1、BSI Standards PublicationBS EN 1610:2015Construction and testing ofdrains and sewersBS EN 1610:2015 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 1610:2015. Itsupersedes BS EN 1610:1998 which is withdrawn.The UK participation in its preparation was entrusted t
2、o TechnicalCommittee B/505, Wastewater engineering.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does not purport to include all the necessaryprovisions of a contract. Users are responsible for its correctapplication. The British St
3、andards Institution 2015. Published by BSI StandardsLimited 2015ISBN 978 0 580 91486 7ICS 91.140.80; 93.030Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 30 Septe
4、mber 2015.Amendments issued since publicationDate Text affectedBS EN 1610:2015EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 1610 September 2015 ICS 93.030 Supersedes EN 1610:1997English Version Construction and testing of drains and sewers Mise en oeuvre et essai des branchements et canalisat
5、ions dassainissement Einbau und Prfung von Abwasserleitungen und -kanlen This European Standard was approved by CEN on 24 July 2015. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national sta
6、ndard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in
7、any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Re
8、public, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey andUnited Kingdom. EUROPEA
9、N COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2015 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 1610:2015 EBS EN 16
10、10:2015EN 1610:2015 (E) 2 Contents Page European foreword . 5 1 Scope 6 2 Normative references 6 3 Terms and definitions . 6 4 General 8 4.1 Technical principles . 8 4.2 Safeguarding design decisions . 9 4.3 Short sections of trench 9 5 Construction components and materials 10 5.1 General . 10 5.2 M
11、aterials used for embedment . 10 5.2.1 General . 10 5.2.2 Native soil 10 5.2.3 Imported materials . 10 5.3 Materials used for main backfill . 12 6 Construction of trench 12 6.1 General . 12 6.1.1 Introduction . 12 6.1.2 Working space and soil compaction 12 6.1.3 Transmission of load between trench s
12、upport system and soil . 12 6.1.4 Installing and removing the trench support system . 13 6.2 Trenches 13 6.3 Trench width 13 6.3.1 Maximum trench width 13 6.3.2 Minimum trench width 13 6.3.3 Determination of trench width . 15 6.4 Trench stability . 15 6.5 Trench bottom . 15 6.6 Dewatering . 16 7 Gen
13、eral principles of embedment and support 16 7.1 General . 16 7.2 Bedding construction types 17 7.2.1 Bedding construction type 1 17 7.2.2 Bedding construction type 2 17 7.2.3 Bedding construction type 3 17 7.3 Special methods of bedding or support . 18 8 Installation . 18 8.1 General . 18 8.2 Settin
14、g out . 18 8.3 Delivery, handling and transportation on site 18 8.4 Storage . 18 8.5 Lifting of components . 19 8.6 Laying . 19 8.6.1 General . 19 BS EN 1610:2015EN 1610:2015 (E) 3 8.6.2 Line and level . 19 8.6.3 Jointing . 19 8.6.4 Socket holes 19 8.6.5 Pipe cutting . 20 8.6.6 Provisions for future
15、 connections 20 8.6.7 Other instructions 20 8.7 Special forms of constructions . 20 8.7.1 Pipelines above ground 20 8.7.2 Pipelines within protective pipes . 20 8.7.3 Brick and in situ concrete sewers . 20 8.7.4 Pipelines through, under or close to structures 20 8.8 Supporting and anchoring . 20 8.9
16、 Manholes and inspection chambers 21 9 Connection to pipes and manholes 21 9.1 General . 21 9.2 Connection by junctions . 21 9.3 Connection by connecting fittings 21 9.4 Connection by saddle fittings . 22 9.5 Connection by welding 22 9.6 Connection to manholes and inspection chambers 22 10 Testing d
17、uring construction . 22 11 Backfilling 22 11.1 General . 22 11.2 Compaction . 22 11.3 Embedment and initial backfill . 23 11.4 Main backfill . 23 11.5 Removal of trench support system . 23 11.6 Surface reinstatement . 24 12 Final inspection and/or testing of pipelines and manholes after backfilling
18、. 24 12.1 General . 24 12.2 Visual inspection . 24 12.3 Leaktightness . 24 12.4 Embedment and main backfill . 24 12.4.1 General . 24 12.4.2 Compaction . 24 12.4.3 Pipe deformation 24 13 Procedures and requirements for testing gravity pipelines. 25 13.1 General . 25 13.2 Testing with air (method “L“)
19、 25 13.3 Testing with water (method “W“) . 28 13.3.1 Test pressure 28 13.3.2 Conditioning time . 29 13.3.3 Test requirements 29 13.3.4 Testing time 29 13.4 Testing individual joints 30 14 Testing of pressure pipelines . 30 15 Qualifications . 30 Annex A (informative) Dewatering . 31 A.1 General . 31
20、 BS EN 1610:2015EN 1610:2015 (E) 4 A.2 Sump pumping from trench bottom 31 A.3 Deep wells . 31 A.4 Vertical well points 32 A.5 Horizontal pipe dewatering . 32 A.6 Eductor well pointing . 32 Annex B (informative) Abstract from DIRECTIVE 2014/25/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 Fe
21、bruary 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (Text with EEA relevance) . 33 Annex C (informative) Manufacturers Instructions 34 Annex D (informative) Additional national public documents 35 D.1 France
22、. 35 D.2 Germany 35 D.3 The Netherlands . 35 D.4 Austria 35 D.5 Switzerland: . 36 D.6 Sweden . 36 D.7 UK . 36 Bibliography . 38 BS EN 1610:2015EN 1610:2015 (E) 5 European foreword This document (EN 1610:2015) has been prepared by Technical Committee CEN/TC 165 “Wastewater engineering”, the secretari
23、at of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by March 2016, and conflicting national standards shall be withdrawn at the latest by March 2016. Attention is drawn to the
24、 possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 1610:1997. The main changes with respect to the previous edition are listed below:
25、updating of references and their associated requirements; addition of requirements for the soil-pipe-system. According to the CEN-CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, C
26、roatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey an
27、d the United Kingdom. BS EN 1610:2015EN 1610:2015 (E) 6 1 Scope This European Standard is applicable to the construction and related testing of drains and sewers usually buried in the ground and usually operating under gravity but up to 0,5 kPa when surcharged. The construction of pipelines operatin
28、g under pressure is covered by this European Standard together with EN 805 as appropriate (e.g. for testing). This European Standard is applicable to drains and sewers installed in trenches, under embankments or above ground. For trenchless construction EN 12889 applies. Additionally, other local or
29、 national regulations may apply, e.g. concerning health and safety, pavement reinstatement and requirements for tightness testing. NOTE Further information is given by reference to national documents listed in Annex D. 2 Normative references The following documents, in whole or in part, are normativ
30、ely referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 476:2011, General requirements for components used in drains a
31、nd sewers EN 752, Drain and sewer systems outside buildings EN 805, Water supply Requirements for systems and components outside buildings EN 1295-1, Structural design of buried pipelines under various conditions of loading Part 1: General requirements 3 Terms and definitions For the purposes of thi
32、s document, the following terms and definitions apply. The same definitions apply for trenches with vertical or sloping sides and for pipes laid below embankments. Some of these terms are illustrated in Figure 1. 3.1 bedding part of the construction which supports the pipe between the trench bottom
33、and the sidefill or initial backfill Note 1 to entry: The bedding consists of upper and lower bedding. In the case of the pipe laid on natural trench bottom, the trench bottom is the lower bedding. 3.2 compaction layer thickness thickness of each new layer of fill material prior to its compaction 3.
34、3 depth of cover vertical distance from the top of the pipe barrel to the surface 3.4 embedment fill around the pipe including bedding, sidefill and initial backfill BS EN 1610:2015EN 1610:2015 (E) 7 3.5 initial backfill layer of fill material immediately above the crown of the pipe 3.6 main backfil
35、l fill between the top of the embedment and the level of the ground, top of embankment or, when applicable, the bottom of the road or railway construction 3.7 minimum trench width minimum distance needed for safety and construction between the trench walls at the top of the lower bedding or when app
36、licable between the trench support systems at any level 3.8 native soil soil from the excavation of the trench 3.9 nominal size DN numerical designation of size of component, which is a convenient integer approximately equal to a manufacturing dimension in mm Note 1 to entry: This may apply to eithe
37、r the internal diameter (DN/ID) or the external diameter (DN/OD). Source: EN 476:2011 3.10 pipeline assembly of pipes, fittings and joints between manholes or other structures SOURCE: EN 16323:2014, definition 2.2.3.6, modified 3.11 prefabricated component product manufactured separately from the in
38、stallation process, generally in circumstances where a product standard applies and/or a manufacturers quality control is in place 3.12 sidefill material between bedding and initial backfill 3.13 trench depth vertical distance from the bottom of the trench to the surface 3.14 minimum working space x
39、/2 horizontal distance from the pipe outside wall to the side wall of the trench, or when applicable, between the trench support systems on the top of the lower bedding Note 1 to entry: See Figure 2. BS EN 1610:2015EN 1610:2015 (E) 8 3.15 trench support system construction to stabilize trench and to
40、 protect people in the trench Key 1 surface 9 trench bottom 2 bottom of road or railway construction, if any 10 depth of cover (3.3) 3 trench walls 11 depth of bedding (3.1) 4 main backfill (3.6) 12 depth of embedment (3.4) 5 initial backfill (3.5) 13 trench depth (3.13) 6 sidefill (3.12) a thicknes
41、s of lower bedding 7 upper bedding, b b thickness of upper bedding 8 lower bedding, a c thickness of initial backfill ODvis the vertical outside diameter NOTE 1 For minimum values of a and c see Clause 7. NOTE 2 The bedding angle is not the bedding reaction angle used in structural design. Figure 1
42、Illustration of definitions 4 General 4.1 Technical principles Pipelines and manholes are engineering structures in which the combined performance of construction components, embedment, initial and main backfill and native soil constitute the basis for stability and safety in operation. The pipes, f
43、ittings and joint materials supplied, together with the work carried out at site, such as the pipe bedding, the jointing of pipes, the sidefilling and backfilling are all important factors in achieving a structure with adequate performance over the intended service life. BS EN 1610:2015EN 1610:2015
44、(E) 9 The network owner and the planner shall coordinate the extent and the requirements of the engineering services to be rendered for the individual case. The pipeline shall be designed during planning in accordance with EN 1295-1 and EN 752 as applicable to ensure it is capable of carrying all fo
45、reseeable imposed and operational loads (including construction loads, that may be determinant for dimensioning) with a sufficient level of safety. A procedure shall be established for the resolution of technical questions, agreement and recording of changes to design decisions made during construct
46、ion. 4.2 Safeguarding design decisions In the execution of the work it shall be ensured that the decisions made in the design are complied with or adapted to changed conditions. The design decisions may be affected by variation of any of the following which should be checked during installation: tre
47、nch width (see 6.3); trench depth; trench support system and the effect of its removal (see 11.5); degree of compaction of the embedment; degree of compaction of main backfill; pipe support and trench bottom conditions; construction traffic and assumptions concerning temporary loads; soil types (e.g
48、. subsoil, trench walls, initial and main backfill); shape of trench (e.g. stepped trench, trench with sloping walls); ground and soil condition (e.g. affected by frost and thaw, rain, snow, flooding); ground water table; additional pipelines in the same trench; existing infrastructure (e.g. pipes,
49、cables, structures); pipe type, strength or class. NOTE The above list is not exhaustive. 4.3 Short sections of trench Particular attention should be paid to: foundation conditions, construction steps and transition; shear load bearing capacity of the joints and bedding, e.g. meeting the hardening times in the case of concrete bedding; responding to soil changes in the trench bottom; BS EN 1610:2015EN 1610:2015 (E) 10 securing of the initial and main backfill from the previous section; continuous measurement and adjustment of