TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf

上传人:孙刚 文档编号:1060282 上传时间:2019-03-31 格式:PDF 页数:256 大小:5.13MB
下载 相关 举报
TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf_第1页
第1页 / 共256页
TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf_第2页
第2页 / 共256页
TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf_第3页
第3页 / 共256页
TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf_第4页
第4页 / 共256页
TIA-2001 5-E-1-2010 Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 5 (A3 and A7 Inerfaces) (Addendum to TIA-2001 5-E).pdf_第5页
第5页 / 共256页
点击查看更多>>
资源描述

1、 TIA-2001.5-E-1 (Addendum to TIA-2001.5-E)January 2010 Interoperability Specification (IOS) forcdma2000Access Network Interfaces Part 5 (A3 and A7 Interfaces) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 NOTICE TIA Engineering Standards and Publi

2、cations are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular

3、 need. The existence of such Standards and Publications shall not in any respect preclude any member or non-member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary

4、use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation wh

5、atever to parties adopting the Standard or Publication. This Standard does not purport to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to d

6、etermine the applicability of regulatory limitations before its use. (From Project No. PN-3-4545.5-RV5-AD1, formulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form;

7、 (c) the Document may be amended, modified or changed in the standards development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. T

8、IA makes no search or investigation for IPR. When IPR consisting of patents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims

9、any obligation to investigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are r

10、easonable or non-discriminatory. TIA does not warrant or represent that procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organizat

11、ion (“other SSO”) engaged in the formulation, development or publication of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4th edition) t

12、hen (i) TIA disclaims any duty or obligation to search or investigate the records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and pub

13、lished pending patent applications shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance

14、with the contents of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCER

15、NING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESEN

16、TATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL

17、DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BR

18、EACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOU

19、T SUCH LIMITATIONS.TIA-2001.5-E-1 Table of Contents 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 1.0 Introduction 1 1.1 Overview 1 1.1.1 Purpose . 1 1.1.2 Scope 1 1.2 References 1 1.2.1 Nor

20、mative References 1 1.2.2 Informative References. 2 1.3 Terminology . 2 1.3.1 Acronyms 2 1.3.2 Definitions 4 1.4 Message Body, Coding, and Ordering of Elements 4 1.5 Forward Compatibility Guidelines . 6 1.6 Message Processing Guidelines 7 1.7 Message Definition Guidelines. 8 2.0 Message Procedures .

21、 9 2.1 A3 Messages Procedures 9 2.1.1 A3-Connect. 9 2.1.1.1 Successful Operation 9 2.1.1.2 Failure Operation 9 2.1.2 A3-Connect Ack . 10 2.1.2.1 Successful Operation 10 2.1.2.2 Failure Operation 10 2.1.3 A3-Remove. 10 2.1.3.1 Successful Operation 10 2.1.3.2 Failure Operation 10 2.1.4 A3-Remove Ack .

22、10 2.1.4.1 Successful Operation 10 2.1.4.2 Failure Operation 11 2.1.5 A3-Drop 11 2.1.5.1 Successful Operation 11 2.1.5.2 Failure Operation 11 2.1.6 A3-Propagation Delay Measurement Report 11 2.1.6.1 Successful Operation 11 2.1.6.2 Failure Operation 11 2.1.7 A3-Physical Transition Directive . 11 2.1.

23、7.1 Successful Operation 11 2.1.7.2 Failure Operation 12 2.1.8 A3-Physical Transition Directive Ack 12 2.1.8.1 Successful Operation 12 2.1.8.2 Failure Operation 12 2.1.9 A3-Traffic Channel Status 12 2.1.9.1 Successful Operation 12 2.1.9.2 Failure Operation 13 2.1.10 A3-IS-95 FCH Forward 13 2.1.10.1

24、Successful Operation 13 2.1.10.2 Failure Operation 13 2.1.11 A3-IS-95 FCH Reverse. 13 2.1.11.1 Successful Operation 13 2.1.11.2 Failure Operation 14 2.1.12 A3-IS-2000 FCH Forward 14 2.1.12.1 Successful Operation 14 2.1.12.2 Failure Operation 14 2.1.13 A3-IS-2000 FCH Reverse. 15 i TIA-2001.5-E-1 2.1.

25、13.1 Successful Operation 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 2.1.13.2 Failure Operation 15 2.1.14 A3-IS-2000 DCCH Forward. 15 2.1.14.1 Successful Operation 15 2.1.14.2 Failu

26、re Operation 16 2.1.15 A3-IS-2000 DCCH Reverse . 16 2.1.15.1 Successful Operation 16 2.1.15.2 Failure Operation 16 2.1.16 A3-IS-2000 SCH Forward 17 2.1.16.1 Successful Operation 17 2.1.16.2 Failure Operation 17 2.1.17 A3-IS-2000 SCH Reverse. 17 2.1.17.1 Successful Operation 17 2.1.17.2 Failure Opera

27、tion 18 2.1.18 A3-FCH Forward Traffic Frame. 18 2.1.18.1 Successful Operation 18 2.1.18.2 Failure Operation 18 2.1.19 A3-FCH Reverse Traffic Frame . 19 2.1.19.1 Successful Operation 19 2.1.19.2 Failure Operation 19 2.1.20 A3-DCCH Forward Traffic Frame . 19 2.1.20.1 Successful Operation 19 2.1.20.2 F

28、ailure Operation 20 2.1.21 A3-DCCH Reverse Traffic Frame 20 2.1.21.1 Successful Operation 20 2.1.21.2 Failure Operation 21 2.1.22 A3-SCH Reverse Traffic Frame . 21 2.1.22.1 Successful Operation 21 2.1.22.2 Failure Operation 21 2.2 A7 Messages. 21 2.2.1 A7-Handoff Request. 22 2.2.1.1 Successful Opera

29、tion 22 2.2.1.2 Failure Operation 22 2.2.2 A7-Handoff Request Ack . 22 2.2.2.1 Successful Operation 22 2.2.2.2 Failure Operation 22 2.2.3 A7-Drop Target 22 2.2.3.1 Successful Operation 22 2.2.3.2 Failure Operation 23 2.2.4 A7-Drop Target Ack. 23 2.2.4.1 Successful Operation 23 2.2.4.2 Failure Operat

30、ion 23 2.2.5 A7-Target Removal Request 23 2.2.5.1 Successful Operation 23 2.2.5.2 Failure Operation 23 2.2.6 A7-Target Removal Response 23 2.2.6.1 Successful Operation 24 2.2.6.2 Failure Operation 24 2.2.7 A7-Burst Request 24 2.2.7.1 Successful Operation 24 2.2.7.2 Failure Operation 24 2.2.8 A7-Burs

31、t Response .24 2.2.8.1 Successful Operation 24 2.2.8.2 Failure Operation 25 2.2.9 A7-Burst Commit .25 2.2.9.1 Successful Operation 25 ii TIA-2001.5-E-1 2.2.9.2 Failure Operation 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

32、 44 45 46 47 48 49 50 51 52 53 54 55 56 2.2.10 A7-Burst Release 25 2.2.10.1 Successful Operation 26 2.2.10.2 Failure Operation 26 2.2.11 A7-Reset . 26 2.2.11.1 Successful Operation 26 2.2.11.2 Failure Operation 26 2.2.12 A7-Reset Acknowledge 27 2.2.12.1 Successful Operation 27 2.2.12.2 Failure Opera

33、tion 27 2.2.13 A7-Paging Channel Message Transfer . 27 2.2.13.1 Successful Operation 27 2.2.13.2 Failure Operation 27 2.2.14 A7-Paging Channel Message Transfer Ack 27 2.2.14.1 Successful Operation 28 2.2.14.2 Failure Operation 28 2.2.15 A7-Access Channel Message Transfer . 28 2.2.15.1 Successful Ope

34、ration 28 2.2.15.2 Failure Operation 28 2.2.16 A7-Access Channel Message Transfer Ack 28 2.2.16.1 Successful Operation 28 2.2.16.2 Failure Operation 29 3.0 Message Formats 31 3.1 A3 Interface Message Formats . 31 3.1.1 A3-Connect. 31 3.1.2 A3-Connect Ack . 35 3.1.3 A3-Remove. 38 3.1.4 A3-Remove Ack

35、.41 3.1.5 A3-Drop 43 3.1.6 A3-Propagation Delay Measurement Report 46 3.1.7 A3-Physical Transition Directive . 48 3.1.8 A3-Physical Transition Directive Ack 52 3.1.9 A3-Traffic Channel Status 55 3.1.10 A3-IS-95 FCH Forward 57 3.1.11 A3-IS-95 FCH Reverse. 58 3.1.12 A3-IS-2000 FCH Forward 59 3.1.13 A3

36、-IS-2000 FCH Reverse. 60 3.1.14 A3-IS-2000 DCCH Forward. 61 3.1.15 A3-IS-2000 DCCH Reverse 62 3.1.16 A3-IS-2000 SCH Forward 63 3.1.17 A3-IS-2000 SCH Reverse. 64 3.1.18 A3-FCH Forward Traffic Frame. 65 3.1.19 A3-FCH Reverse Traffic Frame . 67 3.1.20 A3-DCCH Forward Traffic Frame . 69 3.1.21 A3-DCCH R

37、everse Traffic Frame 71 3.1.22 A3-SCH Reverse Traffic Frame . 73 3.2 A7 Interface Message Formats . 74 3.2.1 A7-Handoff Request. 74 3.2.2 A7-Handoff Request Ack . 82 3.2.3 A7-Drop Target 88 3.2.4 A7-Drop Target Ack. 90 3.2.5 A7-Target Removal Request 92 3.2.6 A7-Target Removal Response 94 3.2.7 A7-B

38、urst Request 96 3.2.8 A7-Burst Response . 100 3.2.9 A7-Burst Commit . 104 iii TIA-2001.5-E-1 3.2.10 A7-Burst Release108 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 3.2.11 A7-Reset . 111

39、 3.2.12 A7-Reset Acknowledge 112 3.2.13 A7-Paging Channel Message Transfer . 113 3.2.14 A7-Paging Channel Message Transfer Ack 115 3.2.15 A7-Access Channel Message Transfer . 116 3.2.16 A7-Access Channel Message Transfer Ack 118 4.0 Information Element Definitions 119 4.1 Generic Information Element

40、 Encoding. 119 4.1.1 Conventions 119 4.1.2 Information Element Identifiers 120 4.1.3 A3 and A7 Interface Information Elements 122 4.1.4 Additional Coding and Interpretation Rules for Information Elements 122 4.1.5 Cross Reference of Information Elements With Messages. 123 4.2 Information Elements .

41、131 4.2.1 Message Type II .131 4.2.2 Physical Channel Info. 133 4.2.3 Mobile Identity . 135 4.2.4 Cause 137 4.2.5 Cell Identifier 139 4.2.6 Cell Identifier List. 141 4.2.7 Downlink Radio Environment 142 4.2.8 Reverse Pilot Gating Rate. 144 4.2.9 Quality of Service Parameters 145 4.2.10 Forward Burst

42、 Radio Info. 146 4.2.11 Reverse Burst Radio Info 149 4.2.12 Software Version 151 4.2.13 IS-2000 Service Configuration Record. 152 4.2.14 Forward Layer 3 IS-2000 FCH/DCCH Data. 153 4.2.15 Reverse Layer 3 IS-2000 FCH/DCCH Data . 155 4.2.16 Forward Layer 3 IS-2000 SCH Data. 163 4.2.17 Reverse Layer 3 I

43、S-2000 SCH Data . 165 4.2.18 CDMA Serving One Way Delay 168 4.2.19 Neighbor List 169 4.2.20 A3 Signaling Address. 170 4.2.21 SDU ID. 171 4.2.22 A3 Traffic Circuit ID 172 4.2.23 Call Connection Reference . 173 4.2.24 PMC Cause. 174 4.2.25 Band Class 175 4.2.26 Correlation ID. 176 4.2.27 IS-2000 Non-N

44、egotiable Service Configuration Record 177 4.2.28 One Way Propagation Delay Record 178 4.2.29 Forward Layer 3 Data. 179 4.2.30 Reverse Layer 3 Data 182 4.2.31 CDMA Long Code Transition Info. 186 4.2.32 Channel Element ID . 187 4.2.33 Message CRC .188 4.2.34 Channel Element Status 189 4.2.35 Cause Li

45、st . 190 4.2.36 Privacy Info 191 4.2.37 A3 Connect Information . 193 4.2.38 A3 Connect Ack Information . 199 4.2.39 A3 Remove Information . 202 4.2.40 A3 Drop Information 204 4.2.41 Air Interface Message. 206 iv TIA-2001.5-E-1 4.2.42 Layer 2 Ack Request/Results 207 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1

46、5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4.2.43 A7 Originating ID.208 4.2.44 A7 Destination ID.209 4.2.45 A3 Destination ID.210 4.2.46 IS-2000 Power Control Info 211 4.2.47 IS-2000 Forward Power Control Mode. 213 4.2.48 IS-2000 FPC Gain Ratio Info 214 4.2.49 FCH/D

47、CCH Forward Air Interval Control . 216 4.2.50 FCH/DCCH Reverse Air Interval Control 218 4.2.51 SCH Reverse Air Interval Control 221 4.2.52 Forward 20 ms Data 223 4.2.53 Reverse 20 ms Data 224 4.2.54 Forward 5 ms Data 225 4.2.55 Reverse 5 ms Data 226 4.2.56 Cell Commitment Info List. 227 4.2.57 Exten

48、ded Neighbor List 229 4.2.58 A7 Burst Retry Delay List 231 4.2.59 IS-95 Channel Identity 232 4.2.60 Extended Handoff Direction Parameters 234 4.2.61 Rescue Request Info . 235 4.2.62 A3 Traffic IP Address. 236 4.2.63 Cell Pilot Increment List 237 5.0 Timer Definitions . 239 5.1 Timer Values 239 5.2 A

49、3/A7 Timer Definitions 239 5.2.1 Tbstreq. 239 5.2.2 Tbstcom239 5.2.3 Tconn3. 240 5.2.4 Tdiscon3240 5.2.5 Tdrptgt. 240 5.2.6 Thoreq240 5.2.7 Ttgtrmv. 240 5.2.8 Tchanstat. 240 5.2.9 Tphysical. 240 5.2.10 Tacm. 241 5.2.11 Tpcm. 241 5.2.12 T2241 5.2.13 T4241 v TIA-2001.5-E-1 List of Figures 1 2 3 4 Figure 4.1.3-1 A3/A7 Information Element Generic Layout . 122 vi TIA-2001.5-E-1 List of Tables 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Table 1.4-1 Element Flow DIRECTION Indication . 5 Table 4.1.2-1 A3/A7 Inf

展开阅读全文
相关资源
猜你喜欢
  • ASTM E119-2016a 9592 Standard Test Methods for Fire Tests of Building Construction and Materials《建筑结构和材料防火试验的标准试验方法》.pdf ASTM E119-2016a 9592 Standard Test Methods for Fire Tests of Building Construction and Materials《建筑结构和材料防火试验的标准试验方法》.pdf
  • ASTM E119-2018 0625 Standard Test Methods for Fire Tests of Building Construction and Materials《建筑结构和材料防火试验的标准试验方法》.pdf ASTM E119-2018 0625 Standard Test Methods for Fire Tests of Building Construction and Materials《建筑结构和材料防火试验的标准试验方法》.pdf
  • ASTM E119-2018a red 9375 Standard Test Methods for Fire Tests of Building Construction and Materials.pdf ASTM E119-2018a red 9375 Standard Test Methods for Fire Tests of Building Construction and Materials.pdf
  • ASTM E122-2000 Standard Practice for Calculating Sample Size to Estimate With a Specified Tolerable Error the Average for Characteristic of a Lot or Process《为估算一批产品或者一次加工过程的制品的质量对样.pdf ASTM E122-2000 Standard Practice for Calculating Sample Size to Estimate With a Specified Tolerable Error the Average for Characteristic of a Lot or Process《为估算一批产品或者一次加工过程的制品的质量对样.pdf
  • ASTM E122-2007 895 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《评估指定精度下一个批量或过程的性能平均值用试样尺寸.pdf ASTM E122-2007 895 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《评估指定精度下一个批量或过程的性能平均值用试样尺寸.pdf
  • ASTM E122-2009 9375 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《按规定的精度估算一批产品或一次加工过程特性曲线均.pdf ASTM E122-2009 9375 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《按规定的精度估算一批产品或一次加工过程特性曲线均.pdf
  • ASTM E122-2009e1 7500 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《计算样本大小 以便按指定精度估算批量品质或工.pdf ASTM E122-2009e1 7500 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《计算样本大小 以便按指定精度估算批量品质或工.pdf
  • ASTM E122-2017 6479 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《以指定精度估算某批产品或某工艺的特性均值的计算标.pdf ASTM E122-2017 6479 Standard Practice for Calculating Sample Size to Estimate With Specified Precision the Average for a Characteristic of a Lot or Process《以指定精度估算某批产品或某工艺的特性均值的计算标.pdf
  • ASTM E123-2002 Standard Specification for Apparatus for Determination of Water by Distillation《蒸馏法水分测定装置的标准规程》.pdf ASTM E123-2002 Standard Specification for Apparatus for Determination of Water by Distillation《蒸馏法水分测定装置的标准规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1