FORD FLTM BU 110-01-2000 OIL RESISTANCE TEST FOR VINYL TAPE (Replaces FLTM BU 010-01)《聚氯乙烯绝缘带的耐油性试验 替代FLTM BU 010-01[替代 FORD FLTM BU 010-01]》.pdf

上传人:amazingpat195 文档编号:747536 上传时间:2019-01-14 格式:PDF 页数:1 大小:19KB
下载 相关 举报
FORD FLTM BU 110-01-2000 OIL RESISTANCE TEST FOR VINYL TAPE (Replaces FLTM BU 010-01)《聚氯乙烯绝缘带的耐油性试验 替代FLTM BU 010-01[替代 FORD FLTM BU 010-01]》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BU 110-01 Date Action Revisions 2000 11 13 Revised Editorial n o technical change A. Cockman 1992 01 07 Printed copies are uncontrolled Page 1 of 1 Copyright 2000, Ford Global Technologies, Inc. OIL RESISTANCE TEST FOR VINYL TAPE Application This procedure is used to tes

2、t the oil resistance of vinyl tape when subjected to high swelling oil at an elevated temperature. Apparatus Required Laboratory Oven Maintained at 50 +/ - 2 C Test Tube 10 x 75 mm High Swelling Oil ASTM No. 3 Oil (ASTM D 471) Aniline Point - 70 +/ - 2 C (ASTM D 611) Saybolt universal viscosity - 15

3、5 +/ - 5 s at 38 +/ - 2 C (ASTM D 88) Flash Point - 165 +/ - 2 C (ASTM D 92) Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/ - 2 C and 50 +/ - 5 % relative humidity for not less than 24 h prior to testing and tes

4、ted under the same conditions unless otherwise specified. Procedure 1. Cut a 600 mm length of tape from the sample roll. 2. Wrap the tape spirally around the test tube with a 20 g/mm width tension and with an overlap of one -half the width of the tape in a simulated splice, except the last 25 mm of

5、tape shall be applied without tensio n. 3. Suspend the assembly vertically in clean ASTM No. 3 high swelling oil at 50 +/ - 2 C for 48 hours. 4. After the test period, remove the test tube assembly and examine for blistering or unwinding of more than one turn of tape, as specified by the re levant Materials Engineering Specification. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1