1、MIL-C-48132 (MU) 30 November i972 MILITARY SPECIFICATION CARTRIDGE, 106MM: PRACTICE, M344A1, W/INERT PROJECTILE, W/O FUZE LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of practice cartridge designated as Cartridge, 106rm: Prac
2、tice, M344A1, w/Inert Projectile, w/o Fuze. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-D-1000 - Drawings, Engineering and Associated Lists MIL
3、-A-2550 - Ammunition and Special Weapons; MIL-1-45607 - Inspection Equipment, Supply and Maintenance General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-109 - Inspection Terms and Definitions MIL-STD-414 - Sampling Procedures and Tables for MIL-STD-1
4、167- Ammunition Data Card MIL-STD-1168- Lot Numbering of Ammunition MIL-STD-1235- Single and Multilevel Continuous Inspection by Attributes (ABC-STD-105) Inspection by Variables for Percent Defect ive Sampling Procedures and Tables for Inspection by Attributes FSC: 1315 Provided by IHSNot for Resale
5、No reproduction or networking permitted without license from IHS-,-,-mandatory (designated “MU“) and non-mandatory (indicated by drawing or Federal Stock Number). 14 (- ._ i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-LI332 33 m 7977906 033
6、6496 7 = MIL-C-48132 (MU) When an inspection equipment list references mandatory Army designs, the contractor shall comply with, and use these designs accor- dingly. The contractor may, however, in connection with non- mandatory designs, design alternate inspection equipment or use comparable commer
7、cial equipment to facilitate his operations. Such contractor-prepared designs or commercial equipment selections must be approved by the Government prior to fabrication or procuring of the equipment. Designs shall be submitted for approval as specified in 6.3.5. 6.3.4 Contractor Designs.-Contractor
8、designs are designs of inspection equipment for which the Government has assigned design responsibility to the contractor. Contractor designs shall be supported by detailed drawings which completely depict all information necessary to completely fabricate, calibrate and operate an item of inspection
9、 equipment. This requires that the necessary views, dimensions, materials, finish, notes, operating and calibration instructions be properly depicted in accordance with approved practices to the extent that further calculation or clarification will not be required. Unless otherwise specified, contra
10、ctor designs may be developed on the format the contractor normally employs in his equipment design procedure provided such format reflects the detail and information specified above, subject to the following controls: All submitted contractor designs shall conform to MIL-D-1000, Category A, Form 2.
11、 Legibility and reproducibility shall permit conventional making of clearly understandable, high contrast reproductions. Contractors shall submit one copy of final designs as a flat set. Designs shall be submitted for approval as specified in 6.3.5. 6.3.5 Submission of Contractor Designs.-All submit
12、ted designs shall contain a reference to the applicable five-digit code number contained in Section 4 of this specification and the appropriate component or assembly drawing number and revision letter to which the specific design applies. Unless otherwise specified on the EL, all designs of equipmen
13、t for inspection of defects classified as Critical and Major shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, ATTN: SMUPA-QA-A-A. All other designs of inspection equipment shall be approved by the inspection element of the agency administering the contract; submission sh
14、all be as directed by the contracting officer. Partial submission of inspection equipment designs is permissible and encouraged; however, the Arsenal completion date for .design review will be based on the date of the final submission of designs. Picatinny Arsenal design review will be accomplished
15、normally within one month after receipt. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_T - MIL-C-4132 13 W 777770b 031b477 7 W . MIL-C-48132 (MU) 6.4 Cost of Check Test.-The contracting officer will arrange for the contractor to be reimbursed for
16、the expense incurred in the performance of check tests. The test shall be conducted at Government expense without cost to the contractor who loaded the primers, or to the contractor assembling the cartridge, and shall not constitute a basis for rejection against either contractor, except where deter
17、ioration has occurred as a direct result of carelessness in handling, storage, etc., permitted while the primer lot was under the jurisdiction of either contractor. 6.5 Visual Examination. -When compliance with the applicable requirements is in doubt as a result of visual examination, the characteri
18、stic may be measured or gaged to determine acceptability. 6.6 Submission of Test Data and Ammunition Data Cards.-In addition to the normal distribution of records, when the cartridge is procured by the U. S. Army Munitions Command, one copy of all ballistic test data and ammunition data cards shall
19、be for- warded to each of the following: Commanding Officer Picatinny Arsenal Dover, New Jersey 07801 ATTN: SMUPA-&A-A-A and SMUPA-AD-E-A2 Custodian: Army-MU Project Number: 1315-A-O03 16 * U. 8. GOVERNMENT PRINTING OFFICE: 1973 -714-914/864 $- LL b .& Preparing Activity: Army -MU Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-