1、 TIA-102.CAEC December 2011Project 25 Conformance Profile Basic Trunked Operation NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of
2、 products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-member of TIA from manufacturing or selling products not conforming
3、to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA in accordance with the American National Standards Institute (ANSI
4、) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety problems associated with its use or all applicable regulatory requi
5、rements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No. TIA-PN-102.CAEC, formulated under the cognizance of the TIA TR-8 Mobile and Personal Priv
6、ate Radio TR-8.25 Subcommittee on Compliance Assessment). Published by TELECOMMUNICATIONS INDUSTRY ASSOCIATION Standards and Technology Department 2500 Wilson Boulevard Arlington, VA 22201 U.S.A. PRICE: Please refer to current Catalog of TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION STANDARDS AND ENGI
7、NEERING PUBLICATIONS or call IHS, USA and Canada (1-877-413-5187) International (303-397-2896) or search online at http:/www.tiaonline.org/standards/catalog/ All rights reserved Printed in U.S.A. NOTICE OF COPYRIGHT This document is copyrighted by the TIA. Reproduction of these documents either in h
8、ard copy or soft copy (including posting on the web) is prohibited without copyright permission. For copyright permission to reproduce portions of this document, please contact the TIA Standards Department or go to the TIA website (www.tiaonline.org) for details on how to request permission. Details
9、 are located at: http:/www.tiaonline.org/standards/catalog/info.cfm#copyright or Telecommunications Industry Association Technology (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended
10、, modified or changed in the standards development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigat
11、ion for IPR. When IPR consisting of patents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or
12、 inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory.
13、 TIA does not warrant or represent that procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the
14、 formulation, development or publication of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or
15、 obligation to search or investigate the records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent application
16、s shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document
17、. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS
18、, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING T
19、HE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTNTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISI
20、NG FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRAN
21、TY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA-102.CAEC i
22、 Foreword (This foreword is not part of this standard.) This document has been created in response to a request by the APCO/NASTD/FED Project 25 Steering Committee as provided for in a Memorandum of Understanding (MOU) dated April 1992 and amended December 1993. That MOU states APCO/NASTD/FED shall
23、devise a common system standard for digital public safety communications (the Standard) commonly referred to as Project 25 or P25, and that TIA, as agreed to by the membership of the appropriate TIA Engineering Committee, will provide technical assistance in the development of documentation for the
24、Standard. If the symbol “P25” or the wording “Project 25” appears on the cover sheet of this document when published that indicates the APCO/NASTD/FED Project 25 Steering Committee has adopted this document as part of the Standard. The appearance of the abbreviation “P25” or the wording “Project 25”
25、 on the cover sheet of this document or in the title of any document referenced herein should not be interpreted as limiting the applicability of the information contained in any document to “P25” or “Project 25” implementations exclusively. This document has been developed with inputs from the APIC
26、 Compliance Assessment Process and Procedures Task Group (CAPPTG) and the TIA Industry members. This document is being published to address the need for technical information on the emerging digital techniques for Land Mobile Radio Service. This document describes conformance profiles for basic trun
27、ked operation utilizing the Common Air Interface. The information herein is designed to insure conformance of radio units and other equipment in a repeatable manner. As other documents describing the conventional and trunking protocols are developed, this document is subject to change. All reasonabl
28、e efforts have been made to ensure the accuracy of the information herein, but it must be noted that the conformance tests inferred in this document have not yet been developed or proven. TIA-102.CAEC ii Table Of Contents 1 Introduction 1 2 Scope . 1 2.1 Definitions 2 2.2 Nomenclature . 2 2.3 Abbrev
29、iations . 2 2.4 References . 3 2.5 Revision History . 4 3 Overview 5 3.1 Coverage . 5 3.2 Procedures . 5 3.3 Conformance Test Pass/Fail Criteria . 6 3.4 Conformance Test Roles . 6 3.5 Conformance Test Environment . 7 4 Parameter Values 9 4.1 Overview 9 4.2 NAC . 9 4.3 Network (WACN) ID . 10 4.4 Syst
30、em ID. 10 4.5 RFSS ID . 10 4.6 LRA ID . 10 4.7 Site ID 10 4.8 Subscriber Unit ID (SUID) 10 TIA-102.CAEC iii 4.9 Working Unit ID (WUID) . 11 4.10 Subscriber Group ID (SGID) 11 4.11 Working Group ID (WGID) . 11 4.12 Announcement Group ID (AGID) . 12 4.13 Service Options 12 4.14 Encryption Parameters .
31、 12 5 Scope and Conventions of Signaling in Test Procedures 12 5.1 Overview 12 5.2 Reference Points and Equipment Under Test 13 5.3 Bandwidth and Modulation . 13 5.4 Frequencies and Channel Identifiers 13 5.5 Framesync . 14 5.6 Control Channel Signaling . 14 5.7 Voice Traffic Channel Signaling . 16
32、6 CP 1.1 - Unit Registration Request Procedure . 18 6.1 Background 18 6.2 Basic Procedure - Accept . 19 6.3 Alternative Procedure - Deny . 22 6.4 Alternative Procedure - Temporary Emergency Registration . 25 6.5 Alternative Procedure - Fail 28 6.6 Alternative Procedure - Refused 31 7 CP 1.2 - Group
33、Affiliation Procedure 34 7.1 Background 34 TIA-102.CAEC iv 7.2 Basic Procedure - Accept . 34 7.3 Alternative Procedure - Deny . 37 7.4 Alternative Procedure - Temporary Emergency Registration . 39 7.5 Alternative Procedure - Fail 42 7.6 Alternative Procedure - Refused 45 8 CP 1.3 - Location Update P
34、rocedure . 47 8.1 Background 47 8.2 Basic Procedure - Accept . 47 9 CP 2.1 - Unit to Group Call Setup Procedure . 50 9.1 Background 50 9.2 Basic Procedure . 51 9.3 Alternative Procedure - Explicit 55 9.4 Alternative Procedure - Denied 58 9.5 Alternative Procedure - Queued . 60 10 CP 2.2 - Group Call
35、 Termination Procedure 64 10.1 Background 64 10.2 Basic Procedure . 65 10.3 Alternative Procedure - Call Continuation Control Channel . 67 10.4 Alternative Procedure - Call Continuation Voice Channel 69 10.5 Alternative Procedure - FNE Maintains Emergency State 71 10.6 Alternative Procedure - SU Ini
36、tiated Emergency Cancel 74 11 CP 2.3 - Announcement Group Call Procedures . 77 12 CP 2.4 - Broadcast Group Call Procedures . 77 TIA-102.CAEC v 13 CP 2.5 - Emergency Group Call Procedures . 77 14 CP 2.6 - Encrypted Group Call Procedures . 77 15 CP 2.7 - Unit to Unit Call Availability Check Setup Proc
37、edure . 78 15.1 Background 78 15.2 Basic Procedure . 79 15.3 Alternative Procedure - Explicit Channel Grant 84 15.4 Alternative Procedure - Denied by FNE . 90 15.5 Alternative Procedure - Denied by Destination. 93 15.6 Alternative Procedure - Queued After Availability Check . 97 15.7 Alternative Pro
38、cedure - Queued Before Availability Check 103 16 CP 2.8 - Unit to Unit Call Direct Setup Procedure . 109 16.1 Background 109 16.2 Basic Procedure . 110 16.3 Alternative Procedure - Explicit Channel Grant 113 16.4 Alternative Procedure - Denied by FNE . 117 16.5 Alternative Procedure - Queued . 117 1
39、7 CP 2.9 - Unit to Unit Call Termination Procedure 120 17.1 Background 120 17.2 Basic Procedure - FNE Initiated . 121 17.3 Alternative Procedure - Call Continuation - Control Channel . 123 17.4 Alternative Procedure - Call Continuation - Voice Channel 126 18 CP 2.10 - Emergency Unit To Unit Call Pro
40、cedures 129 19 CP 3.1 - Emergency Alarm Procedure 129 TIA-102.CAEC vi 19.1 Background 129 19.2 Basic Procedure - Accept . 129 19.3 Alternative Procedure - Denied 132 19.4 Alternative Procedure - Cancel 134 TIA-102.CAEC vii List Of Tables Table 1: Trunking Conformance Test Roles 7 Table 2: Pre-condit
41、ions - Unit Registration - Accept 20 Table 3: Post-conditions - Unit Registration - Accept 20 Table 4: Pre-conditions - Unit Registration - Deny 23 Table 5: Pre-conditions - Unit Registration - Temporary Emergency Registration 26 Table 6: Post-conditions - Unit Registration - Temporary Emergency Reg
42、istration . 26 Table 7: Pre-conditions - Unit Registration - Fail . 29 Table 8: Post-Conditions - Unit Registration - Fail 29 Table 9: Pre-conditions - Unit Registration - Refused . 32 Table 10: Pre-conditions - Group Affiliation - Accept . 35 Table 11: Post-conditions - Group Affiliation - Accept .
43、 35 Table 12: Pre-conditions - Group Affiliation - Deny . 38 Table 13: Pre-conditions - Group Affiliation - Temporary Emergency Registration . 40 Table 14: Post-conditions - Group Affiliation - Temporary Emergency Registration 40 Table 15: Pre-conditions - Group Affiliation - Fail 43 Table 16: Post-
44、conditions - Group Affiliation - Fail 43 Table 17: Pre-conditions - Group Affiliation - Refused 45 Table 18: Pre-conditions - Location Update - Accept 48 Table 19: Post-conditions - Location Update - Accept 48 Table 20: Pre-conditions - Group Call Setup . 52 Table 21: Post-conditions - Group Call Se
45、tup . 52 Table 22: Pre-conditions - Group Call Setup - Explicit 55 TIA-102.CAEC viii Table 23: Post-conditions - Group Call Setup - Explicit . 56 Table 24: Pre-conditions - Group Call Setup - Denied 58 Table 25: Pre-conditions - Group Call Setup - Queued . 61 Table 26: Post-conditions - Group Call S
46、etup - Queued . 61 Table 27: Pre-conditions - Group Call Termination . 66 Table 28: Post-conditions - Group Call Termination 66 Table 29: Pre-conditions - Group Call Continuation - Control Channel . 68 Table 30: Post-conditions - Group Call Continuation - Control Channel 68 Table 31: Pre-conditions
47、- Group Call Continuation - Voice Channel 69 Table 32: Post-conditions - Group Call Continuation - Voice Channel 70 Table 33: Pre-conditions - Emergency Group Call Cont. - FNE Maintains State . 72 Table 34: Post-conditions - Emergency Group Call Cont. - FNE Maintains State . 72 Table 35: Pre-conditi
48、ons - Emergency Cancel 75 Table 36: Post-conditions - Emergency Cancel 75 Table 37: Pre-conditions - Unit to Unit Call Availability Check Setup 80 Table 38: Post-conditions - Unit to Unit Call Availability Check Setup 80 Table 39: Pre-conditions - Unit to Unit Call Availability Check Setup - Explici
49、t 85 Table 40: Post-conditions - Unit to Unit Call Availability Check Setup - Explicit 85 Table 41: Pre-conditions - Unit to Unit Call Availability Check - Denied by FNE . 91 Table 42: Pre-conditions - Unit to Unit Call Avail. Check - Denied by Destination 94 Table 43: Pre-conditions - Unit to Unit Call - Queued After Availability Check 98 Table 44: Post-conditions - Unit to Unit Call - Queued After Availability Check 99 Table 45: Pre-conditions - Unit to Unit Call - Queued Before Availability Check . 104 TIA-102.CAEC ix Table 46: Post-conditions - Unit to Unit Call - Queued Before Avai