DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf

上传人:吴艺期 文档编号:690807 上传时间:2018-12-30 格式:PDF 页数:11 大小:495.60KB
下载 相关 举报
DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf_第1页
第1页 / 共11页
DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf_第2页
第2页 / 共11页
DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf_第3页
第3页 / 共11页
DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf_第4页
第4页 / 共11页
DLA MIL-DTL-44427 A-2000 TENT SOLDIER CREW《士兵用帐篷》.pdf_第5页
第5页 / 共11页
点击查看更多>>
资源描述

1、9999906 2116431 835 9 I I INCH-POUND I MIL-DTL-44427A 28 February, 2000 SUPERSEDING 29 July, 1991 . MIET-44427 DETAILED SPECIFICATION TENT, SOLDIER CREW This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers

2、two types of a frame supported soldier crew tent equipped with a frame, tent, pins, liner, fly and a gear net. 1.2 Classification. (see 6.2) Type I Type II - Tent assembly with reversible (Camouflage Green 483/Tan) fly - Tentassembly with reversible (Camouflage Green 483White) fly 2. APPLICABLE DOCU

3、MENTS *2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure

4、 the completeness of this list, document users are cautioned that they must meet all specified requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. Beneficial comments (recommendations, additions, deletions, clarifications) and any pertinent data wh

5、ich may be of use in improving this document should be addressed to: Defense Supply Center Philadelphia, Clothing and Textiles Directorate, Attn: DSCP-CNR, 700 Robbins Ave., Philadelphia, PA 191 11-5096 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of

6、 this document or by letter. AMSC N/A FSC 8340 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* MIL-DTL-44427A 2.2 Government dacuments. 2.2,l S.pec5cations. standards, and handbooks. The following specifications, standards, and handbooksfom a part

7、of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MI LI TARY

8、MIL-F-44425 - Frame Section, Tent, Soldier Crew (Unless otherwise indicated. copies of federal and military specifications, standards, and handbooks are available from the Document Automation and Production Service, Bldg. 4D (DPM-DODSSP), 700 Robbins Avenue, Philadelphia, PA 191 1 1-5094.) Governmen

9、t documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. *2.2.2 Other Government documents, drawings. and uublications. The following other DRAWINGS U.S. ARMY SOLDIER BIOLOGICAL CH

10、EMICAL COMMAND, NATICK SOLDIER CENTER 5-4-758 1 5-4-7676 5-4-7678 - Soldier Crew Tent Assembly - Instruction Label, Soldier Crew Tent - FSCT Pegs, Bag any break Free ends not finished as specified Hardware Broken Malformed: - fails to perform intended function - but will perform intended function Co

11、rroded area Burr or sharp edge that may cause injury in handling or damage to fabric Not specified type or size Any required component improperly installed causing failure to serve intended purpose Components Any operation omitted or not performed in & assembly accordance with specification or drawi

12、ng unless classified herein Raw material Any wrong material used Stitching margin (including tolerance): Larger or smaller than specified - for more than 2 inches but not more than 4 inches in length - for more than 4 inches in length - % inch or less - more than !4 inch - on cover Seams & Open seam

13、s: stitching Burn through Seam & stitch Note: A seam shall be classified as open when one or more stitches joining a seam are broken, or when one or more skipped or run-off stitches occur. On double stitched seams, a seam shall be classified as open when either one or both sides of a seam are open.

14、Not specified seam or stitch type Seam twisted, pleated or badly puckered Any line of stitching not beginning or ending (unless otherwise classified herein) where specified (unless otherwise classified herein) 204 307 118 119 120 121 122 123 205 308 206 124 125 309 207 310 31 1 126 312 313 7 Provide

15、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-44427A TABLE II. End item visual defects (continued) Classification Ma-ior Minor A B Examine Defect Any seam not lapped or finished as specified 3 14 Raw edge (on edge required to be finished) More tha

16、n /2 inch in length when securely caught in stitching Thread breaks, skipped stitches or runoffs Boxstitching Bartackhg Stitch tension Stitches per inch Mends, darns or patches Note: Raw edge not securely caught in stitching shall be classified as an open seam On stitching other than box-x stitching

17、 overstitched less than 1 inch in each direction beyond defective stitching area for 301 and 401 type stitching On box-x, overstitched less than /i inch in each direction beyond the defective stitching area NOTE: Thread breaks or two or more consecutive skipped or runoff stitches not overstitched sh

18、all be classified as an open seam Incomplete: - one row of stitching omitted - two or more rows of stitching omitted Less than specified length by more than 1/8 inch One or more bartacks omitted Any bartack not as specified or not in Loose stitching incomplete or broken Less than specified length by

19、 more than 1/8 inch Width less than 1/8 inch specified location Tension loose, resulting in loose bobbin or top Tension tight, resulting in puckering of material Less than minimum specified (except on thread panel joining seams) - one stitch - two or more stitches Repairs not in accordance with Depa

20、rtment of The Army Field Manual FM 1 O- 16 or not authorized by the contracting officer 315 316 317 208 209 318 127 319 320 32 I 210 322 323 3 24 21 1 128 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-44427A TABLE II. End item visual defe

21、cts (continued) Classification Examine Defect Maior Minor General Marking & labels A B Any other construction detail not performed Omitted, incorrect, illegible, or misplaced: as specified 129 - erection or maintenance instructions - identification 325 Cleanness Grease or oil stains 326 327 212 Thre

22、ad ends not trimmed to /z inch or less Thread ends not trimmed to !4 inch or less in slide fastener area 213 (except in slide fastener area) 4.4.4 End item dimensional examination. The end item shall be examined for the defects listed in Table II. Only those dimensions that can be evaluated without

23、damaging or disassembling the end items shall be examined. The lot size shall be expressed in units of tents. covers or fiame carrying covers, as applicable. The sample unit shall be one end section. intermediate section, tent cover or frame carrying cover, as applicable. The inspection level shall

24、be S-3. TABLE III. End item dimensional defects Classification Examine Defect Maior Minor Overall dimensions of (including applicable tolerances) tent, fly and liner Larger or smaller than specified 101 Dimensions. other than (including applicable tolerances) overall on tent - affecting serviceabili

25、ty 102 fly & liner - not affecting Serviceability 20 1 Larger or smaller than specified 4.4.5 End item performance testing. Tents shall be tested as specified in 4.5.1 and 4.5.2 for compliance with the requirements of 3.3.3, 3.3.3.1 and 3.7. The lot size shall be expressed in units of tent bodies. T

26、he sample unit shall be one completely fabricated tent body. The inspection level shall be S-3. The lot shall be rejected if one or more sample units fail to meet the requirement. *4.4.6 Packaging examination. The fully packaged end items shall be examined for marking, materials, workmanship and con

27、tent defects. 4.5 Methods of insPection. 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-9999b 2LLb440 845 MIL-DTL-44427A 4.5.1 Wicking of sewing thread (CUD test). The tent body assembly and any components utilizing transparent seam tape, shall be

28、 tested on any two areas as follows: any two seams on the tent assembly and any two seams on the components utilizing seam tape 4.5.1.1 Procedure. Suspend the seamed section of the test fabric in the center of a 6 2 1/8 inch diameter hoop and form a depression with the seamed fabric in the hoop to a

29、 depth of 1 - + YI inch. Slowly pour 500 ml of water at 77“ t 4F into the cupped area (depression) and observe the under surface of the fabric for water penetration. Any wicking of water along the sewing thread, identified by a discoloration or darkening of the thread within 5 minutes after water is

30、 poured shall constitute a test failure. Water leakage through the needle holes or between the plies of the lapped seam fabric shall not be considered a failure. tested as follows: *4.5.2 Erectionlstrikhg of tent test. The complete tent assembly shall be erectedktruck a. The tent shall be unpacked a

31、nd completely erected in accordance with Drawing No. 5-4-7676. All doors, pockets, zippers and straps shall be operated to ensure performance. b. After erection Set-up is completed, the tent shall be completely struck (taken down) and packed. The inability to erectktrike tent shall be considered a t

32、est failure. 5. PACKAGING *5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD personnel, these personnel need to contact the responsible packaging activity to ascert

33、ain requisite packaging requirements. Packaging requirements are maintained by the Inventory Control Points packaging activity within the Military Department or Defense Agency, or within the Military Departments System Command. Packaging data retrieval is available fi-om the managing Military Depart

34、ments or Defense Agencys automated packaging files, CD-ROM products, or by contacting the responsible packaging activity. 6. NOTES *(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.) 6.1 Intended use. The tent is intended for use by up t

35、o five soldiers with gear in all climactic conditions. *6.2 Acquisition reauirements. Acquisition documents must specifi the following: a. Title, number, and date of this specification. b. Issue of DODISS to be cited in the solicitation, and if required, the specific issue of individual documents re

36、ferenced (see 2.1.1 and 2.2). c. When first article is required (see 3.1,4.3 and 6.4). d. Levels of preservation and packing (see 5.1). 6.3 Sample. For access to standard sample, address the contracting activity issuing the invitation for bids. 10 Provided by IHSNot for ResaleNo reproduction or netw

37、orking permitted without license from IHS-,-,-6.4 First article. When a fist article is required, it will be inspected and approved under the appropriate provisions of FAR 52.209. The fist article should be a preproduction sample. The contracting officer should speci the appropriate type of first ar

38、ticle and the number of units to be fiunished. The contracting officer should include specific instructions in all acquisition instruments regarding arrangements for selection, inspection, and approval of the first article. *6.5 Commercial adhesive. A source of supply for the commercial adhesive spe

39、cified in 3.4.1 is the Minnesota Mining & Mfg. Co., 3M Center, St. Paul, Minnesota 55144. 6.6 Subiect term (key word) listing. Shelter . *6.7 Eaual item. Prior to the use of an “or equal” item, the supplier should submit the item. with supporting data to the contracting officer for subsequent approv

40、al or disapproval by the responsible military agency. *6.8 Changes from Drevious issue. The margins of this document have been marked with an asterisk( *) to indicate where changes (additions, modifications. corrections. deletions) from the previous issue were made. This was done as a convenience on

41、ly and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content. as written. irrespective of the marginal notations and relationship to the last previous issue. , Custodians: Army - GL Preparing activity DLA-CT Project No: 8340-0580 Review activities: Army - MD 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 16230-1-2015 Leisure karts - Part 1 Safety requirements and test methods for karts German version EN 16230-1 2013+A1 2014《休闲卡丁车 第1部分 卡丁车的安全性要求和试验方法 德文版本EN 16230-1-2013+A1-20.pdf DIN EN 16230-1-2015 Leisure karts - Part 1 Safety requirements and test methods for karts German version EN 16230-1 2013+A1 2014《休闲卡丁车 第1部分 卡丁车的安全性要求和试验方法 德文版本EN 16230-1-2013+A1-20.pdf
  • DIN EN 16230-2-2017 Leisure karts - Part 2 Safety requirements for karting facilities German version EN 16230-2 2016《休闲卡丁车 第2部分 卡丁车设施的安全要求 德文版本EN 16230-2-2016》.pdf DIN EN 16230-2-2017 Leisure karts - Part 2 Safety requirements for karting facilities German version EN 16230-2 2016《休闲卡丁车 第2部分 卡丁车设施的安全要求 德文版本EN 16230-2-2016》.pdf
  • DIN EN 16231-2012 Energy efficiency benchmarking methodology German version EN 16231 2012《能效标杆馆里方法体系 德文版本EN 16231-2012》.pdf DIN EN 16231-2012 Energy efficiency benchmarking methodology German version EN 16231 2012《能效标杆馆里方法体系 德文版本EN 16231-2012》.pdf
  • DIN EN 16232-2013 Child use and care articles - Infant swings German version EN 16232 2013《儿童使用和保育用品 婴儿秋千 德文版本EN 16232-2013》.pdf DIN EN 16232-2013 Child use and care articles - Infant swings German version EN 16232 2013《儿童使用和保育用品 婴儿秋千 德文版本EN 16232-2013》.pdf
  • DIN EN 16234-1-2016 e-Competence Framework (e-CF) - A common European Framework for ICT Professionals in all industry sectors - Part 1 Framework German version EN 16234-1 2016《电子能力.pdf DIN EN 16234-1-2016 e-Competence Framework (e-CF) - A common European Framework for ICT Professionals in all industry sectors - Part 1 Framework German version EN 16234-1 2016《电子能力.pdf
  • DIN EN 16235-2013 en 2503 Railway application - Testing for the acceptance of running characteristics of railway vehicles - Freight wagons - Conditions for dispensation of freight .pdf DIN EN 16235-2013 en 2503 Railway application - Testing for the acceptance of running characteristics of railway vehicles - Freight wagons - Conditions for dispensation of freight .pdf
  • DIN EN 16237-2013 Classification of non-electrical sources of incoherent optical radiation German version EN 16237 2013《非相干光学辐射的非电源分类 德文版本EN 16237-2013》.pdf DIN EN 16237-2013 Classification of non-electrical sources of incoherent optical radiation German version EN 16237 2013《非相干光学辐射的非电源分类 德文版本EN 16237-2013》.pdf
  • DIN EN 16240-2014 Light transmitting flat solid polycarbonate (PC) sheets for internal and external use in roofs walls and ceilings - Requirements and test methods German version E.pdf DIN EN 16240-2014 Light transmitting flat solid polycarbonate (PC) sheets for internal and external use in roofs walls and ceilings - Requirements and test methods German version E.pdf
  • DIN EN 16241-2017 Railway applications - Slack adjuster German version EN 16241 2014+A1 2016《轨道交通 松紧调整器 德文版本EN 16241-2014+A1-2016》.pdf DIN EN 16241-2017 Railway applications - Slack adjuster German version EN 16241 2014+A1 2016《轨道交通 松紧调整器 德文版本EN 16241-2014+A1-2016》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1