ASTM F2447-2005(2009) Standard Practice for Production Acceptance Test Procedures for Weight-Shift-Control Aircraft《重量转移控制飞行器的生产验收试验程序的标准实施规程》.pdf

上传人:towelfact221 文档编号:538731 上传时间:2018-12-07 格式:PDF 页数:2 大小:48.98KB
下载 相关 举报
ASTM F2447-2005(2009) Standard Practice for Production Acceptance Test Procedures for Weight-Shift-Control Aircraft《重量转移控制飞行器的生产验收试验程序的标准实施规程》.pdf_第1页
第1页 / 共2页
ASTM F2447-2005(2009) Standard Practice for Production Acceptance Test Procedures for Weight-Shift-Control Aircraft《重量转移控制飞行器的生产验收试验程序的标准实施规程》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F 2447 05 (Reapproved 2009)Standard Practice forProduction Acceptance Test Procedures for Weight-Shift-Control Aircraft1This standard is issued under the fixed designation F 2447; the number immediately following the designation indicates the year oforiginal adoption or, in the case of

2、revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 The following requirements apply for the manufactureof weight-shift-control aircraft. This pract

3、ice includes theproduction acceptance test requirements for weight-shift-control aircraft.1.2 This practice applies to aircraft seeking civil aviationauthority approval, in the form of flight certificates, flightpermits, or other like documentation.1.3 This standard does not purport to address all o

4、f thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory requirements prior to use.2. Significance and Use2.1 The purpose of this practice is to est

5、ablish that eachproduction aircraft has been assembled properly and operatesnormally throughout its entire allowable flight envelope.2.2 If final assembly is completed outside of the mainproduction facility, the manufacturer shall specify the requiredprocedures and what persons are authorized to per

6、form them.3. Production Acceptance Testing, Ground Testing3.1 Inspection VerificationThere shall be a written proce-dure in effect to verify all top-level inspections have beencompleted and no discrepancies remain open.3.2 Engine Break-InThere shall be a written procedure ineffect to perform the eng

7、ine break-in. This procedure mayinclude all engine gage verification of operation. All enginereadings shall achieve the normal accepted range of readingscommensurate with a new engine. If it is not performed duringengine break-in, then this verification must be performed underseparate procedures. Al

8、l engine gages shall be verified to beoperating. Final stages of engine break-in may be conducted inflight if a forced landing can be made safely at all times.4. Production Acceptance Testing, Flight Testing4.1 Every production aircraft shall be flight tested to thefollowing minimums:4.1.1 Fifteen m

9、inutes flight time, including at least onetakeoff and landing, trimming of controls for straight and levelflight, and verification of control for left turn, right turn, andspeed control. Turns shall be made up to the maximumallowable bank angle as prescribed by the manufacturer andspeeds (wings leve

10、l) shall be flown up to the maximumpossible for the configuration not to exceed manufacturerslimitations.4.2 Instrument VerificationThere shall be a written proce-dure in effect to verify that all other instruments are operatingwithin normal ranges. If equipped with a compass, the compassvariation c

11、ard data shall be developed with the engine running.5. Post Flight Acceptance5.1 There shall be a written procedure in effect to performpost flight inspection that will review all flight critical attach-ments and structures.5.2 The reviewing personnel shall sign all post flight reviewdocuments.6. Do

12、cumentation6.1 There shall be a written procedure in effect to properlydocument and store the Production Acceptance Test resultssuch that they are correlated to the specific aircraft for futurereference.6.2 Test FailuresThere shall be a written procedure ineffect to review the causes for any aircraf

13、t failures in theProduction Acceptance Tests phases. Aircraft may only bereleased for retest after manufacturing review of the discrepantarticles and written release for retest.7. Keywords7.1 light sport aircraft; special airworthiness certificate;weight-shift-control1This practice is under the juri

14、sdiction of ASTM Committee F37 on Light SportAircraft and is the direct responsibility of Subcommittee F37.40 on Weight Shift.Current edition approved July 1, 2009. Published September 2009. Originallyapproved in 2005. Last previous edition approved in 2007 as F 2447 05 (2007).1Copyright ASTM Intern

15、ational, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determinati

16、on of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdr

17、awn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your

18、comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).F 2447 05 (2009)2

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1