DLA MIL-DTL-5423 13 D-2009 BOOT DUST AND WATER SEAL TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS) STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME).pdf

上传人:roleaisle130 文档编号:690950 上传时间:2018-12-30 格式:PDF 页数:4 大小:39.40KB
下载 相关 举报
DLA MIL-DTL-5423 13 D-2009 BOOT DUST AND WATER SEAL TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS) STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME).pdf_第1页
第1页 / 共4页
DLA MIL-DTL-5423 13 D-2009 BOOT DUST AND WATER SEAL TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS) STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME).pdf_第2页
第2页 / 共4页
DLA MIL-DTL-5423 13 D-2009 BOOT DUST AND WATER SEAL TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS) STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME).pdf_第3页
第3页 / 共4页
DLA MIL-DTL-5423 13 D-2009 BOOT DUST AND WATER SEAL TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS) STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME).pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INCH-POUND MIL-DTL-5423/13D 17 February 2009 SUPERSEDING MIL-DTL-5423/13C 4 February 2008 DETAIL SPECIFICATION SHEET BOOT, DUST AND WATER SEAL, TYPE D (FOR LEVER OPERATED CIRCUIT BREAKERS), STYLE 1 (PANEL MOUNTED WITHOUT MOUNTING FRAME) This specification sheet is approved for use by all Departments

2、 and Agencies of the Department of Defense. The requirements for acquiring the product described herein shall consist of this specification sheet and MIL-DTL-5423. FIGURE 1. Dimensions and configuration boots type D, style 1. AMSC N/A FSC 5930 Provided by IHSNot for ResaleNo reproduction or networki

3、ng permitted without license from IHS-,-,-MIL-DTL-5423/13D 2 (For number of screws and location see table II.) “0“- RING-SILICONEInches mm 0.016 0.5 0.906 1.000 1.812 2.500 .41 1.27 23.01 25.40 46.02 63.50 NOTES: 1. Dimensions are in inches. 2. Metric equivalents are given for general information on

4、ly. 3. Unless otherwise specified, tolerances are .02 (.51mm) for two place decimals and .031 (.79 mm) for three place decimals. 4. The number of mounting screws shall be supplied as indicated. 5. Edges shall be smooth and free from burrs. FIGURE 1. Dimensions and configuration boots type D, style 1

5、 - Continued. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-5423/13D 3 REQUIREMENTS Dimensions and configuration: See figure 1. Silicon rubber: Grade 50, class III, transparent. Splashproof: In accordance with MIL-STD-108, table I. Enduranc

6、e: 10,000 operations. Minute cracks after life test, which do not permit leakage, shall not be cause for rejection. Part or Identifying Number (PIN): See tables I and II. Table I. Dimensions. Dimensions .031 (.79) PIN M5423/13- L1 W1 W2 L2 01 1.250 (31.75) .750 (19.05) .531 (13.49) .60 (15.24) 02 1.

7、312 (33.32) 1.500 (38.10) 1.250 (31.75) .60 (15.24) 03 1.281 (32.54) 2.250 (57.15) 2.000 (50.80) .60 (15.24) Table II. Mounting holes, markings, and panel cutout. Mounting holes Location Panel cutout PIN M5423/13- Number of screws B B1 Markings X Y 01 2 Yes None None 1.250 (31.75) .531 (13.49) 02 4

8、None .375 (9.53) On-off 1.312 (33.32) 1.250 (31.75) 03 6 Yes .750 (19.05) None 1.281 (32.54) 2.000 (50.80) Qualification: First Article Testing in accordance with MIL-DTL-5423. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-5423/13D 4 The ma

9、rgins of this specification are marked with vertical lines to indicate where modifications were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of

10、this document based on the entire content irrespective of the marginal notations. Referenced documents: MIL-DTL-5423 MIL-STD-108 ASTM-A493 Custodians: Preparing activity: Army - CR DLA - CC Navy - AS Air Force - 85 (Project 5930-2008-069) DLA - CC Review activities: Army - AT, AV, CR4, MI Navy - CG,

11、 EC, MC Air Force 99 NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API TR 934-D-2010 Technical Report on the Materials and Fabrication Issues of 11 4Cr-1 2Mo and 1Cr-1 2Mo Steel Pressure Vessels (First Edition)《关于11 4Cr-1 2Mo和1 cr-1 2mo钢制压力容器材料和制造.pdf API TR 934-D-2010 Technical Report on the Materials and Fabrication Issues of 11 4Cr-1 2Mo and 1Cr-1 2Mo Steel Pressure Vessels (First Edition)《关于11 4Cr-1 2Mo和1 cr-1 2mo钢制压力容器材料和制造.pdf
  • API TR 934-D-2010 Technical Report on the Materials and Fabrication Issues of 11 4Cr-1 2Mo and 1Cr-1 2Mo Steel Pressure Vessels (First Edition)《关于11 4Cr-1 2Mo和1 cr-1 2mo钢制压力容器材料和制造_1.pdf API TR 934-D-2010 Technical Report on the Materials and Fabrication Issues of 11 4Cr-1 2Mo and 1Cr-1 2Mo Steel Pressure Vessels (First Edition)《关于11 4Cr-1 2Mo和1 cr-1 2mo钢制压力容器材料和制造_1.pdf
  • API TR 934-F PART 1-2017 Impact of Hydrogen Embrittlement on Minimum Pressurization Temperature for Thick-wall Cr-Mo Steel Reactors in High-pressure H2 Service-Initial Technical Ba.pdf API TR 934-F PART 1-2017 Impact of Hydrogen Embrittlement on Minimum Pressurization Temperature for Thick-wall Cr-Mo Steel Reactors in High-pressure H2 Service-Initial Technical Ba.pdf
  • API TR 934-F PART 1-2017 Impact of Hydrogen Embrittlement on Minimum Pressurization Temperature for Thick-wall Cr-Mo Steel Reactors in High-pressure H2 Service-Initial Technical Ba_1.pdf API TR 934-F PART 1-2017 Impact of Hydrogen Embrittlement on Minimum Pressurization Temperature for Thick-wall Cr-Mo Steel Reactors in High-pressure H2 Service-Initial Technical Ba_1.pdf
  • API TR 934-F PART 2-2017 Literature Review of Fracture Mechanics Cbased Experimental Data for Internal Hydrogen-assisted Cracking of Vanadium-modified 2 Cr-1Mo Steel (First Edition.pdf API TR 934-F PART 2-2017 Literature Review of Fracture Mechanics Cbased Experimental Data for Internal Hydrogen-assisted Cracking of Vanadium-modified 2 Cr-1Mo Steel (First Edition.pdf
  • API TR 934-F PART 3-2017 Subcritical Cracking of Modern 2 Cr-1Mo- V Steel Due to Dissolved Internal Hydrogen and H2 Environment Research Report (FIRST EDITION).pdf API TR 934-F PART 3-2017 Subcritical Cracking of Modern 2 Cr-1Mo- V Steel Due to Dissolved Internal Hydrogen and H2 Environment Research Report (FIRST EDITION).pdf
  • API TR 934-G-2016 Design Fabrication Operational Effects Inspection Assessment and Repair of Coke Drums and Peripheral Components in Delayed Coking Units (FIRST EDITION).pdf API TR 934-G-2016 Design Fabrication Operational Effects Inspection Assessment and Repair of Coke Drums and Peripheral Components in Delayed Coking Units (FIRST EDITION).pdf
  • API TR 938-B-2008 Use of 9Cr-1Mo-V (Grade 91) Steel in the Oil Refining Industry (First Edition)《炼油工业中使用9Cr-1Mo-V(91级)钢.第1版》.pdf API TR 938-B-2008 Use of 9Cr-1Mo-V (Grade 91) Steel in the Oil Refining Industry (First Edition)《炼油工业中使用9Cr-1Mo-V(91级)钢.第1版》.pdf
  • API TR 938-C-2015 Use of Duplex Stainless Steels in the Oil Refining Industry (THIRD EDITION).pdf API TR 938-C-2015 Use of Duplex Stainless Steels in the Oil Refining Industry (THIRD EDITION).pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1