1、Lessons Learned Entry: 1854Lesson Info:a71 Lesson Number: 1854a71 Submitting Organization: KSCa71 Submitted by: Scott Estesa71 POC Name: Scott Estesa71 POC Email: Scott.Estes-1nasa.govSubject: KSC Checkout and Launch Control System (CLCS) - General Lessons Abstract: The CLCS project was initiated in
2、 FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe and dependable launch support for the Shuttle program. Per initial planning, CLCS was projected to reduce the costs for Shuttle operations at
3、 KSC, in addition to being an architecture in place that would support future planning and new program activities to occur at KSC. The CLCS project experienced many significant challenges even from the project startup (i.e., time and resources that included both funding and manpower).Description of
4、Driving Event: N/ALesson(s) Learned: N/ARecommendation(s): N/AEvidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: Click here to download document. Mission Directorate(s): N/AAd
5、ditional Key Phrase(s): a71 Additional Categories.Launch Processa71 Additional Categories.Launch Vehiclea71 Additional Categories.Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2008-05-12a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-