GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf

上传人:ownview251 文档编号:757160 上传时间:2019-01-19 格式:PDF 页数:9 大小:175.80KB
下载 相关 举报
GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf_第1页
第1页 / 共9页
GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf_第2页
第2页 / 共9页
GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf_第3页
第3页 / 共9页
GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf_第4页
第4页 / 共9页
GMKOREA EDS-T-5442-2008 THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT.pdf_第5页
第5页 / 共9页
点击查看更多>>
资源描述

1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT Do Not Use on New Programs. Being Replaced by GMW3172 EDS-T-5442 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 (Superceded) THE ELECTRIC COMPONENTS

2、 TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 1/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T255 Program). It is Superceded for all future projects and replaced by GMW3172. 1. PURPOSE

3、To evaluate component performance of Voice Warning Unit (hereafter called VWS) applied for GMDAT (hereafter called the Company) vehicles. 2. APPLICABLE EXTENT Applied for VWS component test mounted to passenger car. 3. DEFINITION 3.1. Voice Warning Unit Generating voice warring through Double Voice

4、Coil Speaker by detecting abnormal operation of vehicle system. 3.2. Double Voice Coil Speaker Available to perform audio input & voice warning by 1 speaker with double coil vibrating diaphragm in speaker. 4. TEST CONDITION 4.1. Standard Test Voltage The voltage indicated in drawing or test standard

5、 as test voltage for module performance & durability. 4.2. Standard test condition Carry out test at normal temp/humidity described in KS A006 (test site standard condition), if not specified. 4.3. DUT (device under test) quantity Based on 14 units at minimum. 5. TEST MEASURING UNIT & EQUIPMENT 5.1.

6、 General Governmental Authority of Calibration shall approve test-measuring unit and the period is to be valid. 5.2. Thermostat Available to maintain temp 40 to +90, the capacity shall be over 100 at minimum and permissible error shall be within +2/temp adjusting relative humidity up to 95% at each

7、temp as 5.3. Vibration test unit Available to perform test based on KS R 1034 (Vibration component vibration test method). THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 2/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology 5.4. Control

8、unit for durability test Auto circuit breaker able to apply or intercept power for unit operation during durability test and unit to record processing time & frequency by detecting error. 6. TEST 6.1. External test 6.1.1. Visual test (1) Visual inspection (2) Observe harmful scratch, crack and other

9、 defects to effect on performance by visual inspection. 6.1.2. Dimension test Indicated test tools in KS B 5203(vernier calipers) should be used, DUT is to be compiled to material quality according to deign spec and manufactures dimension is to be equal to drawing. 6.2. Performance 6.2.1. Basic func

10、tion test Operating parameter of basic performance in drawing is to be within tolerance of standard test voltage. 6.2.2. Operating Voltage (1) DUT should be normally operated at Operating Voltage, 9V16V & Operating temp, -30 +80 in supply voltage-9V to 16V, basic performance in 6.2.1 is to be satisf

11、ied. Only if necessary, operating temp items may be followed by drawing condition under agreement with test division. (2) Carry out measurement at 3-test voltage within operating voltage range, if there is no special rule indicated. 6.2.3. Leakage current (1) Carry out measurement at standard test v

12、oltage 12.6 0.1V of real load composition at battery power line. (2) Set ignition power line to OFF at this time. (3) Measured leakage current should not be exceeding of 5 , if there is no special rule indicated. 6.3. Electric Tolerance Test 6.3.1. Power voltage variation test (1) To check unit norm

13、al operation against electric shock caused by Power voltage alteration. (2) Compose DUT equal to design spec, apply the following test voltage of 10cycles to battery & ignition power terminal by voltage variation type respectively, then basic performance in 6.2.1 should be satisfied. * Test temp: St

14、andard test temp at normal temp/humidity * Total test cycle: 10 cycles * Test cycle THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 3/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology A TYPE (voltage variation wave form at engine starti

15、ng) B TYPE (Chattering generation wave form at Battery power supply) C Type (voltage variation wave form by IGN Key Switch) 6.3.2. Reverse/overload test (1) Carried out for protecting unit inner circuit against reverse/overload generated from vehicle at battery discharging. (2) Connect wiring equal

16、to car condition during test, operate unit by inserting inner protection circuit (fuse) to system with inner protection circuit. (3) Replace it immediately with inner protection circuit (fuse) of equivalent spec and connect it if the power is disconnected by inner protection circuit (fuse) operating

17、. (4) Compose DUT equal to design spec, apply the following test voltage cycle to battery & ignition power terminal by the following type, then basic function in 6.2.1para shall be satisfied. z Overload A Test voltage : 180.2V Test time: 60min Test temp: Standard test temp at normal temp/humidity T1

18、Volt 12(V) 0(V) SECT24SEC X 10Volt 8(V) 6(V) 1) Duty: 50% 2) Proximate wave form available Over 5Pulse1) T1: 1020mSEC 2) Duty: 50% 3) T2: Sufficient time for operation checkSECT1Volt 12(V) 0(V) SECT2Over 5Pulse4) T1:0. 53SEC 5) Duty: 50% 6) T2: Sufficient time for operation check Volt T2Over 5PulseT

19、HE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 4/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology z Overload B Test voltage : 240.2V Test time: 1min Test temp: Standard test temp at normal temp/humidity z Reverse voltage Test voltage:

20、- 14 0.2V Test time: 1min Test temp: Standard test temp at normal temp/humidity 6.3.3. SHORT CIRCUIT No inner circuit damage and basic function in 6.2.1 shall be satisfied when all I/O signal terminal of unit is shorted to power terminal or ground for 1min at Standard test voltage. 6.3.4. ISOLATION

21、RESISTANCE TEST ISOLATION RESISTANCE shall be more than 500Mega Mohm (No exothermic, ignition due to leak current at case ground) when 500(V)-Alternating Current (AC) is applied between connector pin, connector and unit case. 6.4. Weather environmental test 6.4.1. High temp storage test (1) Compose

22、UDT equal to design spec. (2) Unit should be normally operated when basic function in 6.2.1 is measured after carrying out the following conditions and drying DUT for 2hrs at normal temp/humidity. z Test temp : +852 z Test time: 94 hrs z Test voltage : +14(V) Applied to battery & ignition power term

23、inal at temp storage. 6.4.2. Low temp storage test (1) Compose DUT equal to design spec. (2) Unit should be normally operated when basic performance in 6.2.1 is measured after carrying out the following conditions and drying DUT for 2hrs at normal temp/humidity. z Test temp: -402 z Test time: 70hrs

24、z Test voltage: +9(V) Applied to battery & ignition power terminal at temp storage. 6.4.3. Temperature Cycle Test (1) Compose DUT equal to design spec. (2) Unit should be normally operated when basic function in 6.2.1 is measured after carrying out the following conditions and drying DUT for 2hrs at

25、 normal temp/humidity. z Test temp: -302 802 z Total test cycle : 30 cycles(carried out after 1hr-storage at 402) THE ELECTRIC COMPONENTS TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 5/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology z Test voltage : 12.60

26、.2V Applied to battery & ignition power terminal at temp storage. 6.4.4. Humidity test (1) Compose DUT equal to design spec. (2) Unit should be normally operated when basic function in 6.2.1 is measured after carrying out the following conditions and drying DUT for 2hrs at normal temp/humidity. z Te

27、st temp : +402 z Relative humidity : 982 % z Test time: 72 hrs z Test voltage : 12.60.2 V Applied to battery & ignition power terminal at temp storage. 6.4.5. Temperature/Humidity Cycle Test (1) Compose DUT equal to design spec. (2) Unit should be normally operated when basic function in 6.2.1 is me

28、asured after storing DUT for 2hrs at environmental temp 25, relative humidity 65% and carrying out the following conditions. z Total test cycle: 5 cycles z 1 cycle Pattern 6.4.6. Thermal shock (1) Compose DUT equal to design spec. (2) Unit should be normally operated when basic performance in 6.2.1

29、is measured after carrying out the following conditions and drying DUT for 2hrs at normal temp/humidity. 85 25 -30 t 1h2h 1CYC(8h) 2h 1h 2hOperating Storing 85 25 -30 t 10h2h No humidity adjustment in this section 4h OPERATING STORING90% 2h1h2h 2h60/90% 45/95%90%-1025/65% 1Cycle(24h)THE ELECTRIC COM

30、PONENTS TEST FOR VOICE WARNING UNIT EDS-T-5442PAGE: 6/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology z Test temp: -402 852 z Total Test Cycle: 20 cycles 6.4.7. DUST TEST (1) Compose DUT equal to design spec. (2) Unit should be normally operated when bas

31、ic function in 6.2.1 is measured after carrying out the following conditions by placing the unit bottom downward and putting it in the middle of DUST CHAMBER. z Stop time: 20min z Dust spray time: 5min z Total operating time: 8hrs Test voltage : 12.60.2 V Applied to battery & ignition power terminal

32、 at temp storage. 6.4.8. Salt Fog Test (Only for metal Case) (1) To evaluate corrosion resistance of metal parts covered with metal material or gliding, inorganic/organic tonic. (2) No accumulation on the Case after storage for 24hrs at normal temp/humidity after carrying out the following condition

33、 and washing it with flowing water z Test temp : 402 z Salt Solution: 5wt% z Test time: 96Hrs 6.5. Mechanical environment test 6.5.1. Vibration test Carried out test on real car mounting condition to Vibration test unit, the unit should be normally operated when basic function in 6.2.1para is measur

34、ed after applying vibration as follows (1) Frequency Range: 25Hz 1000Hz (2) Acceleration: 25Hz to 4.34G/Hz, 1000Hz to 0.1G/Hz (3) Total Acceleration: 2G (4) Test Period: 24hrs in each direction (X, Y, Z) 6.5.2. Free fall test 85 25 -40 T30s t 1h 1h 1CYC25 T30s t THE ELECTRIC COMPONENTS TEST FOR VOIC

35、E WARNING UNIT EDS-T-5442PAGE: 7/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Carried out test on the concrete ground, the unit should be normally operated when basic function in 6.2.1 is measured after falling unpacked DUT 2times respectively at 0.5m

36、-height from the ground level to corner, L/R, F/B. 6.5.3. TERMINAL/CONNECTOR (1) Mounting force supply test No mechanical, electrical damage when 50N-force is applied to unit terminal toward axis direction. (2) Detaching force supply test No looseness or electrical contact when unit connector is pul

37、led by 110N-force toward optional direction. 6.5.4 Mechanical impact test (1) To evaluate impact durability of unit. (2) Unit should be normally operated when basic function in 6.2.1 is measured after applying 20 cycles of half cycle-SINE waves with 25G per 13Ms to 3 axis direction using impact test

38、 unit. 6.6. Operating durability test 6.6.1. Apply equivalent load to DUT with real car condition. 6.6.2. Operate DUT with initial load at maximum operating temp & standard operating voltage for 1000hrs and operating for each performance is based on the drawing. 6.6.3. Each component shall be normal

39、ly operated during/after test under the following test condition and all performance value should be within indicated tolerance. (1) Test temp : -30 +802 (2) Test time : 1 Cycle 6.7. Electromagnetic Compatibility 6.7.1. Radiated Emission This test is performed based on EDS-T-5524, Narrowband Emissio

40、n and measurements should not be beyond limited value. 6.7.2. Bulk Current Injection This test is performed based on EDS-T-5512 and operation malfunction should not be occurred at electromagnetic waves obstacle removal (at return) 85 25 -40 1h 10h2h 10h 1h 1CYCTHE ELECTRIC COMPONENTS TEST FOR VOICE

41、WARNING UNIT EDS-T-5442PAGE: 8/8 ISSUED DATE: 2001. 12. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology 6.7.3. Conducted Susceptibility This test is performed based on EDS-T-5011, Region 2 condition should be satisfied when ISO 7637 Pulse #1 to #7(level 2) is applied to unit pow

42、er according to ISO 7637-1. 6.7.4. Electrostatic Discharge (1) Operating Mode: Normal operating after performing test based on EDS-T-5005 (GM9109P) z Direct discharge(3time) : 4kV (330pF2000,150pF2000) z Air discharge(3time) : 8kV (330pF2000,150pF2000) (2) No operating Mode: Normal operating after p

43、erforming test based on EDS-T-5526 (GM9119P). z Direct discharge (3time) : 4kV (330pF2000,150pF2000) (3) Susceptibility Criteria: Region 1 6.8. Tear Down Analysis This test is not considered as evaluation item, however it should be unavoidably carried out at failure occurrence during test. 7. UNIT T

44、EST ITEM BY TEST MATERIAL Chart 1. Test material by test item Test items S1 S2 S3 S 4 S 5 S 6 S7 S8 S9 S10146.1 X X X X X X X X X X 6.2 X X X X X X X X X X 6.3 X X X 6.4.4 X X X 6.4.5 X X X 6.4.6 X X X 6.5 X X X 6.4.1 X X X 6.4.2 X X X 6.4.3 X X X 6.4.7 X X X 6.4.8 X X X 6.6 X X X 6.7 X Note) 1 X, as stated above is unit test item of each DUT.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1