1、Lessons Learned Entry: 0286Lesson Info:a71 Lesson Number: 0286a71 Lesson Date: 1993-07-13a71 Submitting Organization: JPLa71 Submitted by: P. W. SchaperSubject: Galileo NIMS Cooler Cover Ejection Anomaly Abstract: Contrary to design assumptions and the original flight plan, a decision was made to en

2、ergize the Galileo Near Infrared Mapping Spectrometer (NIMS) cover heater prior to ejecting the covers. The cover failed to deploy until the heater was switched off.The lesson offers recommendations that would deter untested flight sequences and incomplete reviews of mission operations flight rules.

3、 Description of Driving Event: At launch, the Near Infrared Mapping Spectrometer (NIMS) on the Galileo spacecraft had two covers in place to protect the instrument from contamination. Two and a half months after launch, when contamination was deemed to be negligible, an attempt was made to eject the

4、 covers. The “cooler cover“ failed to eject, as determined by not receiving expected temperature changes. Analysis of the data revealed that the temperature of the cooler shield was 38 degrees C., due to the shield heater being energized. This resulted in a temperature differential between the cover

5、 and the shield that caused a mechanical distortion sufficient to prevent the cover from ejecting. All ejection tests before launch were conducted with the shield heater unenergized, which was the original in-flight plan. Because of a concern for contamination caused by spacecraft outgassing, a flig

6、ht rule was modified prior to launch requiring the shield heater to be energized before cover deployment. The flight rule was in error by not requiring the shield heater to be off sometime prior to cover deployment. The shield heater was commanded off and twenty-two minutes later the “cooler cover“

7、ejected properly, as shown by the instrument temperature telemetry. Had the “cooler cover“ not ejected, the NIMS experiment would have been considered a failure.Additional Keyword(s): Testing, Mechanical DevicesProvided by IHSNot for ResaleNo reproduction or networking permitted without license from

8、 IHS-,-,-Reference(s):PFR #52603Review Board Report, IOM 340-90-030-JLSLesson(s) Learned: 1. Untested flight sequences frequently result in unexpected events.2. Incomplete reviews of mission operations flight rules can cause problems.3. Problems are created due to the loss of information in the tran

9、sfer of responsibility from design to operations.Recommendation(s): 1. All primary and backup spacecraft flight configurations should be tested or analyzed before launch, including the most probable failure-mode configurations.2. Subsystem constraints that impose system constraints should be evaluat

10、ed at system design reviews for their system impacts and their possible elimination.3. The flight rules generation cycle should be initiated early in the mission operations design, and emphasis should be placed on their review, including additions or revisions thereto, by all essential personnel (su

11、ch as design cognizant engineers).4. Reviews of critical spacecraft operations should be initiated early in the design cycle and should include design specialists. For long duration missions, re-review before initiation of critical operations is highly desirable.Evidence of Recurrence Control Effect

12、iveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Flight Equipmenta71 Test & VerificationProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 1990-11-08a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 50382-1-2009 Railway applications - Railway rolling stock high temperature power cables having special fire performance - Part 1 General requirements German version EN 50382.pdf DIN EN 50382-1-2009 Railway applications - Railway rolling stock high temperature power cables having special fire performance - Part 1 General requirements German version EN 50382.pdf
  • DIN EN 50382-2-2009 Railway applications - Railway rolling stock high temperature power cables having special fire performance - Part 2 Single core silicone rubber insulated cables.pdf DIN EN 50382-2-2009 Railway applications - Railway rolling stock high temperature power cables having special fire performance - Part 2 Single core silicone rubber insulated cables.pdf
  • DIN EN 50383-2011 Basic standard for the calculation and measurement of electromagnetic field strength and SAR related to human exposure from radio base stations and fixed terminal .pdf DIN EN 50383-2011 Basic standard for the calculation and measurement of electromagnetic field strength and SAR related to human exposure from radio base stations and fixed terminal .pdf
  • DIN EN 50386 A1-2014 Bushings up to 1 kV and from 250 A to 5 kA for liquid filled transformers German version EN 50386 2010 A1 2013《注液变压器用1 kV及以下和250 A至5 kA的套管 德文版本EN 50386-2010 A1.pdf DIN EN 50386 A1-2014 Bushings up to 1 kV and from 250 A to 5 kA for liquid filled transformers German version EN 50386 2010 A1 2013《注液变压器用1 kV及以下和250 A至5 kA的套管 德文版本EN 50386-2010 A1.pdf
  • DIN EN 50386-2011 Bushings up to 1 kV and from 250 A to 5 kA for liquid filled transformers German version EN 50386 2010《充液变压器用1 kV以下和250 A至5 kA的套管 德文版本EN 50386-2010》.pdf DIN EN 50386-2011 Bushings up to 1 kV and from 250 A to 5 kA for liquid filled transformers German version EN 50386 2010《充液变压器用1 kV以下和250 A至5 kA的套管 德文版本EN 50386-2010》.pdf
  • DIN EN 50387-2004 Busbar bushings up to 1 kV and from 1 25 kA to 5 kA for liquid filled transformers German version EN 50387 2002《液浸式变压器用1kV及以下且1 25 KA至5 kA的母线套管》.pdf DIN EN 50387-2004 Busbar bushings up to 1 kV and from 1 25 kA to 5 kA for liquid filled transformers German version EN 50387 2002《液浸式变压器用1kV及以下且1 25 KA至5 kA的母线套管》.pdf
  • DIN EN 50388-2012 Railway Applications - Power supply and rolling stock - Technical criteria for the coordination between power supply (substation) and rolling stock to achieve int.pdf DIN EN 50388-2012 Railway Applications - Power supply and rolling stock - Technical criteria for the coordination between power supply (substation) and rolling stock to achieve int.pdf
  • DIN EN 50390-2005 Space product assurance - The manual soldering of high-reliability electrical connections German version EN 50390 2004《空间产品保证 高可靠性电气连接件的手动钎焊》.pdf DIN EN 50390-2005 Space product assurance - The manual soldering of high-reliability electrical connections German version EN 50390 2004《空间产品保证 高可靠性电气连接件的手动钎焊》.pdf
  • DIN EN 50395 A1-2012 Electrical test methods for low voltage energy cables German version EN 50395 2005 A1 2011《低压电缆的电气试验方法》.pdf DIN EN 50395 A1-2012 Electrical test methods for low voltage energy cables German version EN 50395 2005 A1 2011《低压电缆的电气试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1