FORD WSK-M6J172-A2-1993 HARDENER FOR REPAIR PRIMER FILLER《修复底漆填料用硬化剂》.pdf

上传人:孙刚 文档编号:750995 上传时间:2019-01-14 格式:PDF 页数:4 大小:16.23KB
下载 相关 举报
FORD WSK-M6J172-A2-1993 HARDENER FOR REPAIR PRIMER FILLER《修复底漆填料用硬化剂》.pdf_第1页
第1页 / 共4页
FORD WSK-M6J172-A2-1993 HARDENER FOR REPAIR PRIMER FILLER《修复底漆填料用硬化剂》.pdf_第2页
第2页 / 共4页
FORD WSK-M6J172-A2-1993 HARDENER FOR REPAIR PRIMER FILLER《修复底漆填料用硬化剂》.pdf_第3页
第3页 / 共4页
FORD WSK-M6J172-A2-1993 HARDENER FOR REPAIR PRIMER FILLER《修复底漆填料用硬化剂》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Release No. Released1993 12 10 C10352500 Released D.G. GreenWP 3948-a Page 1 of 4 HARDENER FOR REPAIR PRIMER FILLER WSK-M6J172-A21. SCOPEThe ma terial defined by this specification is an epoxy based hardener foruse with acryli

2、c based repair primer filler. The ratio of the twocompon ents is specified by the supplier, following application the systemmay be air dried or force dried.2. APPLICATIONThis speci fication was released originally for a material to be used inconjunct ion with a primer component as a priming system f

3、or sand-throughareas on exterior automotive body surfaces.The primer is applied directly over the substrate follow ing damage and sandthrough, primed surface may then be lightly sanded and overcoated witheither acid catalysed body stoving enamel or an approved two pack repairena mel system depending

4、 on the particular stage in the Painting processthat the damage has been sustained in.3. REQUIREMENTS3.1 STATISTICAL PROCESSSupplie rs must conform to the requirements of Ford Quality SystemStand ard Q-101. A mutually acceptable Control Plan as describedtherein is required for material/source approv

5、al. Appropriatestatist ical tools must be used to analyze process/product data sothat variation in the final product is continually reduced.3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSISFord Motor Company in its option, may conduct in frared and/or thermalana lysis of materials/parts supplie

6、d to this specification. The IRspectra and thermograms established for initial approval shallconst itute the reference standard and shall be kept on file at thedesignated Material Laboratory. All samples sha ll produce IR spectraand thermograms that correspond to the reference standard when testedun

7、der the same conditions.ENGINEERING MATERIAL SPECIFICATIONWSK-M6J172-A2WP 3948-b Page 2 of 4 3.3 CONDITIONINGTest panels with stoved paint systems shall be aged for 72 h at 23+/- 2 C or 16 h at 43 +/- 2 C before testing for resistanceproperties unless otherwise specified.Test panels with completely

8、air drying paint systems shall be agedfor 7 days at 23 +/- 2 C or 36 h at 43 +/- 2 C before testing forresistance properties unless otherwise specified. Al l tests according to this specification shall be performed in acontrolled atmosphere of 23 +/- 2 C and 50 - 65 % relative humidityif not otherwi

9、se specified.3.4 COMPOSITION3.4.1 Resin Epoxy based hardeners or suitablenon-isocyanate alternatives3.4.2 Solvent Emmisions Initial Sample +/- 1 %(ASTM D 3960)This r equirement is as determined by the United StatesEnvironmental Protection Agency Method #24 and is onlyapplicaqble to materials used in

10、 the USA.3.5 MATERIAL PROPERTIES3.5.1 Non-volatile Initial Sample +/- 1 %(FLTM BI 102-01)3.5.2 Density Initial Sample +/- 0.02 g/mL(ASTM D 1475)3.5.3 Viscosity as supplied Initial Sample +/- 5 s Ford 4 Cup(FLTM BI 111-01) at 25 C3.5.4 Spraying Viscosity As specified by the supplier(FLTM BI 111-01,wh

11、en mixed with theprimer component in theratio indicated by 3.5.5)3.5.5 Mixing Ratio As specified by the Supplier3.5.6 Dry Hiding Power, max 20 micrometre(FLTM BI 158-01)3.5.7 Storage Stability 90 daysDuri ng a storage of 90 days between 5 and 32 C temperaturethe material shall not settle up or cake.

12、ENGINEERING MATERIAL SPECIFICATIONWSK-M6J172-A2WP 3948-b Page 3 of 4 3.5.8 Flash Point(ASTM D 56)The f lash point shall conform to the safety regulationsapp licable to the plant and/or country where the materialshall be used.3.8 PREPARATION OF TEST PANELS3.8.1 FLTM BI 103-02Prepare standard painte d

13、 test panels in accordance with testmethod ie. phosphated t est panels, UMA 18004 or 18005 coatedwith current body painting system; cathodic electrocoat,primer surfacer, and topcoat enamel.3.8.2 Spot Repair SimulationRub th rough the standard paint system 3.8.1 to bare steelusing the “feathering tec

14、hnique“ with the approp riate wet/drysa nd paper. Clean the created spot-repair area with anappropriate degreasing solvent, then allow to dry and “tackoff“.Mix the hardener and primer in the recomended ra tio and applythree coats of the two pack primer system, 25 - 35micrometres.Enamels containing a

15、cid catalyst. Bake 10 minutes at 100 Cmetal temperature.3.9 FILM AND RESISTANCE PROPERTIESRefe r to corresponding primer material specification forrequired resistance properties of the applied two componentpriming system.3.10 PAINT COMPATABILITYPri or to making any changes in properties and/or compo

16、sition ofori ginally approved paint, the supplier must certify compliance toall requirements of direct glazing system specif ication (test values,not nominal values) and obtain approval from the responsibleMaterials Engineering activity. For approved direct glazing systemcontact the responsible Mate

17、rials Engineering activity.ENGINEERING MATERIAL SPECIFICATIONWSK-M6J172-A2WP 3948-b Page 4 of 4 3.11 SUPPLIERS RESPONSIBILITYAll materials supplied to this specification must be equivalent inal l characteristics to the material upon which approval wasoriginally granted.Pri or to making any change in

18、 the properties, composition,constr uction, color, processing or labeling of the materialorig inally approved under this specification, whether or not suchchange s affect the materials ability to meet the specificationrequir ements, the Supplier shall notify Purchasing, Toxicology andthe affected Ma

19、terials Engineering activity of the proposed changesand obtain the written approval of the Materials Engineeringactivity. Test data, t est samples and a new code identification areto be submitted with the request.Substance restrictions imposed by law, regulations or Ford, apply tothe materials addre

20、ssed by this document. The restrictions aredefined in Engineering Material Specification WSS-M99P9999-A1.4. APPROVAL OF MATERIALSMat erials defined by this specification must have prior approval by theresp onsible Materials Engineering activity. Suppliers desiring approvalof thei r materials shall f

21、irst obtain an expression of interest from theaffec ted Purchasing, Design and Materials Engineering activity. Uponrequest, the Supplier shall submit to the affected Materials Engineeringactivity a completed copy of their laboratory test reports, signed by aqualified and authorized representative of

22、 the test faci lity, demonstratingful l compliance with all the requirements of this specification (testresults, not nominal values), the material designation a nd code number, andtes t specimens for Ford evaluation. Fords engineering approval of amateri al will be based on its performance to this s

23、pecification and on anassessment of suitability for i ntended processes and/or applications. Uponapprov al, the material will be added to the Engineering Material ApprovedSource List.5. GENERAL INFORMATIONThe information below is provided for clarification and assistance inmeeting the requirements of the specification.5.1 Density of Dry Film Applied See Initial Sample +/- 0.02 kg/Lthe mixed Two Component System(FLTM BI 154-02)

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1