1、MIL-P-b3052 13 7777906 0343036 7 5-37- o3 t41 L-P- 6 3052 (PA) 4 PAACH 1976 MILITARY SPEC1 FICATION .s. PANEL, FIRING FAE CBU-55 UH-1 ASSEMBLING AND PACKING This specification is approved for u%e by Picatinny Arsenal, Departnent of the Army, and is vailable for use by all Departments and Agencies of
2、 the Department of Defense. 1. SCOPE 1.1 This specification covers the fabrication, assembling and packing for one type of Firing Panel designated as Panel, Firing FAE CBU-55 H-1. . 2 . APPLICABLE DOCUIENTS 2.1 The following documents of the.issue in effect on date of invitation for bids or request
3、for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY IQIL-P-116 - Preservation, Methods of MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS FEDERAL FEb-STD-151.- Metals; Test Hethods MILITARY MIL-S
4、TD-1OSD - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) -. . FSC: 1345 /THIS DOCUMENT CONTAINS 26 PAGES. “, - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63052 13 = 737370b 0343037 O W - MIL-P-630C2 (PA) MIL-STD-
5、171 - Finishing of Metals and Wood Surfacer DRAWINGS U.S. ARMY PICATINNY ARSENAL 8880602 - Marking and Sealing for Unit Packages 9233628 - Box, Packing, for Panel, Firing, Mine Dispenser (UH-1B Automated) or Panel, .Firing FAE CBU-55 UH-1 9275308 - Cable Assembly Power Electrical UH-1 9275309 - Cabl
6、e Assembly Special Purpose Electrical UH- 1 9275320 - Panel, Firing FAE CBU-55 UH-1 9277243 - Packing and Marking for Box, Fi.b.erboard for, Cable Assembly Power 9277244 - Box, Fiberboard, Packing for, Cable Assembly 9277245 - Packing and Marking, for Box, Fiberboard, for, Cable Assembly Special Pur
7、pose 9277246 - Box, Fiberboard, Packing for, Cable Assembly Special Purpose (Copies of specifications, standard; and drawings required by contractors in coonection with specific procurement functions should be obtained from the procuring activity or as directed . by the Contracting Officer). 3. REQU
8、IREMENTS 3.1 Material. - Materials shall be in accordance with applicable drawings and specifications . * 3.2 Assembl . - The assembly shall comply with all require- ments spec4 U lu Ln O m o I pc I 4 H z E I. lu Cu ma m M mm . f ln. In lnln rn c, o al k al tl ki k A rl ci Provided by IHSNot for Res
9、aleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63052 13 W 9999906 0343043 2 W MIL-P-63052 (PA?) 4.4 Quality conformance inspection 4.4.1 Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination. - (See
10、 MIL-A-48078). Unless other- wise specified in the classification of defects and test in accordance? with MIL-STD-105, Inspection Level 1?1. Equip- ment necessary for the performance of the inspections listed shall be in accordance with 4.4.4. ? tables, sampling plans for major and minor defects sha
11、ll?be I. . . I? Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a I- cr U b n P - MIL-P-63052 13 = 977770b 0343042 4 W i. U G k m ri E s pc ri W.W. bt8t O0 O0 at n LnO o0 Od Id d k aJ a a, c O z 2 _. Q g. 3 “ U k ri a, a d fa E UM cc 04 fi* he proced
12、ure specified in 4.5.2. All assemblies that fail to comply with the require- ment shall be classed defective and removed from the lot (Non-Destructive Test). be performed 100 percent in accordance with the procedure specified in 4.5.2. the requirement shall he classed defective and removed from the
13、lot (Non-Destructive Test) . required to perform the inspections and .tests prescribed in thisispecification is identified in the Paragraph Reference/ Inspection Method column in the tables starting with palci- graph 4.4.2.1, and the test method paragraphs (see 4.5). The contractor shall submit for
14、approval, inspection equip- ment designs in accordance with the terms of the contract. See Section 6.of MIL-A-48078, and 6.2 herein, 4.4.3.2.2 Insulation Resistance Test.- This test shall All assemblies that fail to comply with 4.4.4 1.nspect.ion Equipment. - The inspection equipment 4.5 Test Method
15、s and Procedures 4.5.1 Functionin . - The firing pmels shall be ?. : electrically -a! connecte to a left and right bomb rack (see Fig, ! for the performance of the following tests. volt (UC) 15 ampere power supply will be required. Place the POWER and ARM switches in the safe positions and the selec
16、tor switch in the BOTH position with the LEFT and RIGHT rack suspension hooks closed. Observe for compliance with the applicable requirements prior to and after depressing the FIRE button, An 18 volt plus 3 a* . 4.5.1.1 POWER and ARM switches in safe position, - 25 Provided by IHSNot for ResaleNo re
17、production or networking permitted without license from IHS-,-,-flIL-P-b3052 13 W 7777706 03L13061 = MiL-?-63QSZ (PA) KELLET RACK, KELLET AI RCRAFT cnw . P/N 206-K68-600- 1 POWER J 18VOC P/N 206- K68- 600- 2 9275320 - PANEL, FIRING FAE CBU-55 UH-I FIGURE 1 ., FIRE CnNTPOL PANEL FUNCTlnNAL TEST SETUP
18、 SCHml C 26 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63052 13 W 7777706 03L13062 T W 141 L-P- 63052 (PA) 4.5.1.2 POWER and ARE4 switch,es in the on positions and selector switch in tfie- BOTH p os-ition. - Place the power and arm switche
19、-s in the on positions and selector switch in the BOTH position. Observe th-at the arming sdlenoids on the bomb rack are in the extended positions, and the rack suspension hooks are closed. Depress the FIRE bottom and observe for compliance with the applicable requirements, 4.5.1.3 Selector switch o
20、n LEFT position. - Place the selector switch in LEFT tiosition and close the left and right rack suspension hoks Depress the FIRE button and observe for compliance with the applicable requirements. 4.5.1.4 Selector switch in RIGHT position. - Place the selector switch in- the RIGHT position and clos
21、e the left and right rack suspension hooks. Depress the FIRE button and observe for compliance with the applicable requirements 4.5.1.5 POWERswitch in the .on position, ARE4 switch -in.the safe position and selector switch in the B-E“ position. Place the P01VER switch in the on position, AIUE4 switc
22、h in the safe position and selector switch-in th? BOTH position. Observe that the rack suspension hooksare closed. Depress the FIRE button and observe for compliance with the applicable requirements. ,NOTE: Observe also that the. solenoid pins have remained retracted. 45.1.6 Indicatini lamp function
23、 test. - Place the POWER and.AiUII switches in the safe positions, and the rack suspension hooks in the open positions. concec.utively and observe for comp1i.ance with the applicable requirements. Depresis all indicator lamps 4,5.2 Cable assembly. . 4.5.2.1 Continuity Test.- The cable shall be teste
24、d for the required resistance using a- Government approved fixture and,digital ohmmeter. .Any cable failing to comply with ali of, the specified requirements of 3.4 shall be classed defective. 4.5.2.2 Insulation Resistance Test.- The cable shall be tested for the required insulatiqn resistance using
25、 a Govern- ment approved test fixture and megohmmeter. Any cable failing to comply with all of the specified requirements of 3.4 shall be classed defective. 27 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.MIL-P-b3052 13 W 7777706 03LI3063 1 W MIL
26、-P-63052 (PA) 5. PREPARATION FOR DELIVERY 5.1 Preservation and packaging , 5.1.1 Level A. - The firing panels and cables shall be preserved ana packaged in accordance with Drawings 9233628, 9277243, 9277244, 9277245, and 9277246. 5,2 Packing 5.2.1 Level A. - TKe carton sliall be packed as specified
27、on Drawing IITEZK !i*3 Markin . - The markings shall be in accordance with Drawings 8 4 9233628, 9277243, 9277244, and 9277745. 6. NOTES 6.1 Ordering Data. - Procurement documents shall specify the following: a. Title, number and date of this specification. b. C. . Provisions of MIL-A-48078. Provisi
28、ons for submission of first article samples. . 6.2. Submission of Inspection Equipment Designs for Approvn; (See HIL-A-48078). Submit equipment designs as required, to Commander: Picatinny Arsenal, ATTN: SARPA-QA-T-T, Dover, New Jersey 07801, . 6.3 Distribution of ammunition data cards. - Distributi
29、on of data cards shall include the tollowing: Arsenal, ATTN: SARPAyQA-A-14, Dover, New Jersey 07801. Commander, Picatinn: C us t odi an : Pro j ec t tiumber : Preparing Activity: Army-PA Army-PA i 34s -A- 16 3 28 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-