UL 873 CRD-2012 UL Standard for Safety Temperature-Indicating and-Regulating Equipment - Section Paragraph Reference 47A Subject Abnormal Switching Test - Requirements for controlsa.pdf

上传人:ideacase155 文档编号:1069008 上传时间:2019-04-02 格式:PDF 页数:4 大小:17.08KB
下载 相关 举报
UL 873 CRD-2012 UL Standard for Safety Temperature-Indicating and-Regulating Equipment - Section Paragraph Reference 47A Subject Abnormal Switching Test - Requirements for controlsa.pdf_第1页
第1页 / 共4页
UL 873 CRD-2012 UL Standard for Safety Temperature-Indicating and-Regulating Equipment - Section Paragraph Reference 47A Subject Abnormal Switching Test - Requirements for controlsa.pdf_第2页
第2页 / 共4页
UL 873 CRD-2012 UL Standard for Safety Temperature-Indicating and-Regulating Equipment - Section Paragraph Reference 47A Subject Abnormal Switching Test - Requirements for controlsa.pdf_第3页
第3页 / 共4页
UL 873 CRD-2012 UL Standard for Safety Temperature-Indicating and-Regulating Equipment - Section Paragraph Reference 47A Subject Abnormal Switching Test - Requirements for controlsa.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES INC. CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared and published by Underwriters Laboratories Inc.(UL). It is normative for the a

2、pplicable UL Product Certification Program(s); however, it is currently notpart of the UL Standard(s) referenced below.Product Category (CCN): XAPX, SDFYStandard Number: UL 873Edition Date: November 16, 2007Edition Number: 12Section / Paragraph Reference: 47ASubject: Abnormal Switching Test - Requir

3、ements for controls using electronictriggering techniques, such as zero-crossing switching, to control the controlsoutput switching deviceDECISION:47A Abnormal Operation Tests47A.1 General - The abnormal conditions described in 47A shall be imposed and maintained until ultimateresults are obtained.4

4、7A.2 Abnormal Switching Test47A.2.1 Controls incorporating electronic circuitry to trigger the controls output switching device in orderto achieve switching of contacts during more advantageous electrical conditions such as at zero crossing,shall be subjected to this abnormal switching test. This te

5、st is applicable when:a) Loads and circuits are only non-safety.b) Switching device components are used beyond their ratings47A.2.2 Two test samples shall be prepared and connected as follows:a) The driver circuit to the switching device is to be removed or modified to allow randomswitching.b) A gro

6、und arc fault indicating fuse is connected to accessible dead metal of the control. Thisfuse shall be 3-ampere maximum, non-time delay type fuse rated not less than the workingvoltage.c) The control is supported on a tissue paper covered softwood surface, and is covered with adouble layer of cheesec

7、loth conforming to the outline of the control. The cheesecloth is inaccordance with 63.1.2.d) The rated supply circuit is connected through a branch circuit protection device sizedaccording to installation requirements.e) The control is connected to its rated electrical load.UL COPYRIGHTED MATERIAL

8、NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL47A.2.3 The prepared test samples shall be operated in accordance with the endurance test requirementsin section 46, including the number of operating cycles and on/off periods, using random switching. Thetest samples s

9、hall be operated until either the required number of endurance test cycles are achieved oruntil ultimate results are demonstrated for 1h stabilized duration.47A.2.4 Immediately after each abnormal switching test, each control shall be subjected to the dielectricwithstand test in 47.1.47A.2.5 The con

10、trol shall either operate as intended in accordance with the endurance test specifications,or demonstrate an end-of-life fail safe condition with no evidence of an imminent electrical shock, fire orinjury to persons hazard. There shall be:a) no opening of the ground arc fault detection fuse,b) no bu

11、rning of the cheese cloth,c) no opening of the branch circuit protection device, andd) no breakdown during the post-abnormal switching dielectric withstand testingRATIONALE FOR DECISION:This Certification Requirement Decision is intended to establish requirements for controls using electronictrigger

12、ing techniques, such as zero-crossing switching, to control the output switching device in order toachieve switching of contacts during more favorable electrical conditions. To demonstrate capability andalso demonstrate required evaluation of the electronic control with zero-crossing switching techn

13、iques, thecontrol / switching device shall be subjected to an investigation that examines both normal and abnormalcontact switching conditions. Normal operating conditions are already evaluated under the existingtemperature, overload, endurance, and dielectric withstand tests. Abnormal contact switc

14、hing operatingconditions need to be evaluated under this Abnormal Switching Test. The Abnormal Switching Test is notapplicable if the electronic control with zero-crossing switching circuitry has been subjected to a UL 991and UL1998 (if applicable) investigation, or a UL 60730-1 investigation, since

15、 the control has demonstratereliability and production repeatability of the zero-crossing switching circuitry. In general the triggeringcircuitry is relied on to provide optimum switching operation of the contacts. Zero-crossing algorithms aretypical examples but there may be other methods that are

16、permitted. This CRD reflects current practice.This testing method can be applied provide the following conditions are met:- The circuit is NOT a safety circuit.- The switching component is being used outside of its certified rating.- The control has acceptably completed overload, endurance and diele

17、ctric withstand testing.Copyright 2012 Underwriters Laboratories Inc.UL, in performing its functions in accordance with its objectives, does not guarantee or warrant thecorrectness of Certification Requirement Decisions it may issue or that they will be recognized or adoptedby anyone. Certification

18、Requirement Decisions are the opinion of Underwriters Laboratories Inc. inpractically applying the requirements of the standard. They do not represent formal interpretations of thestandard under American National Standards Institute (ANSI) processes. UL shall not be responsible toanyone for the use

19、of or reliance upon Certification Requirement Decisions by anyone. UL shall not incurSTANDARD NUMBER: UL 873 -2-UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULany obligation or liability for damages, including consequential damages, arising o

20、ut of or in connectionwith the use or reliance upon Certification Requirement Decisions. The electronic version of theCertification Requirement Decision is the current version and previously printed copies may be outdated.This document is published as a service to ULs certification customersSTANDARD NUMBER: UL 873 -3-UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULSTANDARD NUMBER: UL 873 -4-No Text on This Page

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 24510-2008 Activities relating to drinking water and wastewater services Guidelines for the assessment and for the improvement of the service to users《饮用水和废水服务设施相关工作 用户服务的评估.pdf BS ISO 24510-2008 Activities relating to drinking water and wastewater services Guidelines for the assessment and for the improvement of the service to users《饮用水和废水服务设施相关工作 用户服务的评估.pdf
  • BS ISO 24511-2008 Activities relating to drinking water and wastewater services Guidelines for the management of wastewater utilities and for the assessment of wastewater services《.pdf BS ISO 24511-2008 Activities relating to drinking water and wastewater services Guidelines for the management of wastewater utilities and for the assessment of wastewater services《.pdf
  • BS ISO 24512-2008 Activities relating to drinking water and wastewater services Guidelines for the management of drinking water utilities and for the assessment of drinking water s.pdf BS ISO 24512-2008 Activities relating to drinking water and wastewater services Guidelines for the management of drinking water utilities and for the assessment of drinking water s.pdf
  • BS ISO 24516-1-2016 Guidelines for the management of assets of water supply and wastewater systems Drinking water distribution networks《供水和污水系统资产管理指南 饮用水分配网》.pdf BS ISO 24516-1-2016 Guidelines for the management of assets of water supply and wastewater systems Drinking water distribution networks《供水和污水系统资产管理指南 饮用水分配网》.pdf
  • BS ISO 24516-3-2017 Guidelines for the management of assets of water supply and wastewater systems Wastewater collection networks《供水和废水系统资产管理指南 废水收集网络》.pdf BS ISO 24516-3-2017 Guidelines for the management of assets of water supply and wastewater systems Wastewater collection networks《供水和废水系统资产管理指南 废水收集网络》.pdf
  • BS ISO 24517-1-2008 Document management - Engineering document format using PDF - Use of PDF 1 6 (PDF E-1)《文件管理 使用PDF的工程文件格式 1 6(PDF E-1)的使用》.pdf BS ISO 24517-1-2008 Document management - Engineering document format using PDF - Use of PDF 1 6 (PDF E-1)《文件管理 使用PDF的工程文件格式 1 6(PDF E-1)的使用》.pdf
  • BS ISO 24518-2015 Activities relating to drinking water and wastewater services Crisis management of water utilities《有关饮用水和废水服务的活动 水务事业的危机管理》.pdf BS ISO 24518-2015 Activities relating to drinking water and wastewater services Crisis management of water utilities《有关饮用水和废水服务的活动 水务事业的危机管理》.pdf
  • BS ISO 24521-2016 Activities relating to drinking water and wastewater services Guidelines for the management of basic on-site domestic wastewater services《饮用水和废水服务相关活动 家庭废水基本现场服务的.pdf BS ISO 24521-2016 Activities relating to drinking water and wastewater services Guidelines for the management of basic on-site domestic wastewater services《饮用水和废水服务相关活动 家庭废水基本现场服务的.pdf
  • BS ISO 24523-2017 Service activities relating to drinking water supply systems and wastewater systems Guidelines for benchmarking of water utilities《饮用水系统和废水系统相关服务活动 水设施基准指南》.pdf BS ISO 24523-2017 Service activities relating to drinking water supply systems and wastewater systems Guidelines for benchmarking of water utilities《饮用水系统和废水系统相关服务活动 水设施基准指南》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1