ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf

上传人:orderah291 文档编号:520409 上传时间:2018-12-03 格式:PDF 页数:8 大小:130.11KB
下载 相关 举报
ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf_第1页
第1页 / 共8页
ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf_第2页
第2页 / 共8页
ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf_第3页
第3页 / 共8页
ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf_第4页
第4页 / 共8页
ASTM D5674-1995(2003) Standard Guide for Operation of a Gaging Station《测量站工作标准导则》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: D 5674 95 (Reapproved 2003)Standard Guide forOperation of a Gaging Station1This standard is issued under the fixed designation D 5674; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number

2、 in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 The guide covers procedures used commonly for thesystematic collection of streamflow information. Continuousstreamflow information is necess

3、ary for understanding theamount and variability of water for many uses, including watersupply, waste dilution, irrigation, hydropower, and reservoirdesign.1.2 The procedures described in this guide are used widelyby those responsible for the collection of streamflow data, forexample, the U.S. Geolog

4、ical Survey, Bureau of Reclamation,U.S. Army Corps of Engineers, U.S. Department of Agricul-ture, Water Survey Canada, and many state and provincialagencies. The procedures are generally from internal docu-ments of the preceding agencies, which have become thedefacto standards used in North America.

5、1.3 It is the responsibility of the user of the guide todetermine the acceptability of a specific device or procedure tomeet operational requirements. Compatibility between sensors,recorders, retrieval equipment, and operational systems isnecessary, and data requirements and environmental operatingc

6、onditions must be considered in equipment selection.1.4 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformation only.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is the

7、responsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:D 1129 Terminology Relating to Water2D 1941 Test Method for Open Channel Flow Measuremen

8、tof Water with the Parshall Flume2D 3858 Practice for Open-Channel Flow Measurement ofWater by Velocity-Area Method2D 5129 Test Method for Open Channel Flow Measurementof Water Indirectly by Using Width Contractions2D 5130 Test Method for Open-Channel Flow Measurementof Water Indirectly by Slope-Are

9、a Method2D 5242 Test Method for Open-Channel Flow Measurementof Water with Thin-Plate Weirs2D 5243 Test Method for Open-Channel Flow Measurementof Water Indirectly at Culverts2D 5388 Test Method for Indirect Measurements of Dis-charge by Step-Backwater Method2D 5389 Test Method for Open Channel Flow

10、 Measurementby Acoustic Velocity Meter Systems2D 5390 Test Method for Open Channel Flow Measurementof Water with Palmer-Bowlus Flumes2D 5413 Test Method for Measurement of Water Levels inOpen-Water Bodies2D 5541 Practice for Developing Stage-Discharge Relationfor Open-Channel Flow22.2 ISO Standards:

11、3ISO 1100 Liquid Flow Measurement in Open ChannelsPart I: Establishment and Operation of a Gauging StationISO 6416 Measurement of Discharge by Ultrasonic (Acous-tic) Method3. Terminology3.1 DefinitionsFor definitions of terms used in this guide,refer to Terminology D 1129.3.2 Definitions of Terms Sp

12、ecific to This Standard:3.2.1 controlthe physical properties of a channel, whichdetermine the relationship between the stage and discharge ofa location in the channel.3.2.2 datuma level plane that represents zero elevation.3.2.3 dischargethe volume of water flowing through across-section in a unit o

13、f time, including sediment or othersolids that may be dissolved in or mixed with the water; usuallycubic feet per second (f3/s) or metres per second (m/s).3.2.4 elevationthe vertical distance from a datum to apoint; also termed stage or gage height.3.2.5 gagea generic term that includes water level

14、mea-suring devices.3.2.6 gage datuma datum whose surface is at the zeroelevation of all of the gages at a gaging station. This datum is1This guide is under the jurisdiction of ASTM Committee D19 on Water and isthe direct responsibility of Subcommittee D19.07 on Sediments, Geomorphology,and Open-Chan

15、nel Flow.Current edition approved June 10, 2003. Published August 2003. Originallyapproved in 1995. Last previous edition approved in 1999 as D 5674 95 (1999).2Annual Book of ASTM Standards, Vol 11.01.3Measurement of Liquid Flow in Open Channels, ISO Standards Handbook 16,1983.Available fromAmerican

16、 National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.often at a known elevation referenced to the national geodeticvertical datum (NGVD) of 1929.3.2.7 gage

17、 heightthe height of a water surface above anestablished or arbitrary datum at a particular gaging station;also termed stage.3.2.8 gaging stationa particular site on a stream, canal,lake, or reservoir at which systematic observations of hydro-logic data are obtained.3.2.9 national geodetic vertical

18、datum (NGVD) of 1929prior to 1973 known as mean sea level datum, a spheroidaldatum in the conterminous United States and Canada thatapproximates mean sea level but does not necessarily agreewith sea level at a specific location.3.2.10 stilling wella well connected to the stream withintake pipes in s

19、uch a manner that it permits the measurementof stage in relatively still water.4. Summary of Guide4.1 A gaging station is usually installed where a continuousrecord of stage or discharge is required. A unique relationshipexists between water surface elevation and discharge (flowrate) in most freely

20、flowing streams. Water-level recordinginstruments continuously record the water surface elevation,usually termed stage or gage height. Discharge measurementsare taken of the stream discharge to develop a stage-dischargecurve. The discharge data are computed from recorded stagedata by a stage-dischar

21、ge rating curve.5. Significance and Use5.1 This guide is useful when a systematic record of watersurface elevation or discharge is required at a specific location.Some gaging stations may be operated for only a few months;however, many have been operated for a century.5.2 Gaging station records are

22、used for many purposes:5.2.1 Resource appraisal of long-term records to determinethe maximum, minimum, and variability of flows of a particu-lar stream. These data can be used for the planning and designof a variety of surface water-related projects such as watersupply, flood control, hydroelectric

23、developments, irrigation,recreation, and waste assimilation.5.2.2 Management, where flow data are required for theoperation of a surface-water structure or other managementdecision.6. Site Location6.1 The general location of the station will be dependent onthe purpose for which the station is establ

24、ished. Locationconstraints for a resource appraisal-type station may be quitebroad, for example, between major tributaries. Constraints fora management-type station may require a location just below adam, contaminant discharge point, or other point at whichdischarge information is required specifica

25、lly.6.2 Site RequirementsCertain hydraulic characteristics ofthe stream channel are desirable for collecting high-accuracydata of minimal cost. Hydraulically difficult sites can still begaged; however, accuracy and cost are affected adversely.Desirable conditions include the following:6.2.1 The gene

26、ral course of the river should be straight forapproximately 300 ft (100 m) above and below the gage.6.2.2 The flow is confined to one channel at all stages.6.2.3 The stream bed is stable, not subject to frequent scourand fill, and is free of aquatic growth.6.2.4 The banks are sufficiently high to co

27、ntain flow at allstages.6.2.5 A natural feature such as ledge rock outcrop or stablegravel riffle, known as a “control,” is present in the stream. Itis necessary and practical in some cases to install a low-headdam or artificial control to provide this feature. Additionalinformation on man-made stru

28、ctures is given in Test MethodsD 1941, D 5242, and D 5390.6.2.6 A pool is present behind the control where water-levelinstruments or stilling well intakes can be installed at a locationbelow the lowest stream stage. The velocity of water passingsensors in a deep pool also eliminates or minimizes dra

29、w-downeffects on stage sensors during high flow conditions.6.2.7 The site is not affected by the hydraulic effects of abridge, tributary stream entering the gaged channel, down-stream impoundment, or tidal conditions.6.2.8 A suitable site for making discharge measurements atall stages is available n

30、ear the gage site.6.2.9 There is accessibility for construction and operation ofthe gage.6.3 Site SelectionAn ideal site is rarely available, andjudgement must be exercised when choosing between possiblesites to determine that meeting the best combination offeatures.6.3.1 Offce ReconnaissanceThe sea

31、rch for a gaging sta-tion begins with defining the limits along the stream at whichthe gage must be located on topographic maps of the area. Thetopographic information will indicate approximate bankheights or overflow areas, general channel width, constrictions,slope, roads, land use, locations of b

32、uildings, and other usefulinformation so that promising locations can be checked out inthe field.6.3.2 Field ReconnaissanceIf the range of possible gagelocations is large, flying over the stream at a low altitude in asmall aircraft is an efficient way of checking for promisingsites. The view from th

33、e air on a clear day is much more helpfulthan peering off of a few highway bridges. Traversing thechannel in a canoe or small boat is an alternative method. Fieldreconnaissance is best performed during low flow conditions;however, additional reconnaissance at high flow conditions andunder ice-covere

34、d conditions for northern streams adds datathat result in improved site selection.6.3.3 Logistical ReconnaissanceOnce a site has beenselected that meets hydraulic considerations, and before designor construction begins, the following should occur:6.3.3.1 Property ownership must be ascertained and le

35、galpermission secured to install and maintain the gage. This mayinclude multiple landowners, especially if a cableway isrequired from which to make discharge measurements.6.3.3.2 Necessary permits must be obtained from applicablegoverning agencies for, but not limited to, building andexcavation, str

36、eam bank permits, and FAA notification forcableways or other local requirements.6.3.3.3 Where electrical or phone service is required foroperation, the availability of this service should be verified.D 5674 95 (2003)26.3.3.4 Most gaging stations are intended to record over therange of stream stages.

37、 It is therefore important to obtain anylocal information available on historical flood levels and tomake estimates of stage for a 100-year event using locally usedflood-frequency equations. A cross-section survey of the chan-nel should be obtained during field reconnaissance to aid inestimating hig

38、h flow stage.6.4 More detailed information is available in Refs (1-3)4and ISO-1100.7. Types of Gaging Stations7.1 Non-recording stations can be as simple as a permanentstaff gage attached to a bridge, pier, or other structure, which isread and recorded manually in an appropriate notebook once ormore

39、 each day. For details on non-recording gages, see TestMethods D 5413, ISO 1100, and Refs (1-4).7.2 Recording gages are usually nonattended installationsthat require a sensor in direct contact with the water that isconnected mechanically or electrically to a recording device.7.2.1 Stilling well-type

40、 gages use a vertical well installed inthe stream bank with small-diameter intake pipes connectingthe river to the well. In this type of installation, a float on thewater surface in the well drives a recorder housed in a shelterover the well by mechanical means (Fig. 1). Stilling well gagestend to p

41、rovide more reliable data because water-level sensingas well as recording components of the system are protectedfrom direct installation in the stream. Disadvantages arelocations with unstable stream channels that may move awayfrom the intakes and higher initial cost. For details on stillingwell gag

42、es, see Test Methods D 5413, ISO 1100, and Refs (1-3,5).7.2.2 Bubbler-type gages consist of a gas supply, usuallynitrogen, which is fed through a controller and tube to anorifice attached near the bed of a stream. The gas pressure isequal to the liquid head in the stream. A pressure transducer,mercu

43、ry, or balance-beam manometer senses this pressure andpasses this information either mechanically or electronically toa compatible recorder (Fig. 2). The advantage to this system isless expensive construction costs, which is especially desirablefor short-term gages or in locations in which stilling

44、wellinstallations are difficult. Disadvantages are maintaining theorifice in a stable mounting on the river bed. Keeping theorifice from being buried in silty streams is also a problem. Fordetails on bubble-gages, see Test Methods D 5413, ISO 1100,and Refs (1-3, 5, 6).7.2.3 Acoustic Velocity Meter (

45、AVM) stations directly senseand record the velocity observed between two transducers atfixed elevations in the channel cross section. The AVM gagesare used in locations in which stage-discharge relations areunreliable, usually in deep, slow-moving channels or wheretidal or bidirectional flow occurs.

46、 Additional information isgiven in Test Method D 5389.8. Gaging Station Structures8.1 Stilling Well Functional RequirementsA stilling wellmust provide a water surface at the same elevation as that ofthe stream at any point in time, dampen out the effect of surfacewaves, and provide a sensor, usually

47、 a float and recordingsystem.4The boldface numbers in parentheses refer to the list of references at the end ofthis standard.FIG. 1 Stilling Well GageD 5674 95 (2003)38.1.1 The stilling well must be sufficiently long to cover theentire range of stages that might occur reasonably.8.1.2 The stilling w

48、ell can be any shape in plan view;however, most are either round or square. Permanent long-termgages should have a large enough area to allow personnel towork inside them for servicing; the most common size isapproximately 4 by 4 ft (1.2 by 1.2 m). Some semipermanentstilling wells may be as small as

49、 1 ft (0.3 m).8.1.3 Stilling wells may be fabricated from poured concrete,concrete blocks, galvanized steel, concrete culvert pipe, orother suitable material. The well must have a sealed bottom topreclude the interchange of water from the stream and groundwater.8.1.4 Stilling wells are usually installed in a stream bank forprotection and to minimize freezing in northern climates. Theymay be attached to bridge piers or wing walls in someapplications but must be protected from damage by floatingdebris and must not interfere with flow patterns in the channel.8.1.5 Int