GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf

上传人:吴艺期 文档编号:754554 上传时间:2019-01-19 格式:PDF 页数:19 大小:731.66KB
下载 相关 举报
GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf_第1页
第1页 / 共19页
GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf_第2页
第2页 / 共19页
GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf_第3页
第3页 / 共19页
GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf_第4页
第4页 / 共19页
GEIA EIA-738-1997 Guideline on the Use and Application of Cpk (Formerly TechAmerica EIA-738)《Cpk的使用和应用指南》.pdf_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、I EIA STANDARD Guideline on the Use and Application of Cpk EIA-738 SEPTEMBER 1997 (Reaffirmed May 2001) ELECTRONIC INDUSTRIES ALLIANCE GOVERNMENT ELECTRONICS GND INFORMATION TECMNOLOGY ASSOCIATION A SECTOR OF Elsctronic Industries Alliance Copyright Government Electronics hence, they may severely un

2、derestimate true process variability. In addition, the appropriateness of the constants d2 and c4 is dependent upon the underlying distribution of the base data being normal, i.e., Gaussian. If this is true, and the process is in, or near, a “state of statistical control“, then these estimators will

3、 give essentially the same results. Copyright Government Electronics however, this does not imply strict rigidity. When knowledge of a process or product increases to the level that procedures for estimating Cpk should be altered, then such changes should be made, documented, and a new base point es

4、tablished. It is important for an organization involved in supplier evaluation via Cpk to realize that the greatest value of Cpk will often not be the actual number obtained. The greatest value of Cpk will most likely be as a discussion topic to initiate dialogue towards stronger and more cooperativ

5、e supplierhstomer relationships. Copyright Government Electronics then the relevant product variance estimate becomes A 4 d = s? - s2 -1 This is certainly not the only way to account for measurement enor; however, it is one rather simple, straightforward approach. Another example of the use of varia

6、nce components in estimating o involves the proper inclusion of among-subgroup variability in the estimate. An estimate of this component of variability can be obtained as where n = the number of observations in each subgroup, and - G i=i = (l/(G-l)X (Z, - X)2 Mean S2 Copyright Government Electronic

7、s Cheng, Smiley W.; and Spiring, Frederick A., “A New Measure of Process Capability: Cpm“. Journal of Oualitv Technology, vol. 20, no. 3, July 1988, pages 162-175. (3) Chou, Owen, and Borrego A., “Lower Confidence Limits on Process Capability Indices“, Journal of Oualitv Technology, Vol. 22, No. 3,

8、July 1990, pp. 223-229. (4) Clements, John A., “Process Capability Calculations for Nonnormal Distributions“. Ouality Promess, September 1989, pages 95-100. (5) Duncan, Acheson J., Oualitv Control and Industrial Statistics, fifth edition. IRWIN, Homewood, Illinois 60430. 1986. (6) Gunter, Berton H.,

9、 “The Use and Abuse of Cpk“. Oualitv Progress. Part 1, January 1989, pages 72-73. Part 2, March 1989, pages 108-109. Part 3, May 1989, pages 79-80. Part 4, July 1989, pages 86-87. Correction, September 1989, page 11. “The Use and Abuse of Cpk Revisited“, January 1991, pages 90-94. (7) Holmes, Donald

10、 “Basic Training Review: A Quality Portfolio Management Chart“. Quality, December 1987, page 67. (8) James, Paul C., “Basic Training Review: Cpk Equivalencies“. Ouality, September 1989, page 75. (9) Kane, Victor E., “Process Capability Indices“. Journal of Oualitv Technolow, vol. 18, no. 1, January

11、 1986, pages 41-52. Corrigenda, vol. 18, no. 4, October 1986, page 265. (10) Kirch, Andrew R., “Some Challenges in the Application of SPC to Complex Manufacturing Processes“. 3M Company. October 23, 1986. (1 1) Mullenix, Paul D., “The Capability of Capability Indices with an Application to Guardband

12、ing in a Test Environment,“ International Test Conference Proceedinns, 1 990, IEEE, pp. 907-915. (12) Pennucci, Nicholas J., “Tech Briefs: Creating a Process Model for SPC“. Machine Desim, January 12, 1989, pages 138-140. Copyright Government Electronics & Information Technology Association Reproduc

13、ed by IHS under license with GEIA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-h EIA-73 8 Page 14 REFERENCES AND BIBLIOGRAPHY (Cont) (13) Rado, Leonard G., “Enhance Product Development by Using Capability Indexes“. uality Promess, Apd 1989, pages 38-41. (14) Whe

14、eler, Donald J. and Lyday, Richard W., EMP - Evaluating the Measurement Process, second edition. SPC Press, Inc., 5908 Toole Drive, Suite C, Knoxville, Tennessee 37919, 1989. (1 5) “General Requirements for Implementation of Statistical Process Control“, Institute for Interconnecting and Packaging E

15、lectronic Circuits, 73 80 N. Lincoln Ave., Lincolnwood, Illinois 60646, 1990. (16) “Glossary and Tables for Statistical Quality Control“, Third Edition, Amencan Society for Quaiity Control, Statistics Division, 3 10 West Wisconsin Avenue, Suite 500, Milwaukee, Wisconsin 53203, 1996. Copyright Govern

16、ment Electronics & Information Technology Association Reproduced by IHS under license with GEIA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-Y Document No. EIA Document Improvement Proposal Document Title: If in the review or use of this document, a potential ch

17、ange is made evident for safety, health or technical reasons, please fill in the appropriate information below and mail or FAX to: Signature: Electronic Industries Alliance Technology Strategy & Standards Department - Publications Office 2500 Wilson Blvd. Arlington, VA 2220 1 FAX: (703) 907-7501 Dat

18、e: Submitters Name: Telephone No.: FAX No.: e-mail: Address: Urgency of Change: Immediate: 0 At next revision: 0 Problem Area: a. Clause Number and/or Drawing: b. Recommended Changes: c. Reasonktionale for Recommendation: Additional Remarks: _ Responsible Committee: Chairman: Date comments forwarded to Committee Chairman: Copyright Government Electronics & Information Technology Association Reproduced by IHS under license with GEIA Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ETSI ETS 300 607-3-2000 Digital Cellular Telecommunications System (Phase 2) Mobile Station (MS) Conformance Specification Part 3 Layer 3 (L3) Abstract Test Suite (ATS) (Fourteenth.pdf ETSI ETS 300 607-3-2000 Digital Cellular Telecommunications System (Phase 2) Mobile Station (MS) Conformance Specification Part 3 Layer 3 (L3) Abstract Test Suite (ATS) (Fourteenth.pdf
  • ETSI ETS 300 607-3-2000 Digital Cellular Telecommunications System (Phase 2) Mobile Station (MS) Conformance Specification Part 3 Layer 3 (L3) Abstract Test Suite (ATS) (Fourteenth_1.pdf ETSI ETS 300 607-3-2000 Digital Cellular Telecommunications System (Phase 2) Mobile Station (MS) Conformance Specification Part 3 Layer 3 (L3) Abstract Test Suite (ATS) (Fourteenth_1.pdf
  • ETSI ETS 300 608-1999 Digital Cellular Telecommunications System (Phase 2) Specification of the Subscriber Identity Module - Mobile Equipment (SIM - ME) Interface (Ninth Edition GS.pdf ETSI ETS 300 608-1999 Digital Cellular Telecommunications System (Phase 2) Specification of the Subscriber Identity Module - Mobile Equipment (SIM - ME) Interface (Ninth Edition GS.pdf
  • ETSI ETS 300 608-1999 Digital Cellular Telecommunications System (Phase 2) Specification of the Subscriber Identity Module - Mobile Equipment (SIM - ME) Interface (Ninth Edition GS_1.pdf ETSI ETS 300 608-1999 Digital Cellular Telecommunications System (Phase 2) Specification of the Subscriber Identity Module - Mobile Equipment (SIM - ME) Interface (Ninth Edition GS_1.pdf
  • ETSI ETS 300 609-2-1998 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 2 Signalling Aspects (Third Edition GSM 11 23 Ve.pdf ETSI ETS 300 609-2-1998 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 2 Signalling Aspects (Third Edition GSM 11 23 Ve.pdf
  • ETSI ETS 300 609-2-1998 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 2 Signalling Aspects (Third Edition GSM 11 23 Ve_1.pdf ETSI ETS 300 609-2-1998 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 2 Signalling Aspects (Third Edition GSM 11 23 Ve_1.pdf
  • ETSI ETS 300 609-3-1999 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 3 Transcoder Aspects (GSM 11 24 Version 4 3 1)《数.pdf ETSI ETS 300 609-3-1999 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 3 Transcoder Aspects (GSM 11 24 Version 4 3 1)《数.pdf
  • ETSI ETS 300 609-3-1999 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 3 Transcoder Aspects (GSM 11 24 Version 4 3 1)《数_1.pdf ETSI ETS 300 609-3-1999 Digital Cellular Telecommunications System (Phase 2) Base Station System (BSS) Equipment Specification Part 3 Transcoder Aspects (GSM 11 24 Version 4 3 1)《数_1.pdf
  • ETSI ETS 300 612-1-1996 Digital Cellular Telecommunications System (Phase 2) Network Management (NM) Part 1 Objectives and Structure of Network Management (GSM 12 00 Version 4 5 0).pdf ETSI ETS 300 612-1-1996 Digital Cellular Telecommunications System (Phase 2) Network Management (NM) Part 1 Objectives and Structure of Network Management (GSM 12 00 Version 4 5 0).pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1