REG NASA-LLIS-1347-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations - System Components Re-Use.pdf

上传人:figureissue185 文档编号:1018986 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.37KB
下载 相关 举报
REG NASA-LLIS-1347-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations - System Components Re-Use.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1347-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations - System Components Re-Use.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1347Lesson Info:a71 Lesson Number: 1347a71 Lesson Date: 2003-07-15a71 Submitting Organization: GSFCa71 Submitted by: Mathew SchwallerSubject: ADEOS-II NASA Ground Network (NGN) Development and Early Operations - System Components Re-Use Description of Driving Event: Most of th

2、e components that comprise the NASA Ground Network that supports the ADEOS-II mission were provided to the NGN as contributions from operational entities under the management of various NASA organizations. This approach presented both opportunities and challenges during the ADEOS-II NGN development

3、and early operations. The one lesson learned in this regard with respect to component re-use is summarized below. It should be noted that ADEOS-II is a international partner mission, with the Japanese Space Agency (NASDA) as the mission lead. NASA provided NGN ground system support through an MOU wi

4、th NASDA.Lesson(s) Learned: Re-Use of Existing Operational Components Lowers Cost and Reduces Risk. These are two of the obvious benefits gained by using operational components in the development and early operations of the NGN. The NGN was able to leverage the considerable investment by NASA in the

5、 multi-mission capabilities of the Alaska Synthetic Aperture Radar Faility, the Wallops Flight Facility, CSOCs Data Services Management Center, the EOSDIS Mission Support Network, the Physical Oceanography Distributed Active Archive Center, and the National Snow and Ice Data Center. Collectively the

6、se organizations provided data capture and Level 0 processing, domestic and international network connectivity, and archive and distribution capabilities. It was determined early in the design concept phase that it would be prohibitively expensive to develop all of the capabilities needed for the AD

7、EOS-II NGN “from scratch.“ The re-use of existing management structures and systems was the obvious solution for a cost-effective solution to meet the requirements for NASAs support of ADEOS-II NGN requirements. During the design and early operations phase, all of the NGN component organizations pro

8、vided the highest caliber of support to the project and program goals. The success of the NGN in meeting its requirements for support of the ADEOS-II mission is a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-positive lesson learned about the benef

9、its of re-using and integrating operational components to meet ground system mission requirements.Recommendation(s): Re-Use Existing Operational Components. Recommendation: Re-use existing operational components (and leverage off of multi-mission capabilities) when developing ground systems for new

10、missions. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 ScienceAdditional Key Phrase(s): a71 Ground Equipmenta71 Ground Operationsa71 Information Technology/SystemsAdditional Info: Approval Info: a71 Approval Date: 2003-07-28a71 Approval Name: Al Galloa71 Approval Organization: GSFCa71 Approval Phone Number: 301-286-3756Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-