DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf

上传人:赵齐羽 文档编号:691931 上传时间:2018-12-30 格式:PDF 页数:5 大小:38.01KB
下载 相关 举报
DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf_第1页
第1页 / 共5页
DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf_第2页
第2页 / 共5页
DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf_第3页
第3页 / 共5页
DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf_第4页
第4页 / 共5页
DLA MIL-PRF-1 115 M-2009 ELECTRON TUBE THYRATRON TYPE 5C22.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、AMSC N/A FSC 5960 INCH POUND MIL-PRF-1/115M 26 May 2009 SUPERSEDING MIL-PRF1/115L 14 January 2004 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, THYRATRON TYPE 5C22 This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. The requirements for acquiring t

2、he electron tube described herein shall consist of this specification sheet and MIL-PRF-1. DESCRIPTION: Triode, hydrogen See figure 1 Mounting position: Any Weight: 12-ounces nominal ABSOLUTE RATINGS: Parameter: Ef epy epx Ebb Ecc egx egy ib Ib Unit: V kv kv V dc V dc v v a mA dc Maximum: 6.8 16.0 1

3、6.0 - - - - - - 200 - - - 325 200 Minimum: 5.8 - - - (see note 1) 5% epy (see note 2) 4,500 - - - - - - (see note 3) - - - - - - Test Conditions: - - - 16.0 - - - - - - 0 - - - 150 - - - - - - ABSOLUTE RATINGS: Parameter: tk dik/dt Pb TA prr Unit: sec a/s - - - C - - - Maximum: - - - 1,500 3.2 x 109

4、90 - - - Minimum: 300 - - - - - - -50 - - - Test Conditions: - - - - - - - - - - - - 1,000 GENERAL: Qualification Not Required Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/115M 2Table 1. Testing and Inspection. Inspection Method MIL-STD-

5、1311 Conditions Acceptance Level 13/ Symbol Limits Min Limits Max Units Conformance inspection, part 1 Heater current Instantaneous starting Operation (1) DC anode voltage for conduction Pulse emission 3241 3267 3246 3247 3251 Ef = 6.3 V ac Ef = 6.8 V ac; epy = 13.5 kv (min); tk = 300 See notes 6 an

6、d 8 Ef = 5.8 V ac; epy = 18.0 kv (min); prr = 800; t= 300 See notes 6 and 7 See note 6 Ef = 6.3 V ac; ik = 325 a (min); prr = 60 10 % tp = 5 s 10 % starting time of current pulse = 2.5 s (max); specified time interval = 4.0 s tr = 0.5 s (max) 0.65 0.65 0.65 0.65 0.65 If - - - egy Ebb egk 9.6 - - - -

7、 - - - - - - - - 11.6 - - - 150 2,500 175 Aac - - - v V dc v Conformance inspection, part 2 Dimensions High frequency vibration Operation (1A) Anode delay time Anode delay time drift Time jitter Appendix D, 30(b) 1031 3246 3256 3256 3261 See figure 1 No voltages applied Operation (1); Ef = 6.8 V ac

8、Operation (1); t = 120; egy = 150 v Anode delay time See note 9 Ef = 6.3 V ac; epy = 5.0 kv (max) See note 6 - - - - - - - - - - - - - - - - - - - - - - - - egy tad tad tj - - - - - - - - - - - - - - - - - - - - - - - - 150 0.65 0.10 0.005 - - - - - - V s s s See notes at end of Table I. Provided by

9、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/115M 3Table 1. Testing and Inspection -Continued. Inspection Method MIL-STD-1311 Conditions Symbol Limits Min Limits Max Unit Conformance inspection, part 3 Life-test Life-test end points: Operation (1)

10、and (1A) DC anode voltage for conduction Time jitter Anode delay time Anode delay time drift Dimensions Variable-frequency vibration Operation (2) Shock Shock end points: Operation (1) DC anode voltage for conduction Time jitter - - - 3246 3247 3261 3256 3256 Appendix D, 30(b) 1031 3246 1041 - - - 3

11、246 3247 3261 Group C; Ef = 6.3 V ac; t = 500 hrs; 96 hrs “on” and 1hr “off”; tube mounted in horizontal position See note 6 See note 10 egy = 160 v egy = 160 v egy = 160 v egy = 160 v See figure 1 and note 11 No voltages applied See notes 4 and 11 TA = 90C; t = 5.0 hours; Ef = 6.3 0.5 V ac; See not

12、es 6, 7 and 11 Angle = 13 See notes 5 and 11 - - - egy Ebb tj tad tad - - - - - - egy - - - egy Ebb tj - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 160 4,000 0.01 0.7 0.1 - - - - - - 150 - - - 150 2,500 0.005 - - - v V dc s s s - - - - - - v - - - v V dc s See

13、notes at end of Table I. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/115M 4NOTES: 1. For instantaneous starting applications where anode voltage is applied instantaneously the maximum permissible epy is 13.5 kv and shall not be attained

14、 in less than 0.04 second. 2. In pulsed operation, the peak inverse voltage, exclusive of a spike of 0.05 s maximum duration, shall not exceed 5.0 kv during the first 25 s after the pulse. 3. Driver pulse measured at tube socket with thyratron grid disconnected shall be egy = 200 v minimum; time of

15、rise = 0.5 s maximum; grid pulse duration = 2 s minimum; impedance of driver circuit = 500 ohms maximum. 4. There shall be no pronounced resonance in the specified frequency range. 5. Use clamp as specified on Drawing 243-JAN. 6. The anode circuit constants shall be chosen so that at epy = 16.0 unde

16、r resonant charging conditions: dik/dt = 1,500 a/s minimum; ib = 175 a; tp = 1.0 s 10 percent; prr = 1,000. The grid pulse characteristic shall be tp = 2.0 s maximum; tr = 0.5 s minimum. Internal impedance of driver = 500 ohms minimum. 7. The tube shall operate continuously without evidence of arc-b

17、ack. 8. Push-button starting shall be attempted up to three times, with intervals of from 10 to 30 seconds between successive attempts. Any tube failing to operate satisfactorily when the anode voltage (epy) applied rises from 0 to 13.5 kv within 0.03 second (the filter in the rectifier shall be des

18、igned so that the epy reaches at least 7 kv within 0.015 second) will be considered a failure. 9. During the interval between 2 minutes and 7 minutes of the anode delay time test, the change in anode delay time (tad) relative to the tad value observed on the anode delay time test shall not exceed th

19、e specified value. 10. Anode heating shall not be cause for rejection on operation (1) and operation (1A) performed during life-test end point test. 11. This test shall be performed during the initial production and once each succeeding 12-calendar months in which there is production. A regular doub

20、le sampling plan shall be used, with the first sample of three tubes with an acceptance number of zero, and a second sample of three tubes with a combined acceptance number of one. In the event of failure, the test will be made as a part of conformance inspection, part 2, code level D, with an accep

21、tance level of 6.5. The regular “12-calendar month” double sampling plan shall be reinstated after three consecutive samples have been accepted. 12. Reclaimed materials shall be utilized to the maximum extent possible. 13. This specification sheet uses accept on zero defect sampling in accordance wi

22、th MIL-PRF-1, table III. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/115M 5Pin No. Element 1 2 3 4 CAP g h, k h k a Dimensions in inches with metric equivalents (mm) in parentheses (see note 1) Ltr Minimum Maximum Conformance inspection

23、, part 2 A 8.250 (209.55) 8.750 (222.25) B 2.313 (58.75) 2.563 (65.10) C 7.531 (191.29) 8.031 (203.99) Conformance inspection, part 3 (See note 4) D 0.994 (25.25) 1.170 (29.72) E 0.559 (14.20) 0.573 (14.55) F 0.609 (15.47) 0.641 (16.28) G 0.375 ( 9.53) H 4.250 (107.95) J BASE : A4 - 18 NOTES: 1. Met

24、ric equivalents (to the nearest 0.01 mm) are given for general information only and are based upon 1 inch = 25.4 mm. 2. Alternate seal configuration. 3. Clamping shall be confined to the base and the area designated by dimension H. 4. See Note 11, Table I. FIGURE 1. Outline drawing of electron tube

25、type 5C22 Referenced documents. In addition to MIL-PRF-1, this document references the following: MIL-STD-1311 JETEC DWG 243-JAN The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and the G

26、overnment assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Custodians: Preparing

27、 activity: Army - CR DLA - CC Navy - EC Air Force - 85 (Project No. 5960-2009-001) DLA - CC Review activities: Army - AR, CR4 Navy - AS, CG, MC, OS, SH Air Force - 99 NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1