ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf

上传人:unhappyhay135 文档编号:789891 上传时间:2019-01-31 格式:PDF 页数:384 大小:48.83MB
下载 相关 举报
ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf_第1页
第1页 / 共384页
ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf_第2页
第2页 / 共384页
ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf_第3页
第3页 / 共384页
ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf_第4页
第4页 / 共384页
ISA MNTRNG MEAS I&C PERF NUC PWR PLNT-2014 Monitoring and Measuring I&C Performance in Nuclear Power Plants.pdf_第5页
第5页 / 共384页
点击查看更多>>
资源描述

1、MONITORING AND MEASURING I V = voltage; I = current).2 Fig. I.2 Data acquisition signal path for OLM .12 Fig. 1.1 Example of conventional sensors used in a PWR NPP 23 Fig. 1.2 Important pressure transmitters in a loop of a PWR plant24 Fig. 1.3 Bathtub curve showing different failure possibilities .2

2、7 Fig. 1.4 OLM techniques categorized by source of data .33 Fig. 1.5 OLM applications versus sampling frequency 34 Fig. 1.6 OLM applications of static and dynamic data analysis 35 Fig. 1.7 Simplified diagram of chemical and volume control system components 37 Fig. 1.8 Actual noise data from a pressu

3、re transmitter in an NPP and spectrum of one-hour record of this data .38 Fig. 1.9 Effect of sensing-line blockage on dynamic performance of a pressure transmitter .39 Fig. 1.10 Auto power spectral density containing vibration signatures of reactor internals 39 Fig. 1.11 Principle of LCSR test 42 Fi

4、g. 1.12 Potential outcomes of TDR tests .44 Fig. 1.13 Integrated OLM system .46 Fig. 2.1 Slope and intercept of a calibration curve 50 Fig. 2.2 Schematics of two typical deadweight testers .50 Fig. 2.3 Zero shift .53 Fig. 2.4 Span shift with and without zero shift .54 Fig. 2.5 Hysteresis 54 Fig. 2.6

5、 Principle of as-found and as-left calibration limits 57 Fig. 2.7 In-situ methods to verify the calibration of process instruments 58 Fig. 2.8 On-line monitoring data for four boiler level transmitters in an operating power plant 59 Fig. 3.1 Zero-order transfer function 62 Fig. 3.2 Frequency test pr

6、inciple 63 Fig. 3.3 Equipment setup for PI testing .65 Fig. 3.4 Typical PI test transients 65 Fig. 3.5 PI test transients from response-time testing of force-balance pressure transmitters 67 Fig. 3.6 Noise data acquisition sequence .68 Fig. 3.7 Normal and skewed APDs of pressure transmitter noise si

7、gnals .70 Fig. 3.8 Examples of PSDs of nuclear plant pressure transmitters .71 Fig. 3.9 Equipment setup for sensor response-time testing using the noise analysis technique .72 00-Frontmatter_final to ISA.indd 9 12/18/2013 2:32:55 PMx Monitoring and Measuring I (b) LCSR can determine the degree of bo

8、nding of strain gauges to solid surfaces . 276 Fig. 14.13 LCSR for in situ testing of a thermocouple problem 276 Fig. 14.14 (a) RTD circuit; (b) TDR test results of the RTD circuit . 277 Fig. 14.15 Failed RTD detected by TDR 278 Fig. 14.16 Results of TDR monitoring of a thermocouple . 278 Fig. 14.17

9、 (a) Capacitance measurement results for ten RTDs and dissipation factor calculations (for lead X1 to ground); (b) RTD circuit for the results shown in this table . 279 Fig. 14.18 (a) and (b) Screenshots of OLM software . 279 Fig. 14.19 (a) and (b) Data qualification results 279 Fig. 15.1 Primary lo

10、op of a Pressurized Water Reactor (PWR) . 285 Fig. 15.2 Normal output of a process sensor with illustration of the DC and AC components of the output . 285 Fig. 15.3 Online monitoring applications of static and dynamic data analysis described in this chapter 287 Fig. 15.4 Online monitoring applicati

11、ons versus sampling frequency 288 Fig. 15.5 Photograph of a nuclear plant sensing line with a partial blockage . 290 Fig. 15.6 Research results on the effect of sensing-line blockages on response time of nuclear plant pressure transmitters 291 Fig. 15.7 Example of a pressure transmitter filtering th

12、e process noise . 293 Fig. 15.8 Examples of auto power spectral densities of nuclear plant pressure transmitters 293 Fig. 15.9 Simplified diagram of chemical and volume control system components . 297 Fig. 15.10 Normal operation of chemical and volume control system flow parameters .298 Fig. 15.11 C

13、hemical and volume control system flow parameters at the onset of a reactor coolant pump seal leak . 298 Fig. 15.12 Auto power spectral density containing vibration signatures of reactor internals . 299 Fig. 15.13 Illustration of cross-correlation principle involving a neutron detector and a core-ex

14、it thermocouple to determine transit time 301 Fig. 15.14 (a) Detector placement; (b) Typical detector noise data record . 302 Fig. 15.15 Frequency domain phase analysis to determine transit time 302 Fig. 15.16 Auto power spectral density of a neutron detector showing degradation due to an increase i

15、n cable capacitance . 304 Fig. 15.17 Block diagram of on-line monitoring system . 306 Fig. 15.18 Dedicated data acquisition system for on-line monitoring . 307 Fig. 15.19 Data flow in separating the AC component of a sensor output from its DC component 308 Fig. 16.1 Dedicated data acquisition system 312 Fig. 16.2 Compressed data from a nuclear plant data historian 313 Fig. 16.3 Missing data record in measurements from a nuclear power plant . 313 00-Frontmatter_final to ISA.indd 13 12/18/2013 2:32:56 PM

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 8013-2012 en_1116  Rubber vulcanized Determination of creep in compression or shear《硫化橡胶 压缩或剪切蠕变的测定》.pdf BS ISO 8013-2012 en_1116 Rubber vulcanized Determination of creep in compression or shear《硫化橡胶 压缩或剪切蠕变的测定》.pdf
  • BS ISO 8018-2007 en_4981  Tools for moulding - Guide bushes headed and locating guide bushes headed《模制工具.有头的导套和有头的定位导套》.pdf BS ISO 8018-2007 en_4981 Tools for moulding - Guide bushes headed and locating guide bushes headed《模制工具.有头的导套和有头的定位导套》.pdf
  • BS ISO 8020-2002 en_2690  Tools for pressing - Punches with cylindrical head and straight or reduced shank《压制加工用工具.带圆头和直的或缩小柄杆的冲头》.pdf BS ISO 8020-2002 en_2690 Tools for pressing - Punches with cylindrical head and straight or reduced shank《压制加工用工具.带圆头和直的或缩小柄杆的冲头》.pdf
  • BS ISO 8036-2015 en_9407  Microscopes Immersion liquids for light microscopy《显微镜.光学显微学的浸液》.pdf BS ISO 8036-2015 en_9407 Microscopes Immersion liquids for light microscopy《显微镜.光学显微学的浸液》.pdf
  • BS ISO 8038-2013 en_5299  Microscopes Screw threads for objectives and related nosepieces《显微镜.物镜及物镜座螺纹》.pdf BS ISO 8038-2013 en_5299 Microscopes Screw threads for objectives and related nosepieces《显微镜.物镜及物镜座螺纹》.pdf
  • BS ISO 8040-2001 en_6291  Optics and optical instruments - Microscopes - Dimensions of tube slide and tube slot connections《光学和光学仪器.显微镜.镜筒导板和镜筒槽连接件尺寸》.pdf BS ISO 8040-2001 en_6291 Optics and optical instruments - Microscopes - Dimensions of tube slide and tube slot connections《光学和光学仪器.显微镜.镜筒导板和镜筒槽连接件尺寸》.pdf
  • BS ISO 8051-2016 en_5555  Long shank taps with nominal diameters from M3 to M10 Full-diameter shank taps with recess《标称直径从M3至M10的长柄丝锥.带凹槽的直径柄丝锥》.pdf BS ISO 8051-2016 en_5555 Long shank taps with nominal diameters from M3 to M10 Full-diameter shank taps with recess《标称直径从M3至M10的长柄丝锥.带凹槽的直径柄丝锥》.pdf
  • BS ISO 8058-1999 en_1067  Air cargo Insulated containers Thermal efficiency requirements《航空货运.隔热集装箱.热效率要求》.pdf BS ISO 8058-1999 en_1067 Air cargo Insulated containers Thermal efficiency requirements《航空货运.隔热集装箱.热效率要求》.pdf
  • BS ISO 8066-2-2001 en_5633  Rubber and plastics hoses and hose assemblies for automotive air conditioning - Specification - Refrigerant 134a《汽车空调器用橡胶和塑料软管及软管配件.规格.制冷剂134a》.pdf BS ISO 8066-2-2001 en_5633 Rubber and plastics hoses and hose assemblies for automotive air conditioning - Specification - Refrigerant 134a《汽车空调器用橡胶和塑料软管及软管配件.规格.制冷剂134a》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1