NAVY MIL-STD-1323-331-1986 UNIT LOAD FOR UNDERWAY REPLENISHMENT CHARGE PROPELLING 16 50 REDUCED IN 16 POWDER TANK MK 4& MODS AND MK 3 MOD 2 ON PALLET ADAPTER MK 87 MOD 0《16号推进充电航.pdf

上传人:explodesoak291 文档编号:982185 上传时间:2019-03-12 格式:PDF 页数:2 大小:93.75KB
下载 相关 举报
NAVY MIL-STD-1323-331-1986 UNIT LOAD FOR UNDERWAY REPLENISHMENT CHARGE PROPELLING 16  50 REDUCED IN 16  POWDER TANK MK 4& MODS AND MK 3 MOD 2 ON PALLET ADAPTER MK 87 MOD 0《16号推进充电航.pdf_第1页
第1页 / 共2页
NAVY MIL-STD-1323-331-1986 UNIT LOAD FOR UNDERWAY REPLENISHMENT CHARGE PROPELLING 16  50 REDUCED IN 16  POWDER TANK MK 4& MODS AND MK 3 MOD 2 ON PALLET ADAPTER MK 87 MOD 0《16号推进充电航.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、a a MIL-STD-L323 -333 83 9999933 O073634 T = s-37-a- MILITARY STANDARD MIL-STD-13 2 3 -3 31 UNIT LOAD (NAVY) FOR UNDERWAY REPLENISHMENT 20 IV,RCH 1986 CHARGE, PROPELLING, 16“/50, REDUCED IN 16“ POWDER TANK MK 4 dislribuliat-ir unlimilr CARLOADING f.IILITARY STANDARDS,. REFER TO INDEX TO STMDARDS, MI

2、L-HDBK-236 (NAVY) I ITZ-K THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING. “DLING STORAGE AND TRANSFER-AT-SEA. DOXSTIC,SHIi“T INZOMPLIANCE WITH DOT REGULATIONS IT MAY ALSO BE USED FOR REQUIREMENTS KR CONSTRUCTION OF MIS UNIT LOAD SHAU CONSIST OF THIS DOCUMENT AND THE LATEST ISSUE OF MIL-STD-1

3、323 (NAVY) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-3323 -331 2 U 7777713 0073b35 1 = MIL-STD-1323-331 PALLETIZING PROCEDURE (NAVY) (A) THREAD STRAPPING, ITEM 2, BETWEEN DECK WIRES OF PALLET, ITEM i, AS SHOWN IN DETAIL A. (B) CENTER BO

4、TTOM FRAME, ITEM 5, ON THE PALLET WITH EQUAL OVERHANG ON BOTH ENDS. (C) PLACE POWDER TANKS IN POSITION ON BOTTOM FRAME AND COVER THE UNIT LOAD WITH THE TOP FRAME, ITEM 6. POSITION STRAPPING, ITEM 2, AROUND THE UNIT LOAD, TENSION AND DOUBLE NOTCH SEAL, ITEM 4, POSITION STRAPPING, ITEM 3, UNDER THE PA

5、LLET DECK AND AROUND THE UNIT LOAD, TENSION AND DOUBLE NOTCH SEAL. (D) (E) MARK1 NG : IN ADDITION TO ANY SPECIAL MARKING REQUIRED BY CONTRACT OR ORDER, UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-1323. DEPALLETIZING PROCEDURE (A) CUT AND REMOVE STRAPPING, (B) REMOVE TOP FRAME. (C) REMOVE PO

6、WDER TANKS. (D ) REMOVE BOTTOP1 FMYE a v DETAIL A NOTES: 1, UNLESS OTHERrlISE SPECIFIED ALL I4ATERIALS SHALL DO NOT USE TYPE 1 STRAPPING WITH POWER MACHINES, BE IN ACCORDANCE WITH MIL-STD-1323. 2. A A 1 6 K!&O?OP%ANE 2642970 1 5 $kL&!OA%:# FRAME 2642969 r COI.1 L SEE NOTES SEE NOTES STRAPPING STRAPP

7、ING 1 1/4 1 1/4x,035xv FT I 1 U4X.035QO FT I 1 I PALLET MI( 3 MOD O I 564200 140 X 48 X 4 31, REQD 1 ITEM I DESCRIPTION IMATL/DWG IDIMENSION! I LIST OF MATERIALS REVIEW ACTIVITY NAVY-OS AGE 2 PREPARING ACT I VI TY NAVY -OS (PROJECT NO. 8140-N698) *IAS. GOVERNMENT PRINTING OFFICE B88 - 505.033-90681 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1