru Karl Rove directing the (4) , Bush won a stunning series of political victories. He muscled his agenda through (5) friendly Congress, and gained seats for his party in the 2002 midterm elections. (6) biggest triumph came in 2004, when he won a second term despite a (7) unpopular war. The “permane

4、nt“ Republican majority he and Rove envisioned even seemed attainable (8) Bush plunged himself into his most ambitious legislative effort yet: a partial privatization (9) Social Security. But the president who boasted about “political capital“ in the heady (10) after his re-election now faces the wo

5、rst of political fates as he enters (11) final year in office: borderline irrelevance. The presidents second term has (12) defined by legislative paralysis, marked by record-low approval ratings, presidential candidates who are (13) from his shadow, and a lingering war thats sapping his remaining re

6、servoirs of (14) . As he enters his final year in office with the war continuing, Republican (15) for president bolting from his shadow, and his party back in the minority (16) Congress, he is politically weakened, an early entry into lame-duck status. And the (17) Washington atmosphere he hoped to

7、cure is just as nasty as it was (18) he came to office seven years ago. “lies left our political institutions much (19) troubled than they were before,“ said Thomas E. Mann, a senior fellow at (20) Brookings Institution, a Washington-based think tank. “He didnt create the ideological polarization, b

8、ut he magnified it. “ 笔译三级综合能力语气练习试卷 3答案与解析 一、 PART 3 Cloze Test (20 points) In the following passage, there are 20 blanks representing words that are missing from the context. You are to put each of the blanks the missing word. The time for this part is 20 minutes. 【知识模块】 语气 1 【正确答案】 deep 【知识模块】 语气

9、 2 【正确答案】 a 【知识模块】 语气 3 【正确答案】 its 【知识模块】 语气 4 【正确答案】 action 【知识模块 】 语气 5 【正确答案】 a 【知识模块】 语气 6 【正确答案】 His 【知识模块】 语气 7 【正确答案】 widely 【知识模块】 语气 8 【正确答案】 as 【知识模块】 语气 9 【正确答案】 of 【知识模块】 语气 10 【正确答案】 days 【知识模块】 语气 11 【正确答案】 his 【知识模块】 语气 12 【正确答案】 been 【知识模块】 语气 13 【正确答案】 running 【知识模块】 语气 14 【正确答案】 support 【知识模块】 语气 15 【正确答案】 candidates 【知识模块】 语气 16 【正确答案】 in 【知识模块】 语气 17 【正确答案】 poisonous 【知识模块】 语气 18 【正确答案】 when 【知识模块】 语气 19 【正确答案】 more 【知识模块】 语气 20 【正确答案】 the 【知识模块】 语气

展开阅读全文
相关资源
猜你喜欢
  • API RP 7C-11F-1994 Recommended Practice for Installation Maintenance and Operation of Internal-Combustion Engines (FIFTH EDITION)《内燃式发电机的安装、维护和操作》.pdf API RP 7C-11F-1994 Recommended Practice for Installation Maintenance and Operation of Internal-Combustion Engines (FIFTH EDITION)《内燃式发电机的安装、维护和操作》.pdf
  • API RP 7G-1998 Recommended Practice for Drill Stem Design and Operating Limits (SIXTEENTH EDITION Effective December 1 1998 ERTA May 2000 Addendum 1 April 2009 Addendum 2 September.pdf API RP 7G-1998 Recommended Practice for Drill Stem Design and Operating Limits (SIXTEENTH EDITION Effective December 1 1998 ERTA May 2000 Addendum 1 April 2009 Addendum 2 September.pdf
  • API RP 7HU1-2009 Safe Use of 2-inch Hammer Unions for Oilfield Applications (FIRST EDITION ERTA February 2014)《油田设施用2英寸捶打接头的安全使用.第1版》.pdf API RP 7HU1-2009 Safe Use of 2-inch Hammer Unions for Oilfield Applications (FIRST EDITION ERTA February 2014)《油田设施用2英寸捶打接头的安全使用.第1版》.pdf
  • API RP 80-2000 Guidance for the Definition of Onshore Gas Gathering Lines (FIRST EDITION)《海上天然气集成管线定义准则推荐作法.第1版》.pdf API RP 80-2000 Guidance for the Definition of Onshore Gas Gathering Lines (FIRST EDITION)《海上天然气集成管线定义准则推荐作法.第1版》.pdf
  • API RP 85-2003 Use of Subsea Wet-gas Flowmeters in Allocation Measurement Systems (FIRST EDITION)《分配测量系统中水下湿气体流量计的使用.第1版》.pdf API RP 85-2003 Use of Subsea Wet-gas Flowmeters in Allocation Measurement Systems (FIRST EDITION)《分配测量系统中水下湿气体流量计的使用.第1版》.pdf
  • API RP 90-2006 Annular Casing Pressure Management for Offshore Wells (FIRST EDITION)《离岸井的环形套管压力管理.第1版》.pdf API RP 90-2006 Annular Casing Pressure Management for Offshore Wells (FIRST EDITION)《离岸井的环形套管压力管理.第1版》.pdf
  • API RP 92U-2008 Underbalanced Drilling Operations (FIRST EDITION ADD November 2015)《欠平衡钻井操作.第1版》.pdf API RP 92U-2008 Underbalanced Drilling Operations (FIRST EDITION ADD November 2015)《欠平衡钻井操作.第1版》.pdf
  • API RP 932-B-2012 Design Materials Fabrication Operation and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems (SECOND EDITI.pdf API RP 932-B-2012 Design Materials Fabrication Operation and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems (SECOND EDITI.pdf
  • API RP 934-A RUSSIAN-2008 Materials and Fabrication of 2 1 4Cr-1Mo 2 1 4Cr-1Mo-1 4V 3Cr-1Mo and 3Cr-1Mo-1 4V Steel Heavy Wall Pressure Vessels for High-temperature High-pressure Hy.pdf API RP 934-A RUSSIAN-2008 Materials and Fabrication of 2 1 4Cr-1Mo 2 1 4Cr-1Mo-1 4V 3Cr-1Mo and 3Cr-1Mo-1 4V Steel Heavy Wall Pressure Vessels for High-temperature High-pressure Hy.pdf
  • 相关搜索

    当前位置:首页 > 考试资料 > 外语考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1