1、MILITARY SPECIFICATIONTOOL KITS, ELECTRICAL CONNECTORS, CONTACTS, ANDCONNECTOR AND CABLE ACCESSORIES:GENERAL SPECIFICATION FORThis amendment forms a part of MIL-T-83507, dated 18 March 1977, and isapproved for use by all Departments and Agencies of the Department of Defense.PAGE 23.3.1 Cases , line
2、2, delete “categories” and substitute “categories”.3.3.1.1: Delete “ Catagory 1 ” and substitute “ Category 1 ”. Make this change wherever “ Catagory”appears in this specification.PAGE 33.8 Shock (specified pulse) (when specified see 3.1) . Delete and substitute:“3.8 Shock (when specified see 3.1) .
3、 When the tool kit with contents is tested as specified in 4.7.5,there shall be no damage to either the case or the tools.”3.9.2 Content charts and instruction sheets . At the end of the paragraph add “(see 3.1).”PAGE 54.5.4 Retention of Qualification . Delete and substitute:“4.5.4 Retention of qual
4、ification . To retain qualification, the contractor shall forward a report at 24-month intervals to the qualifying activity. The qualifying activity shall establish the initial reporting date.The report shall consist of:AMSC N/A 1 of 3 FSC 5180DISTRIBUTION STATEMENT A . Approved for public release;
5、distribution is unlimited.INCH - POUNDMIL-T-83507 AMENDMENT 3 9 November 2000SUPERSEDINGAMENDMENT 2 28 January 2000 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-83507AMENDMENT 32a. A certification shall be submitted certifying that the compa
6、ny still has the capabilities and facilities necessary to produce the item as qualified. If during the reporting periods there has been a process or design change, the manufacturer may be required, at the discretion of the qualifying activity, to submit a representative product to testing in accorda
7、nce with the inspection requirements.Failure to submit the report within 30 days after the end of each 24-month period may result in loss ofqualification for the product. In addition to the periodic submission of inspection data, the contractorshall immediately notify the qualifying activity at any
8、time during the 24-month period that the inspectiondata indicates failure of the qualified product to meet the requirements of this specification.In the event that no production occurred during the reporting period, a report shall be submitted certifyingthat the company still has the capabilities an
9、d facilities necessary to produce the item. If during threeconsecutive reporting periods there has been no production, the manufacturer may be required, at thediscretion of the qualifying activity, to submit a representative product from each group to testing inaccordance with the qualification insp
10、ection requirements.”PAGE 64.6.1.2.3 Disposition of group A sample . Delete and substitute:“4.6.1.2.3 Disposition of group A sample . The tool kit which has passed all the group A inspectionmay be delivered on the contract if the lot is accepted.”4.7.2 Case waterproof (fiberglass only) (when specifi
11、ed, see 3.1) . Delete and substitute:“4.7.2 Case waterproof (fiberglass only) (when specified, see 3.5) .”4.7.5 Shock (specified pulse) (when specified, see 3.1) . Delete and substitute:“4.7.5 Shock (when specified, see 3.8) . The tool kits and contents shall be tested in accordance withmethod 516.2
12、 of MIL-STD-810. The following detail shall apply:a. Test procedure II.”PAGE 7* 6.3 Qualification . Delete and substitute (as shown in amendment 1):* “ 6.3 Qualification . With respect to products requiring qualification, awards will be made only forproducts which are, at the time of award of contra
13、ct, qualified for inclusion in Qualified Products List(QPL) whether or not such products have actually been so listed by that date. The attention of thecontractors is called to these requirements, and manufacturers are urged to arrange to have the productsthat they propose to offer to the Federal Go
14、vernment tested for qualification in order that they may beeligible to be awarded contracts or order for the products covered by this specification.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-83507AMENDMENT 33* 6.3.1 Qualifying activity . T
15、he activity responsible for qualification of these tool kits and the QualifiedProducts List (QPL) is the Defense Supply Center Columbus, Attn: DSCC-VQ, 3990 East Broad Street,Columbus, Ohio 43213-1199.* 6.3.2 Re-qualification . Re-qualification to this amendment is not required. However, the qualify
16、ingactivity or evaluating activity may require representative samples.* 6.3.3 Provisions governing qualification. Copies of specifications and “provisions governingqualification” may be obtained upon application to Commanding Officer, Naval Publication and FormsCenter, 5801 Tabor Avenue, Philadelphi
17、a, PA 19120.”NOTE: The margins of this amendment are marked with asterisks to indicate where changes from theprevious amendment were made. This was done as a convenience only and the Government assumesno liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautio
18、ned toevaluate the requirements of this document based on the entire content irrespective of the marginalnotations and relationship to the last previous amendment.CONCLUDING MATERIALCustodians: Preparing activity:Army - CR DLA - CCNavy - ASAir Force - 11DLA - CC (Project 5180-0164)Review activities:Army - AR, AT, AV, GL, MINavy - EC, MC, SHAir Force - 19, 99Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-