DOT 49 CFR PART 622-2010 ENVIRONMENTAL IMPACT AND RELATED PROCEDURES.pdf

上传人:周芸 文档编号:702222 上传时间:2019-01-01 格式:PDF 页数:1 大小:184.08KB
下载 相关 举报
DOT 49 CFR PART 622-2010 ENVIRONMENTAL IMPACT AND RELATED PROCEDURES.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、458 49 CFR Ch. VI (10110 Edition) Pt. 622 implement 23 U.S.C. 303 for State de-velopment, establishment, and imple-mentation of systems for managing traffic congestion (CMS), public trans-portation facilities and equipment (PTMS), intermodal transportation fa-cilities and systems (IMS), and traffic

2、monitoring for highways and public transportation facilities and equip-ment. PART 622ENVIRONMENTAL IM-PACT AND RELATED PROCE-DURES Subpart AEnvironmental Procedures Sec. 622.101 Cross-reference to procedures. Subpart B Reserved Subpart CRequirements for Energy Assessments 622.301 Buildings. Subpart

3、AEnvironmental Procedures AUTHORITY: 42 U.S.C. 4321 et seq.; 49 U.S.C. 303, 5301(a) and (e), 5323(b), and 5324; 23 U.S.C. 139 and 326; Pub. L. 10959, 119 Stat. 1144, sec-tions 6002 and 6010; 40 CFR parts 15001508; 49 CFR 1.51. 622.101 Cross-reference to proce-dures. The procedures for complying with

4、 the National Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 et seq.), and related statutes, regulations, and orders are set forth in part 771 of title 23 of the Code of Federal Regula-tions. The procedures for complying with 49 U.S.C. 303, commonly known as Section 4(f), are set forth

5、 in part 774 of title 23 of the Code of Federal Regu-lations. 73 FR 13401, Mar. 12, 2008 Subpart B Reserved Subpart CRequirements for Energy Assessments AUTHORITY: Sec. 403(b), Pub. L. 95620; E.O. 12185. 622.301 Buildings. (a) FTA assistance for the construc-tion, reconstruction, or modification of

6、buildings for which applications are submitted to FTA after October 1, 1980, will be approved only after the comple-tion of an energy assessment. An en-ergy assessment shall consist of an analysis of the total energy require-ments of a building, within the scope of the proposed construction activity

7、 and at a level of detail appropriate to that scope, which considers: (1) Overall design of the facility or modification, and alternative designs; (2) Materials and techniques used in construction or rehabilitation; (3) Special or innovative conserva-tion features that may be used; (4) Fuel requirem

8、ents for heating, cooling, and operations essential to the function of the structure, projected over the life of the facility and includ-ing projected costs of this fuel; and (5) Kind of energy to be used, includ-ing: (i) Consideration of opportunities for using fuels other than petroleum and natura

9、l gas, and (ii) Consideration of using alter-native, renewable energy sources. (b) Compliance with the require-ments of paragraph (a) of this section shall be documented as part of the En-vironmental Assessment or Environ-mental Impact Statement for projects which are subject to a requirement for on

10、e. Projects for which there is no en-vironmental assessment or EIS shall document compliance by submission of appropriate material with the applica-tion for FTA assistance for actual con-struction. (c) The cost of undertaking and docu-menting an energy assessment may be eligible for FTA participatio

11、n if the re-quirements of Federal Management Circular 744 (A87) are met. (d) This requirement shall not apply to projects for which the final project application or environmental assess-ment have been submitted to FTA prior to October 1, 1980. 45 FR 58038, Aug. 29, 1980 VerDate Mar2010 10:10 Dec 13, 2010 Jkt 220218 PO 00000 Frm 00468 Fmt 8010 Sfmt 8010 Y:SGML220218.XXX 220218wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1