1、 GMDAT ENGINEERING STANDARDS General Specification Powertrain Integration LIMITED USE EDS-T-2202 Gear Shift Guide Control Assembly Test Procedure Do Not Use on New Program; No Replacement. d63 F8C 48& C) 62|/H* 4G 98 88x 7 , F6* 72T8p) F$ . 1.1 +95 . ., E:48t d63 F8C 48& C) 62|/H* (8F 48& ( F$ .)8 4
2、G 907 38%P E:48x 957F$ . 2.1 17 E:4 / . F$-1F 68 . 2.2 GM E:4 / . EDS-T-2201 3 4G F+ 4G 8t 48&7t , .E8 $E8p) !#86 $88 4G 8x F$ . 3.1 48& 4G . 3.1.1 BA (Torque) 4G . 3.1.2 Fp)4G . 3.2 .E 4G . 3.2.1 48& )$4 BA * ?U9IF$ . 4.2.3 ! 4G . 4.2.3.1 48& ) 4G 8x 44F$ . GMDAT ENGINEERING STANDARDS EDS-T-2202 Co
3、pyright 2010 General Motors Company All Rights Reserved November 2010 Page 3 of 4 Version : 3 4.2.3.4 During or after the test, check that there are any change in the tumble and the riveting. 4.2.3.4 4G :E D# 7x* G7 Bt/H -C *-D9.8 -GI &%8x 1F$ . Figure 2: Guide lever / ,* 2: 48& )$4 /xC* BA * ?U9IF$
4、 . Figure 3: Intermediate Lever Assembly / ,* 3: 8Bd-,&H6C )$4 BA * ?U9IF$ . Figure 4: Adjusting Bolt Assembly / ,* 4: 6&943D9 .0C 62|/H* 5 Test Standard It shall conform to the drawing specification. 6 Notes 6.1 Glossary. Not applicable. 6.2 Acronyms, Abbreviations, and Symbols. Not applicable. 7 C
5、oding System This standard shall be referenced in other documents, drawings, etc., as follows: EDS-T-2202 8 Release and Revisions This standard was originated in July 1993. It was first approved by GMDAT Engineering Standards in July 1993. It was first published in July 1993. 5 4G 5 F+8 4G 8t $+8 9P
6、?7 &d*$ . 6 768 9I8 6.1 98,l 76 . F$-1F 68 . 6.2 66 -C dGl . F$-1F 68 . 7 Ed - $* ,l2P! $+ &%72P ., E:48 87%T $80 M8 EdF$ . EDS-T-2202 8 9P9I -C P9I 8)Y ., E:48t 1993 “x 7 87 E:4 -Gl4 .7 %L6 , d3TE:41,h7 8F 1993“x 787 38%L6$ . ., E:48t 1993“x 787 ) 9P9I / -PF%L6$ . Issue / P9I8)Y Publication Date / 38 88 Description (Organization) / 9PP9I76 (:04.2P ) 3 NOV 2010 Limited use with no replacement (Thermal/ICE Subsystem Validation Team) / F9I957 ($4=E:4 68 ) =* (Thermal/ICE.ED4D4 )