NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf

上传人:王申宇 文档编号:984809 上传时间:2019-03-12 格式:PDF 页数:22 大小:71.39KB
下载 相关 举报
NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf_第1页
第1页 / 共22页
NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf_第2页
第2页 / 共22页
NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf_第3页
第3页 / 共22页
NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf_第4页
第4页 / 共22页
NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf_第5页
第5页 / 共22页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 64 00 (August 2009)-Preparing Activity: NAVFAC Superseding UFGS-23 64 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL July 2009*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONINGSECTIO

2、N 23 64 00PACKAGED WATER CHILLERS, ABSORPTION TYPE08/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SAFETY REQUIREMENTS1.4 DELIVERY, STORAGE, AND HANDLING1.5 PROJECT REQUIREMENTS1.5.1 Verification of Dimensions1.5.2 Drawings1.6 WarrantyPART 2 PRODUCTS2.1 STANDARD COMMERCIAL PRODUCTS2.2 NAMEPLATES2.

3、3 ELECTRICAL WORK2.4 CHILLER COMPONENTS2.4.1 Tools2.5 ABSORPTION WATER CHILLER2.5.1 General2.5.2 Assembly2.5.3 Operation2.5.4 Components2.5.4.1 Absorber, Evaporator, Condenser Std 15 Errata 2007, 2009, Std 34 Errata 2007, 2008, Addenda a-y, aa-ae) ANSI/ASHRAE Standard 15-Safety Standard for Refriger

4、ation Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of RefrigerantsAMERICAN WELDING SOCIETY (AWS)AWS Z49.1 (2005) Safety in Welding, Cutting and Allied ProcessesASME INTERNATIONAL (ASME)ASME BPVC SEC VIII D1 (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VI

5、II, Pressure Vessels Division 1 - Basic CoverageASTM INTERNATIONAL (ASTM)ASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile StrengthASTM B 395/B 395M (2008) Standard Specification for U-Bend Seamless Copper and Copper Alloy Heat Exchanger and Condenser Tub

6、esASTM E 84 (2009a) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM F 104 (2003) Standard Classification System for Nonmetallic Gasket MaterialsNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (2007; Errata 2008) Standard for Motors SECTION 23 64 00 Pa

7、ge 4Provided by IHSNot for Resale-,-,-and GeneratorsNEMA MG 11 (1977; R 2007) Energy Management Guide for Selection and Use of Single Phase MotorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 54 (2008) National Fuel Gas Code1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Sect

8、ion 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submi

9、ttals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government

10、 approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Enginee

11、ring Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or ch

12、oose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office

13、 that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsDrawings; G; G, _Drawings provided in adequate detail to demonstrate compliance with contract requirements, as specified.SECTION 23 64 00 P

14、age 5Provided by IHSNot for Resale-,-,-SD-03 Product DataAbsorption Water Chiller; G; G, _Manufacturers standard catalog data, prior to the purchase or installation of a particular component, highlighted to show material, size, options, performance charts and curves, etc. in adequate detail to demon

15、strate compliance with contract requirements. Data shall include manufacturers recommended installation instructions and procedures. Data shall be adequate to demonstrate compliance with contract requirements as specified within the paragraphs:a. Packaged Water Chiller, Absorption Typeb. Chiller Com

16、ponentsc. AccessoriesIf vibration isolation is specified for a unit, vibration isolator literature shall be included containing catalog cuts and certification that the isolation characteristics of the isolators provided meet the manufacturers recommendations.*NOTE: Choose this bracketed section for

17、Army projects only.*Posted Instructions; G; G, _Posted instructions including equipment layout, wiring and control diagrams, piping, valves and control sequences, and typed condensed operation instructions. The condensed operation instructions shall include preventative maintenance procedures, metho

18、ds of checking the system for normal and safe operation, and procedures for safely starting and stopping the system. The posted instructions shall be framed under glass or laminated plastic and be posted where indicated by the Contracting Officer.Verification of Dimensions; G; G, _A letter including

19、 the date the site was visited, conformation of existing conditions, and any discrepancies found.System Performance Tests; G; G, _A schedule, at least 2 _ weeks prior to the start of related testing, for the system performance tests. The schedules shall identify the proposed date, time, and location

20、 for each test.DemonstrationsA schedule, at least 2 _ weeks prior to the date of the proposed training course, which identifies the date, time, and location for the training.Absorption water chiller - field acceptance test planSECTION 23 64 00 Page 6Provided by IHSNot for Resale-,-,-SD-06 Test Repor

21、tsField Acceptance Testing; G; G, _Absorption water chiller - field acceptance test report; G; G, _System Performance Tests; G; G, _SD-07 CertificatesAbsorption Water Chiller; G; G, _Where the system, components, or equipment are specified to comply with requirements of AGA, NFPA, ARI, ASHRAE, ASME,

22、 or UL, proof of such compliance shall be provided. The label or listing of the specified agency shall be acceptable evidence. In lieu of the label or listing, a written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that the items

23、 have been tested and conform to the requirements and testing methods of the specified agency may be submitted. When performance requirements of this projects drawings and specifications vary from standard ARI rating conditions, computer printouts, catalog, or other application data certified by ARI

24、 or a nationally recognized laboratory as described above shall be included. If ARI does not have a current certification program that encompasses such application data, the manufacturer may self certify that his application data complies with project performance requirements in accordance with the

25、specified test standards.SD-08 Manufacturers InstructionsWater chiller - installation instructions; G; G, _SD-10 Operation and Maintenance DataOperation and Maintenance Manuals1.3 SAFETY REQUIREMENTSExposed moving parts, parts that produce high operating temperature, parts which may be electrically

26、energized, and parts that may be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices shall be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements shall be in acc

27、ordance with AWS Z49.1. Fuel-fired equipment shall be in accordance with NFPA 54.1.4 DELIVERY, STORAGE, AND HANDLINGStored items shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and

28、during installation shall be the Contractors responsibility. Any materials found to be damaged shall be replaced at the Contractors expense. During installation, piping and similar openings shall be capped to keep out dirt and other foreign matter.SECTION 23 64 00 Page 7Provided by IHSNot for Resale

29、No reproduction or networking permitted without license from IHS1.5 PROJECT REQUIREMENTS1.5.1 Verification of DimensionsThe Contractor shall become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any w

30、ork.1.5.2 DrawingsBecause of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. The Contractor shall carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work

31、to be performed and shall arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions. The Contractor shall submit detailed drawings consisting of:a. Equipment layouts which identify assembly and installation details.b. Plans and elevations which ide

32、ntify clearances required for maintenance and operation.c. Wiring diagrams which identify each component individually and all interconnected or interlocked relationships between components.d. Foundation drawings, bolt-setting information, and foundation bolts prior to concrete foundation constructio

33、n for all equipment indicated or required to have concrete foundations.e. Details, if piping and equipment are to be supported other than as indicated, which include loadings and type of frames, brackets, stanchions, or other supports.*NOTE: Warranties on Navy construction: Warranties for equipment,

34、 materials, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier, has a duration of one year from the date of final acceptance of the work. An exception is in normal commercial practice longer warranty period for particular construction are given.An exampl

35、e of a typically longer duration period is the warranty for the chiller refrigeration compressor, is typically good for five years. The Contractor submits to the Contracting Officer all applicable warranties signed and official prior to project closeout.If a longer than one year warranty duration is

36、 desired, it is recommended that the specifier/designer survey the chiller market to determine if the chiller industry normally provides a longer warranty for all of the subject chiller or for any major components.SECTION 23 64 00 Page 8Provided by IHSNot for Resale-,-,-A warranty duration of longer

37、 than a year, and not covered normally by the industry, requires a Level III Contracting Officers written determination documenting that the extra warranty protection is needed.*1.6 WarrantyIn addition to the warranty requirements specification in Division 00, Contract Requirements, the following ma

38、jor components of the chiller shall be covered by a warranty of a duration period of five years: solution pump, heat exchanger, burner, and _.PART 2 PRODUCTS*Minimum chiller efficiencies will either be presented in this specification or on the design drawings. Delete chiller efficiencies in the spec

39、ification if efficiencies are shown on the drawings. If the efficiencies are shown on the drawings, reference the applicable ARI standard.The following is a list of terms which are commonly used in regard to efficiency ratings of equipment defined within this specification.COP - Coefficient of Perfo

40、rmance (dimensionless)EER - Energy Efficiency Ratio (Btuh/Watt)IPLV - Integrated Part Load Value(dimensionless or kW/ton)NPLV - Non-Standard Part Load Value(dimensionless or kW/ton)Note that the IPLV ratings presented by manufacturers are based upon standard rating conditions established by ARI. NPL

41、V ratings on the other hand are based upon site specific rating conditions. NPLV ratings should be specified in most applications. NPLV ratings will be coordinated with ARI and with the chiller manufacturers.Minimum efficiency ratings for absorption chillers are defined under paragraph ABSORPTION LI

42、QUID CHILLER.*2.1 STANDARD COMMERCIAL PRODUCTSMaterials and equipment shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products shall have been in satisfactory commercial or ind

43、ustrial use for 2 years prior to bid opening. The 2 year use shall include applications of equipment and materials under similar circumstances and of similar size. The 2 years experience shall be satisfactorily completed by a product which has been sold or is offered for sale on the commercial marke

44、t through advertisements, manufacturers catalogs, or brochures. Products having less than a 2 year field service record shall be acceptable if a certified SECTION 23 64 00 Page 9Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHSrecord of satisfactory field

45、operation, for not less than 6000 hours exclusive of the manufacturers factory tests, can be shown. System components shall be environmentally suitable for the indicated locations.2.2 NAMEPLATES*NOTE: In a salt water environment, substitute acceptable non-corroding metal such as but not limited to nickel-copper, 304 stainless steel, or monel. Aluminum is unacceptable. Nomenclature (or system identification) should be established by the designer.*Major equipment including chillers, water coolers, heat exchanges, and motors shall have the manufacturers name, address, type or s

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1