NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf

上传人:李朗 文档编号:983076 上传时间:2019-03-12 格式:PDF 页数:9 大小:278.81KB
下载 相关 举报
NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf_第1页
第1页 / 共9页
NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf_第2页
第2页 / 共9页
NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf_第3页
第3页 / 共9页
NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf_第4页
第4页 / 共9页
NAVY MIL-V-24619 (1)-1990 VALVE QUICK CLOSING FOR SATURATED STEAM SERVICE《快速关闭饱和蒸汽服务的阀》.pdf_第5页
第5页 / 共9页
点击查看更多>>
资源描述

1、MIL-V-24bLS (1) 48 7777906 0444682 W 1 INCH-POUND 1 MILV-24619(SH) AMENDMENT 1 17 August 1990 MILITARY SPECIFICATION VALVE, QUICK CLOSING, FOR SATURATED STEAM SERVICE This amendment forms a part of MILV-2419(SH), dated 12 September 1983, and is approved or use by the Naval Sea Systems Command, Depar

2、tment of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 Delete “MILSTD-1552 - Provisioning Technical Documentation, Uniform Department of Defense Requirements for“ and substitute: “MILSTD-1388-2 - DOD Requirements for a Logistic Support Analys

3、is Record.“ PAGE 8 - 3.3.10(a), line 1: Delete “Alinement“ and substitute “Alignment“. 3.3.13.1, line 1: Insert at beginning of paragraph: “Thread engapement“. 3.13.15: Add the following sentence: “The use of staking, set screws, and snap rings is prohibited.“ PAGE 9 3.3.17.2.1, line 1: Insert at be

4、ginning of paragraph: “Seat expansion seal ring.“ 3.3.17.2.2, line 1: Insert at beginning of paragraph: “Lapine; tool.“ Page 1 of 9 AMSC NIA FSC 4820 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted

5、 without license from IHS-,-,-MIL-V-24619( SH) AMENDMENT 1 PAGE 10 3.3.18.4.1.2, line 1: Insert at beginning of paragraph: “Location of iniurious imperfections.“ PAGE 11 3.3.19.1, line 1: Insert at beginning of paragraph: “Hvdraulic operating Pressures and temperature.“ PAGE 12 Add as new paragraph

6、3.3.19.6: “3.3.19.6 Hard pump. When specified (see 6.2.1), the valve shall be capable of being opened in one minute or less when hydraulic oil is supplied by a hand pump (supplied by others) with the following characteristics: Pump capacity - 1.5 in3/stroke; Time per stroke - 2 seconds.“ 3.3.20.2, l

7、ine 1: Insert at beginning of paragraph: “Normal opening time.“ 3.3.20.3, line 1: Insert at beginning of paragraph: “Maximum openine time.“ 3.3.20.4, line 1: Insert at beginning of paragraph: “Maximum steam flow.“ 3.3.20.5, line 1: Insert at beginning of paragraph: “Maximum pressure droD.“ PAGE 13 3

8、.3.20.6, line 1: Insert at beginning of paragraph: “Maximum design Pressure and temperature.“ 3.3.20.8, line 1: Insert at beginning of paragraph: “Opening - capability. Line 2: Delete Itdesignlt and substitute “differential“. PAGE 14 3.5, line 2: Delete “MIL-STD-1552“ and substitute “MIGSTD-1388-2“,

9、 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-24619 (1) 48 m 9999906 0444684 1 m MIL-V-24619(SH) AMENDMENT 1 Add as a new paragraph 3.5.1: “3.5.1 Tools. A recommendation of tools required to service the valve shall be made by the manufactu

10、rer, The manufacturer, whenever possible, will utilize tools listed in the federal supply catalog to perform and enable service on the supplied valve. Any tool, including lapping tools, required for servicing the supplied valve that is not listed in the federal supply catalog shall be supplied by th

11、e vendor.“ 3.6.1: Delete first sentence, (a) through (k), and substitute: “When specified in the contract or purchase order, drawings shall be prepared (see 6.2.2 and Appendix A).“ PAGE 15 3.6.1.1: Delete first and second sentences, (a) through (e), and substitute: “When specified in the contract or

12、 order, certification data shall be prepared (see 6.2.2 and Appendix B).“ 3.6.2 Delete. PAGE 17 4.3.2.2.1, line 5: Delete “critieria“ and substitute “criteria“. 4.3.22.2.1, line 1: Insert at beginning of paragraph: “Test duration.“ 4.3.2.2.2.2, line 1: Insert at beginning of paragraph: “Cvcline test

13、.“ 4.3.2.2.2.3, line 1: Insert at beginning of paragraph “Thermal test.“ 4.3.2.2.2.4, line 1: Insert at beginning of paragraph: “Seat tightness test.“ 4.3.2.3.1, line 1: Insert at beginning of paragraph: “Chattering test. 4.3.2.3.2, line 2: Delete “presure“ and substitute “pressure“. - PAGE 18 4.3.2

14、.4.1.1, line 1: Insert at beginning of paragraph: “Position of valves.“ 4.3.2.4.1.2, line 1: Insert at beginning of paragraph: “Post shock examination and test.“ 4.3.2.4.1.3, line 1: Insert at beginning of paragraph: “Shock test acceptance criteria.“ 3 Provided by IHSNot for ResaleNo reproduction or

15、 networking permitted without license from IHS-,-,-MILV-24619(SH) AMENDMENT 1 4.4.1.1, line 1: Insert at beginning of paragraph: “Verification of conformance with reauirements.“ 4.4.1.2, line 1: Insert at beginning of paragraph: “RadioeraDhic examination.“ 4.4.1.3, line 1: Insert at beginning of par

16、agraph: “Magnetic particle inspection.“ PAGE 19 4.4.1.4.1, line 1: Insert at beginning of paragraph: “End Dreparations 1 inch and lareer.“ 4,4.1.4.2, line 1: Insert at beginning of paragraph: “End preparations less than 1 inch.“ 4.4.1.4.3, line 1: Insert at beginning of paragraph: “Liauid uenetrant

17、insuection.“ PAGE 21 6.2.1: Add new line item (p): “(p) Hand pump (see 3.3.19.6).“ Revise the letters of the remaining line items accordingly. PAGE 22 6.2.2: Delete the following: “3.6 and 3.6.1 Drawings, engineering and associated lists 3.6 and 3.6.1.1 3.6 and 3.6.2 Manual, technical, preliminary 4

18、 DI-E-703 1 DI-M-2043 Level 3 Design activity designation- contractor Drawing no.- contractor Delivery of hard copies- contracting- activity Certification data sheets-required type 1“ MIL-M-15071, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V

19、-24bL7 (I) 48 W 77779Ob O444bb 5 W MIGV-24619(SH) AMENDMENT 1 Insert in its place the following: “3.6, 3.6.1 Engineering drawings DI-DRPR-80651 Level 3 and appendix A 3.6, 3.6.1.1 Cer ti fica tion da t a/repor t DI-MISC-80678“ and appendix B PAGE 23 Add new paragraph 6.2.2.4: “6.2.2.4 Technical manu

20、als. The requirement for technical manuals should be considered when this specification is applied on a contract. If technical manuals are required, military specifications and standards which have been cleared and listed in DOD 5010.12- L (AMSL) must be listed on a separate CDRL (DD Form 1423), inc

21、luded as an exhibit to the contract, The technical manuals must be acquired under separate contract line item in the contract. Technical content shall include the requirements of the Appendix C, title “Manual Technical Content Requirements.“ Add, as new pages, Appendix A, B, and C as follows: 5 Prov

22、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIGV-24619(SH) AMENDMENT 1 APPENDIX A ENGINEERING DRAWINGS TECHNICAL CONTENT REQ JIREMENTS 10. SCOPE 10.1 Scope. This appendix covers the technical requirements that should be included on drawings when requ

23、ired by the contract or order. This appendix is mandatory only when data item description DI-DRPR-80651 is cited on the DD Form 1423. 20. APPLICABLE DOCUMENTS 20,l Non-Government publications. The following documents form a part of this appendix to the extent specified herein. Unless otherwise speci

24、fied, the issues of the documents which are DOD adopted shall be those listed in the issue of the DODISS specified in the solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of documents cited in the solicitation. AMERICAN NATIONAL STANDARDS INST

25、ITUTE (ANSI) B46.1 Y14.5 Surface Texture (Surface Roughness, Waviness and Lay) Dimensioning and Tolerancing (DOD adopted) 3 -i4 (Applications for copies should be addressed to the American National Standards Institute, 1430 Broadway, New York, NY 1lS). (Non-Government standards and other publication

26、s are normally available from the organizations which prepare or which distribute the documents. These documents also may be available in or through libraries or other informational services.) 30, DRAWINGS 30.1 Drawings, Drawings shall contain the following additional information: (a) Accurately sca

27、led cross-sectional assembly which depicts the design and construction of the valve, including variation in design based on pipe size, identification of critical clearances aqd dry weight and center of gravity (see 3.3,7) (b) Bill of materials listing specification, grade, condition and any other da

28、ta required to identify the properties of the materials (c) Detail drawings of parts and subassemblies necessary for evaluation of the equipment and 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILv-24619(SH) AMENDMENT 1 parts necessary for main

29、tenance and overhaul of the valve. Details of these parts shall be so complete as to permit emergency manufacture by a Naval shipyard without assistance from the original manufacturer. Subassembly parts which cannot be acquired or serviced individually, shall be shown as a single part and so indicat

30、ed. Multidetail drawings are preferred, but monodetail drawings may be used. (d) Layout of the pressure-containing envelope (body and bonnet or cover) giving dimensions which control compression of the spiral-wound gaskets. This is to assure that where remachining is necessary to repair the sealing

31、surfaces on these parts, that compensating cuts can be accurately made to restore original gasket compression. This layout shall also specify the dimensional limits of corrective remachining with which the function of the valve remains unaffected. (e) Recommended torques or equivalent procedures for

32、 assembling joints and threaded assemblies (f) Tabulation of required gasket characteristics including all dimensions with tolerances and load versus compression characteristics with tolerances (g) Mark areas to be radiographic, magnetic particle, or dye penetrant inspected (h) Installation and main

33、tenance dimensions. Overall dimensions, accessibility space including disassembly clearances and all dimensions pertinent to installation. (i) Surface finishes. Show finish marks for all hard face surfaces and bearing areas. 0) Name of laboratory conducting shock and vibration tests, test report ide

34、ntification and the Navy approval letter, (k) Steam leakoff flow with the valve closed. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILV-24619( SH) AMENDMENT 1 APPENDIX B CERTIFICATION DATA/REPORT TECHNICAL CONTENT REQUIREMENTS 10, SCOPE 10.1 S

35、cope. This appendix covers the technical requirements that should be included in certification data sheets when required by the contract or order. This appendix is mandatory only when data item description DID-MISC-80678 is cited on the DD Form 1423. 20, APPLICABLE DOCUMENTS This section is not appl

36、icable to this appendix. 30, CERTIFICATION 30.1 Certification. When required by the contract or order, certification data sheets shall contain . the following information: (a) Type (b) Pressure and temperature rating (c) Body and bonnet material (d) Seat, disc, and stem material (e) Type of power ac

37、tuator. Shock and vibration tests of valve with the power actuator attached. 3 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILV-24619( SH) AMENDMENT 1 APPENDIX C MANUAL TECHNICAL CONTENT REQUIREMENTS 10, SCOPE 101 Scope. This appendix covers th

38、e technical requirements that should be included in the manuals when required by the contract or order. 20, APPLICABLE DOCUMENTS This section is not applicable to this appendix. 30, MANUALS 30.1 Manuals. When required by the contract or order, manuals shall contain the following information: (a) Dra

39、wings of the valve including certification data sheet. Drawings shall be supplemented by additional illustrations where necessary to adequately describe operation and maintenance. These additional illustrations may consist of exploded views, partial or full sections, and may eliminate extraneous lin

40、es and details to clarify the interaction of parts. HP v (b) Table listing wrench sizes and torque or other equivalent procedures for assembling joints and threaded parts. (c) Instructions to permit overhaul by shipyard or other repair facility. These should include procedures for checking critical

41、dimensions subject to wear or change and the acceptable dimensional limits and surface finish condition. Also, the appropriate procedures for part replacement, correction at repair facility, or repair at manufacturers facility which should be followed to correct each case of damage or wear. (d) Deta

42、iled disassembly and reassembly procedures. In addition to providing procedures for the complete disassembly and reassembly of the equipment, maintenance and troubleshooting sections shall contain, or refer to, only the limited disassembly and reassembly required to accomplish each particular operat

43、ion, This is intended to reduce the possibility of unnecessary disassembly and unnecessary disturbance of adjustments when performing specific or limited maintenance or troubleshooting operations. (e) Adjustment procedures. Preparing activity: (Project 4820-NO5) Navy - SH 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1