NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf

上传人:deputyduring120 文档编号:977760 上传时间:2019-03-13 格式:PDF 页数:24 大小:979.20KB
下载 相关 举报
NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf_第1页
第1页 / 共24页
NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf_第2页
第2页 / 共24页
NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf_第3页
第3页 / 共24页
NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf_第4页
第4页 / 共24页
NAVY MIL-C-29433-1987 CAPS GARRISON MEN-S《男士守卫帽》.pdf_第5页
第5页 / 共24页
点击查看更多>>
资源描述

1、- - - MIL-C-29433 84 9999906 0497770 b W I MILITW SPEXIFICATION CAPS, CJIRRICON: MENS, This specification is approved for use by U. S. Marine Corps, iXpartJnent of the Navy, and is available for use by all Departments and Mencies of the Depariment of Defense. 1. SCOPE l0l Scope. ihic cap. 1.2 Classi

2、fication. and sizes as specified Class 1 - Cap, Class 2 - Cap, Class 3 - Cap, specification covers requiremsnts for mens garrison Ihe caps shall be of one type in the following classes (see 6-21: Polyesterfibol , Gabardine, Green 22 1 2 Gabardine, Wool, Green 2210 Elastique, -1, Green 2222 Schedule

3、of sizes 6-3/8 6-7/8 7-3/8 6-5/8 7-1/8 7-5/8 . 6-3/4 7-1/4 7-%/4 6-1/2 7 7-1/2 2. APPLICABLE DOCUMENIIC 2.1 Government documents. 2.1.1 Cpecif icatians , standards, and handbooks . The foilowing specifications, and handbooks fonn a part of this specification to the extent spcified herein. Unless oth

4、erwise spcified, the issues of these docunents shall be those listed in the issue of the ikpartment of Defense Index of Specifications and Standards (DODISC) and supplement thereto, cited in the solicitation. Beneficial ccmnents (recannendations, additions, deletions), aril any pertinent data which

5、my be of use in improving this docunent should b? addressed to the Cor-mandant of the Marine mrps (W-l), Headquarters, U. S, Marine Corps, Washington, Tx: 20380, by using the self-addressed StandarSization Doclment improvement Proposal (DD Form 1426) appariq at the end of this docmnt or by letter. A

6、MSC N/A FSC 8405 - Distribution Statement A: Approved for public release; distribGion is Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-29433 84 = 9999906 0497773 8 Elt - 79433(MC) SPECIFICATIONS FEDERAL V-!F276 V-T-30 1 “3-7 1 - - Thread, Cot

7、ton. - Thread, Silk. - Pallet, Material Handling, W, ,Stringer - Cloth, Twill Uniform, Cotton. - Label: For ClothiIql, +h text of this specification shall take precedence. the line of stitching shall tawr from zero at each end to 1/8 to 3/16 inch from folded we at center. b. fran serged edge. Join t

8、op an side crowns. Finished appearance. nie top and side crowns shall be joined to- gether without twists, puckers, pleats, or distortion, a. Position the left and right side crom on the outside of the respective top crown, with toF edges even and the point at each end of the top crown matching t.he

9、 notches in the side crowns. Stitch top crown 3/4 - + 1/8 inch b. Join the left and right side croms, res-ively, to the top crown with a l/l-inch seam, beginning and ending on the tog crown 1/4 inch from each end. Join side crown lining to cap (Class 1. Finished appearance. The side crown lining sha

10、ll be joined to the cap without twists, puckers, pleats or distortion. a. Position the left and right side crown lining, respectively, on th linin9 side of top crown, witk edges even and notches matching, ani join to the top crown-side crow seam outlet with a l/l-inch seam, The seam shall begin and

11、end on thc center fold of the top crown 1/1 inch fran each end. 30 1 30 1 or 101 301 EhM/ iICI1 IY PE sa- 1 sg-2 ia) 3%-1 SICH / 1K 8-1 2 0-1 4 or -1 o 0-1 4 A A A . A 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-e ,yo 12, 14 MIL-C-29433 84 999

12、9906 0497780 9 MIM- 79433 (MC) TABLE I MANUFACTURING REQVIREMENTS lPEtITTON Join ends of side crown. stitching shall not extend to Finished appearance. ?he ends o side crown shall be joined togethe without twists, puckers, pleats, o distortion. ?he center of the to crown shall be in line with th fro

13、nt and back seams of cap. ?h top edge of the side crown. Class 1. a. Join the left and right crowns at front and back ends with a 3/8-inch sem at the erd, tapring to 1/4 inch at the to crow joining stitch. I Class 2 an 3. b. Join the left ad right side with a 1/4-inch seam from the lomr crowns at fr

14、ont and back ends of ca serge edge up to the notch. I Join ends of side crown lininq (Class 1). Finished appearance. ?he ends of the side crown lining shall be joined without twists, puckers, pleats, or other distortion. a. Join the left and right side crown lining at front and back ends of cap With

15、 a 3/8-inch seam at tk 1oer end tapering to 1/4 inch at the top crown joining stitch. Topstitch side crown. Finished appearance. Ihe side crown shall be uniformly topstitched. cki Class 1 caps, the side crown lining at front and back ends of cap sha.i.1 not be caught in the topstitchiq. 30 1 30 1 30

16、 1 SIC H / TN 10-1 4 8-i2 i n-i 4 ?:DI. A A A 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-29433 84 9999906 0497783 O MIM-29433(MC) TABLE I MANUFACTURING REQUIREMENTS - U0 - 15. 16. (SPEKIITION a. Turn cap right side out, mrking out the u

17、pper front and back corners Spread open the sean at each end of cap and topstitch each side crown 1/16 inch from the cem. Turn the side-top crown joining seam towards the side and continue to topstitch each side crown 1/16 inch from the raised edge, catching the side-top crown joining seam in the st

18、itching. NCTE: Class 1, The topstitching at each end of ca shall not be throuuh the side crown-lining. - b. Ui the finished cap, the width of the top crown shall be 3/4 $. 1/8 inch, measured from raised earn, and with the front and kck ;ea= turned flat aqainst the body ,f the cap and caught in the s

19、titching. :. n the finishd cap, the left !nd of the curtain shail overlap the -ight end 4-1/2 + 1/4 inches, as tndicated on Figure 1, measured iloq =the bottan finished edge of 9-E cap. Join sweatband to cap. ?inished appearance. ?he mea- ;hall be snoothiy and evenly stitche LO the cap, without wrin

20、kles, pucker gathers, twists, or other distortior i!he matband shall cover the rat mttm edge of the curtain, with th lower edge of sweatband 1/R to 3/lf inch above the bottom finished edq Df cap. fie ends of the sweatbaix shall finish to the right or left oj but not on, the back seam for tht crow an

21、d shall lap each other no1 less than 3/4 inch with the top em turned der not less than 3/8 inch The combination i4entification instruckion ,and size label shail bc placed to the riqht or left of th( back seam of the crown with the to erd under the sw=atAan. a. Tne sweathand shall finish - + 1/8 inch

22、 wide. b. Turn down the curtain and psi tion the sweatband on the inside o cap, with both side edges of sweat Sand turned under in line with th 109 30 1 EAM i ICll YPE jsa-1 Ed- 1 ( each edge ) SSCH/ IN 6-1 O 10-14 _1 xm. A A A 13 Provided by IHSNot for ResaleNo reproduction or networking permitted

23、without license from IHS-,-,-MIL-C-29433 84 W 9999906 0497783 4 W MILrC-29433(MC) TABLE I MANUFACTURING REQUIREMENTS s*rcti/ NM. SEAM/ U0 OP EM TI ON slx:ll S?I-JI rtiv: 1ypt.: IN 17. Join matband to cap. (cont) stitching joining the curtin and side crown. !%itch the sweatband through curtain and si

24、de crown 1/8 inch from each folded dge, catching the turned-unifer portion in the stitching an3 leaving one end free for attaching the label. c. hirn der ard lap the free end 301 Ed-1 8-1 2 A of the sweathand on the opposite end. Place the top end of the label under the Lipper free edge of sweat- ba

25、ncl. Cecure the free enil of the swatban to the cap with a row of stitches 1/8 inch from the folded upr and lowr eges, catching the turned-Mer prtions and the label in the stitching. d. Tuni up the curtain. e. Phen the leather sweatband is 502 SSa-1 10-14 A used in lieu of the cotton sweatband or an

26、d side crown shall be overedge stitched together at the bottan edges. (see 17f) f. Ihe leather sweatband shall be 304 Lsa-1 8-1 2 A cut to the rmired length. Ihe ends of the sweatband shall be abutted and joined with a row of zigzag stitching reinforced on the underside with a strip of the coated cl

27、oth. g. ?he sweathand shall be zigzag stitched to the cap on the inside through the curtain seam allowance and side pieces, with the stitchins on the bottcm eqe of the sweatband. The mination identification size label shall be cawht behind the sweatband during this joining operation. The curtain sha

28、ll be turned up. for class 2 and 3 caps, the curtain 503 Cca-1 10-14 A BOB/ 1.PK A A A. A 14 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-29433 84 999990b 0497784 b m MIL1+2-29433(MC) m: set ancl presse before sewin9 the leather swatbard (se

29、e Oper. 19). h. Turn down the curtain and stitch the curtain to the side crown 1/16 inch fran raised dqe. Clean cap. a. Pull and remove all basting thread. Trim all ends of stitching anc ranove ail loose ends of thread from the cap. Elmove ail spots, stains, shade tickets an markings without injury

30、to the material. Ihe cap milst be canpletely. - 17. FinishITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. nlecs otherwise specified in the contract or purchase order, the contractor is responsible for the performance of ail inspection requiranents as specified herein. Except as otherwise

31、 specified in the contract or purchase order, the contractor may use kis own or any other facilities suitable for the pcrformance of the inspsction requirements specified herein, unless disapproved by Government. Te Governinent reserves the right to perform any of the inspections set forth ln the sp

32、ecification where such inspxtions are deemed necessary to assure supplies ami services conform to prescribed requirements. 4.1.1 Responsibility of canpliance. All itans must meet all requiranents of sections 3 and 5. nie inspection set forth in this specification shall become a part of the contracto

33、rs overall inspection system or quality program. Ihe absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies suhnittxd to the Goverment for acceptance comply with all reauiranents of the contract. Sm

34、pling in quality conformance does not authorize sutmission of known defective mterial, either indicated or actual, nor does it camiit the Government to acceptance of defective material. 4.1.2 Certificate - of liane. men certificates of canpliance are suhnitte, the Govermntservec the right to check t

35、est such items to determine the validity of the certification. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: 0 1. 2. First article inspection (see 4.3) Quality conformance inspection (see 4.5). 4.3 Inspection conditions. inspection chal1 b

36、e in accordance with provisions set forth in MIL-S?P-SOl, except where otherwise indicated herein. 4.4 First article. %en first article is required, inspection and testing shall be made on a mnpletely fabricated cap of each class for ail provisions of this specification applicable to end product exa

37、mination ad tests. 4.5 Quality conformance inspections 4.5.1 Component - and material testinq. In accordance with 4.1 above, components and materials shall he tested in accordance with all recniirements of referenced specifications, figures and standards unless otherwise exclude?, amended, modified

38、or qualified in this specification or applicable purchase docunent. In addition, testing shall be prformed on mponents listed in Table III ?or characteristics noted, Al1 requirements are applicable to the sample unit. Ail test reports shall contain the individual values utilized in expressing the fi

39、nal results. a 17 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-29433 4 m 9999906 0497787 1 m - MUiG- 29433(MC) I 4.5.2 sampling for testing. Sampling shall be in accordance with MurcTD- 901 except for components specified below. Ihe lot shal

40、 be unacceptable if one or mre mpie units fail to met any test requirement spscified herein. The unit for expressing lot size an sample unit for testing each camponent shall be in accordance with tfie following: Component Ut size expressed as -le Unit for Testing Eyelets 1 O00 15 4.5.3 Examination -

41、 of the end item. !the end item exanination for the finished caps shall be as specified in MIL-SIP-901. 4,5.4 Finished measurmnts. Any measurement deviating from the nominal dimension and tolerance specified in Table II, shall be classified as a measurement defect . 4.5.5 Examination of packaginq re

42、auirements. %e exmination for compliance with illegible; of improper size, location, sequence or method of application. 18 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Liu MIL-C-29433 84 9999906 0497788 3 888 vivi, $e, tnm tnm 628 ? ? m o m . m B

43、u .cl 5 ;d g . tn s 8 rci a! .Pl E u4 o i 19 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-29433 84 W 999990b 0497789 5 I: 5. PACKAGING 5.1 Packaging. Packaging shall be level A or comnercial as specified (see 6.2). 5.1.1 hvel A. Each cap sha

44、ll kx placed in an individual polyethylene bag measuring approximately 6 inches wide by 15 inches long. ?he polyethylene flexible film shall be 0.0015 inch thick. Fach bag chal1 contain a label (see 5.3). 5.1.2 Cmrcial. Ihe caps shall be packaged in accoiucnct with the manufacturers cmrcial practice

45、. 5.2 Packing Packing shall be level A, B, or carmercial as specified (see 6.2). 5.2.1 Level A. 5.2.1.1 Method 1. Che hundred twenty-five (125) caps of one size only, packaged as specified in 5.1.1 , shall be packed in a fiberboard shipping container With liner conforming to class %ather resistant,

46、size No. 2A or MILrB-17757, assembled, closed, and reinforced as specified in the appendix thereto. Tbwards the end of the contract, or when there is less than the required amount of the same size per container, mixe- sizes maybe pcked within the caaiie shipping container. 5.2.1.2 Method 2. Wien spc

47、ified (see 6.21, six level B shimins containers, (750 caps of one size only) shall be packed in a fiberboard chipping container conforming to class cw MII.d-29433 (MC) 5.3 Marking. In addition to any splcial marking required by the contract or purchase order, the shipping containers shall be marked

48、in accordance With the requirements of MIL-STD-129. 5.3.1 Polyethlene bagged packages. Polethylene bagged packages shall have the following information legibly printed or stamp3 in black directly on the bag across the center face or on a white paper label inserted within the bag so as to permit reay

49、 identification. The bag or label shall indicate the following information. 5.3.2 Mixed sizes. Each shipping container packed with mixed sizes shall have a 5 X 4 inch khite paper label securely attacheci to the end anc7 side directly under the printing or stenciling, Ihe wxdc “MIXED SIZES“ shall be plainly stamped or printed thereon, ard der these wrds shall b

展开阅读全文
相关资源
猜你喜欢
  • DIN 51729-8-2001 Solid fuels - Determination of chemical composition of fuel ash - Part 8 Determination of soda and potash (NaO KO) contents《固体燃料 燃料灰化学成分测定 第8部分 氧化钠(Na2O)和氧化钾(K2O)含.pdf DIN 51729-8-2001 Solid fuels - Determination of chemical composition of fuel ash - Part 8 Determination of soda and potash (NaO KO) contents《固体燃料 燃料灰化学成分测定 第8部分 氧化钠(Na2O)和氧化钾(K2O)含.pdf
  • DIN 51730-2007 Testing of solid fuels - Determination of fusibility of fuel ash《固体燃料试验 燃料灰可熔性的测定》.pdf DIN 51730-2007 Testing of solid fuels - Determination of fusibility of fuel ash《固体燃料试验 燃料灰可熔性的测定》.pdf
  • DIN 51732-2014 Testing of solid mineral fuels - Determination of total carbon hydrogen and nitrogen - Instrumental methods《固体矿物燃料测试 总碳、总氢和总氮的测定 仪器法》.pdf DIN 51732-2014 Testing of solid mineral fuels - Determination of total carbon hydrogen and nitrogen - Instrumental methods《固体矿物燃料测试 总碳、总氢和总氮的测定 仪器法》.pdf
  • DIN 51733-2016 Testing of solid mineral fuels - Ultimate analysis and calculation of oxygen content《固体矿物燃料的试验 氧含量的元素分析和计算》.pdf DIN 51733-2016 Testing of solid mineral fuels - Ultimate analysis and calculation of oxygen content《固体矿物燃料的试验 氧含量的元素分析和计算》.pdf
  • DIN 51734-2008 Testing of solid mineral fuels - Proximate analysis and calculation of fixed carbon《固体矿物燃料的试验 固定碳的组分分析和计算》.pdf DIN 51734-2008 Testing of solid mineral fuels - Proximate analysis and calculation of fixed carbon《固体矿物燃料的试验 固定碳的组分分析和计算》.pdf
  • DIN 51735-2009 Testing of solid fuels - Determination of plastic properties of coal with the Gieseler Plastometer《固体燃料用测试 Gieseler塑性计测定煤的塑性》.pdf DIN 51735-2009 Testing of solid fuels - Determination of plastic properties of coal with the Gieseler Plastometer《固体燃料用测试 Gieseler塑性计测定煤的塑性》.pdf
  • DIN 51739-1998 Testing of solid fuels - Determination of the dilatation of coal《固体燃料试验 煤膨胀系数的测定》.pdf DIN 51739-1998 Testing of solid fuels - Determination of the dilatation of coal《固体燃料试验 煤膨胀系数的测定》.pdf
  • DIN 51741-1998 Testing of solid fuels - Determination of the crucible swelling number of coal《固体燃料试验 煤坩埚膨胀量测定》.pdf DIN 51741-1998 Testing of solid fuels - Determination of the crucible swelling number of coal《固体燃料试验 煤坩埚膨胀量测定》.pdf
  • DIN 51742-2001 Testing of solid fuels - Determination of Hardgrove grindability index of hard coal《固体燃料试验 硬煤可磨指数的测定》.pdf DIN 51742-2001 Testing of solid fuels - Determination of Hardgrove grindability index of hard coal《固体燃料试验 硬煤可磨指数的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1