NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf

上传人:confusegate185 文档编号:983154 上传时间:2019-03-12 格式:PDF 页数:19 大小:826.65KB
下载 相关 举报
NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf_第1页
第1页 / 共19页
NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf_第2页
第2页 / 共19页
NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf_第3页
第3页 / 共19页
NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf_第4页
第4页 / 共19页
NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、MILITARY SPECIFICATION VALVE, CHARGING This specification is approved for use by Naval Air Systems Command, Department af the Navy, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for the desig

2、n, manufacture, inspection and testing of charging valves. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documeqts of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL

3、BB-N-411 Nitrogen, Technical. Beneficial comments (recommendations, additione, deletions) and any pertinent data which may be of use in improving this document should be addressed to: neering Specifications and Standards Department (ESSD) Code 93, Lake- hurst, New Jersey 08733, by using the self-add

4、ressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. Commanding Officer, Naval Air Esgineering Center, Engi- FSC 4820 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 W

5、 99777Ob 0278377 O m MILITARY DOD-D-1000 MIL-B-22020 STAMIARDS MIL I TARY MIL-STD-109 MIL-STD-129 MIL-STD-130 MIL-STD-143 MIL-STD-794 MIL-STD-810 MIL-STD-831 MS 20813 DRAWINGS Drawings, Engineering and Associated Lists. Bag, Transparent, Flexible, Sealable, Volatile Corrosion Inhibitor, Treated. Qua

6、lity Assurance Terms and Definitions. Marking for Shipment and Storage. I) Identification Marking of U.S. Military Property. Specifications and Standards, Order of Precedence for Parts and Equipment, Procedures for Packaging and Environmental Test Methods. Test Reports, Preparation of. Cap, High Pre

7、ssure Air Valve. the Selection of. Packing of. NAVAL AIR SYSTEMS COMMAND (Code Ident 30003) DL 58A164D556 Receiver Assemb,ly, Nitragen. (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from t

8、he procuring activity or as directed by the contracting officer . ) 3. REQUIREMENTS 3. i First article. When specified (see 6.2.1) , the contractor shall fur- nish sample unit(s) for first article inspection and approval (see 4.4 and 6.4). 3.1.1 First article sample. Unless otherwise specified in th

9、e contract or purchase order (see 6.2.1), a first article sample of the charging valve shall be delivered to-the testing activity designated in the contract or purchase order (see 6.2.1). same methods, materials, processes, and procedures proposed for production. Any production prior to acceptance o

10、f the first article sample is at the con- tractors risk. The first article sample shall be manufactured using the 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 m 7779706 0278378 2 W MIL-V-85033A(AS) 3.2 Selection and quality verif

11、ication of parts and materials. Quality verified parts (see 3.2.1) and materials from approved sources (see 3.2.2) shall be used in the fabrication of the end item. The contractor shall prepare reports of confokmance to applicable requirements. a 3.2.1 Approval of parts and materials. Parts and mate

12、rials proposed for use in the fabrication of the end item that are not specified in detail herein or in applicable referenced documents shall be selected from other documents in the order of precedence specified in MIL-STD-143 and shall be approved by the procuring activity prior to use. (vendor) ap

13、proval and verification of part quality by test. - I Approval shall be predicated upon source 3.2.2 Source approval. The contractor shall be responsible for ascertain- ing that each proposed source for parts and materials maintains a quality control program to ensure consistent delivery of products

14、conforming to appli- cable requirements. When parts or materials are fabricated by the contractor, the area used for that purpose shall be considered the same as an outside vendor insofar as source approval is concerned. Source approvals by the contractor shall be subject to concurrence by the procu

15、ring activity. Source approval will be granted by the procuring activity upon preparation of accept- able evidence of any of the following: a. Formal on-site survey of the vendors manufacturing facilities. b. The source has been previously approved, and evidence is avail- able to confirm that accept

16、able product quality has been main- tained. a c. Other evidence of acceptable product quality is available. 3.2.3 Verification of part quality. Quality verification shall be demon- strated by successful testing of the part to levels of environmental, elec- trical, and physical stresses equal to or g

17、reater than those which will be encountered in the system and as required by the part specification. Part quality may be demonstrated by any of the following: a. When the part is manufactured and qualified to a military specification which includes requirements equal to or more severe than those of

18、the end item application. a. 3 .7. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b. When the part is manufactured and qualified to a military speci- fication not including all requirements of the application, and additional tests for such requireme

19、nts have been performed. c. When the part is not qualified to a military specification, but all tests appropriate to the application have been performed. 3.2.4 Approved sourcelquality verified parts list (AS/QVPL). An AS/QVPL shall be prepared by the contractor for all subassemblies and parts for ap

20、- proval by the procuring activity. All entries on the AS/QVPL shall be fully substantiated by the preparation of data to satisfy the requirements of source approval and part test approval as specified herein. Reports of all quality verification testing shall conform to the requirements of MIL-STD-8

21、31. contractor may solicit from the procuring activity information as to the status of quality verified parts and approved sources which may have been previously developed. ports are required in those instances where vendors are selected from current AS/QVPLs of other programs. Entries on the AS/QVP

22、L shall identify the vendor and the product which is proposed or use in the charging valves by the con- tractor. In the event several sources have previously been approved for the application, the contractor shall specify the source of the parts to be used, Each item listed shall be supported in acc

23、ordance with the provisions of this section. tion or other Government Qualified Parts Listing. The Neither part environmental tests nor part environmental test re- This listing does not supplant or modify the applicable documenta- 3.2.4.1 Conditions governing the quality verification of parts. When

24、the contractor proposes to demonstrate the quality verification of parts, as provided herein, the following provisions shall apply: a. Test may be performed by the contractor, utilizing his own facilities, the facility of the manufacturer of the part or by any other suitable facility selected by the

25、 contractor. In any event, the facilities shall be approved by the con- tractor prior to the performance of any test. This information shall be prepared for.approva1 by the procuring activity. b. Prior to the performance of any test, a detailed test proce- dure shall be prepared by the contractor an

26、d approved by the procuring activity. The procedure shall identify, as a minimum, the step by step functions to be performed and the test equipment to be used, and shall provide for full con- .formance with the provisions of the applicable documentation. The Government reserves the right to review a

27、ny of the indi- vidual test ,procedures at its discretion. c. Quality verification testing may be monitored by a representa- tive of the procuring activity. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 7777906 0278400 7 3.2.4.2 Cha

28、nges to the AS/QVPL. The contractor may develop alternative sources for any part, subject to the provisions herein. Proposals by the contractor for part substitution or changes to the AS/QVPL shall include proof that the proposed substitute part will meet the requirements of 3.2.2 and 3.2.3. The AS/

29、QVPL shall be revised and updated as applicable to include approved changes. -3.2.4.3 Removal from the AS/QVPL. Evidence of poor quality may be cause for suspension or removal of a source from the AG/QVPL at the option of the contractor or the procuring activity. The contractor shall develop quality

30、 verified sources for those parts for which the approved source has been re- moved. Quality reverification shall be required under any of the following conditions unless otherwise directed by the procuring activity: a. When the part has been modified by a change in design, mate- rials, manufacturing

31、 process, manufacturing inspection pro- cedures, or manufacturing facilities. The procuring activity shall be notified prior to delivery of any parts incorporating any such changes and be provided quantitative evidence of the effect of such changes on the performance or other character- istics of th

32、e charging valve. b. When there is evidence that the quality of the part has not been maintained. This evidence may be in the form of accumu- lated failure reports which indicated that the quality of the part has deteriorated, or there is a failure trend. c. When the manufacturer has not produced th

33、e item for 6 or more months. 3.2.5 Part conformance provisions. When a drawing or specification for a part invokes by reference the provisions of a military specification, total conformance to the provisions of the referenced specification shall be re- quired. Total conformance is defined as conform

34、ance to the stated performance and product characteristics, and cornpliance with all quality assurance provi- sions, including qualification, quality verification, and quality conformance testing. 3.3 Design and construction. The design and construction of the charging valves shall be in accordance

35、with the applicable drawings listed on DL 58A164D556 and as specified herein. activity of any changes in design and construction after the charging valve has been acqep6-d by the procuring activity. The contractor shall notify the procuring A, 3.3.1 Mater4.8 Burst pressure. The charging valve shall

36、operate satisfactorily after being subjected to a burst pressure test wherein the outlet port shall be hydrostatically pressurized to 6700 +lo0 psig for three (3) minutes with no evidence of permanent deformation. 3.5 Precedence. The selection 0.f specifications and standards for use in the design a

37、nd development shall be inaccordance with the requirements of 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A(AS) MIL-STD-143. When the requirements, this specification, and referenced docu- ments are in conflict, the following precede

38、nce shall apply: a. This specification. This specification shall have precedence over all referenced documents. b. Referenced documents. Any documents referenced in this specifi- cation shall have.precedence over all subsidiary documents ref- conditions specified herein. Particular attention shall b

39、e paid to neatness and thoroughness of assembly, marking of parts and assembly, plating, paint- ing, machining, welding, brazing and freedom of parts from burrs and sharp edges. The standards of workmanship exhibited ia the approved first article sample, subject to any qualification stated in the Go

40、vernments notice of approval, shall determine the requirements of the remainder of the contract relative to workmanship. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otberwise specified in the con- tract, the contractor is responsible for the performance of all inspectio

41、n re- quirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the per- formance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perfo

42、rm any of the in- spections set forth in the specification where such inspections are deemed nec- ments. 4.2 Classification of inspection. The inspection of the charging valves shall be classified as follows: a, b. First article inspection (see 4.4). Quality conformance inspection (see 4.5). 4.3 Ins

43、pection conditions. Unless otherwise specified herein, all inspec- tions shall be performed under the following conditions and tolerances. a. Room temperature. Room ambient of 25 +lOC (77 k18OF) indicated. b. Test temperature, All parts of the test item shall be stabilized at the specified temperatu

44、re f2.8OC (k5OF) indicated prior to conducting any operational tests. Unless otherwise Specified 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 m 7777706 0278LiOLi Li m herein, temperature stabilization will have been attained when

45、 the indicated temperature of the surface of the largest mass of the test item does not change more than +2.8OC (+5OF) in a period of one hour. c. Humidity. Room ambient to 95 percent relative humidity. d. Altitude. Unless otherwise specified herein, testing shall be per- formed at normal ground ele

46、vation. e. Test gas. The test gas shall be nitrogen in accordance with BB-N- 411, Type I, Class I, Grade A. f. Test fixture. A high-strength, corrosion-resistant fixture shall be utilized for mating with the charging valve outlet port. The fixture shall have a charging valve port in accordance with

47、DL 58A164D556 and an open port for gas transfer. The charging valve shall be torqued to the fixture. The test fixture shall be used for all tests of 4.6.3, 4.6.4, 4.6.5 and 4.6.6. g. Torque requirements. The installation torque for the charging valve to the receiver assembly or test fixture shall be

48、 275 k25 inch-pounds. The closing torque shall be applied clockwise at 50 25 inch-pounds. h. Volume and flow. When required, all volume and flow measurements shall be corrected to normal temperature and barometric pressure (NPT) conditions. NPT conditions are 760 millimeters (29.92 inches) of mercur

49、y and 21.1OC (70OF). 4.4 First article inspection. First article inspection shall consist of the tests outlined in Table I. The procuring activity reserves the right to delete tests and alter the test sequence of Table I (see 6.2.1). approval is valid only on the contract or purchase order under which it is granted, unless extended by the Government to other contracts or purchase orders. First article 4.4.1 Charging valve samples. First article charging valve

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1