1、MIL-W-604 25 (MU) 15 May 1967 MILITARY SPECIFICATION WARHEAD, 2.75 INCH ROCKET, PRACTICE XM230, WITH OR WITHOUT FUZE LOADING, ASSEMBLING AND PACK1 iJC1 1. SCOPE 1.1 This specification covers the quality assurance provisions and. special requirements not covered by the drawings, for one typg of pract
2、ice warhead designated as Warhead, 2.75 Inch Rocket, Practice, Xi4230 (See 6.4). 2. APPLICABLE DOCUYEIJTS :.l The following documents of the issue in effect on date of ir1v.t I ation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS M
3、ILITARY MIL-A-2550 MIL-1-45607 - Ammunition and Special Weapons, General - Inspection Equipment, Supply and Specification for. Maintenance of. STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-1168 MIL-STD-1235 - Sampling Procudures and Tables for Inspection by Attributes. - Quality Assurance Terms
4、 and Definitions, - Lot Numbering of Ammunition - Single and Multilevel Continuous Sampling procedures and Tables for Inspection by Attributes. d- 4, THIS UOCUMENT CONTAINS in accordance with the information specified in Standard Mil-Std-1167. a. Title, number and date of this specification. b. Data
5、 cards. - Data cards shall be prepared for 6.2 Inspection code numbers.-The five digit code numbers assigned to the inspections herein are to facilitate future data collection and analysis by the Government. 6.3 Inspection equipment. - The contractor shall design inspection equipment as required by
6、the referenced inspection Equipment Lists (EL) in accordance with the instructions of paragraphs 6 . 3.1 through 6.3.5. 6.3.1 inspection equipment lists. - inspection equipment lists indicate the availability of inspection equipment designs by showing in the ttnwnbertt column of the list of inspecti
7、on equipment (Form SMUPA 1010) the numbers of drawings or Federal Stock numbers of existing equipment designs, or codes as indi- cated in paragraph 6.3.2. Design action required of the con- tractor is described in paragraphs 6.3.3 and 6,3.4. The con- tractor will be required to prepare detailed draw
8、ings in accor- dance with 6.3.4 for all the equipment coded as “Contractor be approved by the Government prior to fabrication or procuring of the equipment. Designs shall be submitted for approval as specified in 6.3.5. 6.3.2 Inspection equipment list codes. - The inspection equipment as defined in
9、6.3.3 and 6.3.4 will be designated in the EL by the following codes: in the number column. These contractor designs must CD - Contractor design on controlled contractor format MU - Army design, mandatory for use. 6.3.3 Army designs, - Army designs are reflected on de- -tTriled drawings which complet
10、ely depict all the information necessary for the fabrication of the item of inspection equip- ment. The contractor need provide no design when an Army de- sign is listed for an item of inspection equipment. Army de- signs fall into two basic classifications; mandatory (designated 10 and/or commercia
11、l equipment. fl 7 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-hq25 13 I 777770b 0338377 7 MIL-W-60425 (MU) and non-mandatory (indicated by drawing or Federal Stock Number). When an inspection equipment list references manda- tory Army des
12、igns, the contractor shall comply with, and use these designs accordingly. The contractor may, however, in connection with non-mandatory designs, and with the approval of the Government, design alternate inspection equipment or use comparable commercial equipment to facilitate his opera- tions. Such
13、 contractor prepared designs or commercial equip- ment selections must be approved by the Government prior to fabrication or procuring of the equipment. Designs shall be submitted for approval as specified in 6.3.5. of inspection equipment for which the Government has assigned desicn responsibility
14、to the contractor. Contractor designs shall be supported by detailed drawings which depict u11 infor- mation necessary to completely fabricate, calibrate and operate an item of inspection equipment. This requires that the neces- sary views, -dimensions, materials, finish, notes, operating and calibr
15、ation instructions be properly depicted in accordance with approved practices to the extent that further calculation or clarification will not be required. Unless otherwise speci- fied, contractor designs may be developed on the format the contractor normally employs in his equipment design procedur
16、e . provided such format reflects the detail and-information speci- fied above, subject to the following controls: All submitted contractor designs shall conform to MIL-D-1000, Category E, Form 2. Legibility and reproducibility shall permit conven- tional making of clearly understandable, high contr
17、ast repro- ductions. Contractors shall submit one copy of final designs as a rolled set. Designs shall be submitted for approval as specified in 6.3.5. G.3.5 Submission of contractor designs. - All submitted designs shall contain a reference to the applicabl five digit Code Number contained in Secti
18、on 4 of this speciflcation. Unless oLhe1v:ise specified on the EL, all designs of equ3 pient for in- spection of defects classified as critical and maJor shall be submitted for approval to the Commanding Officer, Picatinny Ar- smal, AlTJ: SMUPA-ND9. All other designs of inspection equlp- iwnt; shall
19、 be approved by the inspection element of the agency aciministcring the contract; submission shall be as directed by the contracting officer. Partial submission of inspection equip- ment designs is permissible and encouraged. However, the Arsenal completion date for design review will be based on th
20、e date of the final submission of designs. Picatinny Arsenal design review will be accomplished normally within one month after receipt. 6.3.4 Contractor designs. - Contractor designs are.designs 11 : . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
21、-MIL-W-60425 (MU) 6.4 Fuze or Fuze Body.-The practice warhead will normally be supplied with eit:her a fuze or fuze body as designated by the procuring activity. NOTICE: When Government drawings, specifications, or other data are used for any purpose other than in connection with a definitely relate
22、d Government; procurement operation, the Unitcd States Govern- ment thereby incurs no responsibility nor any obligation whatso- ever; and the fact that the Government may have formulated, fur- nished, or in any way supplied the said drawings, specifications, or other data is not to be regarded by im
23、plication or otherwise as in any manner licensing the holder or any other person or corporation or conveying any rights or permission to manufacture, use, or sell any pattented invention that may in any way be related thereto. l CustolJian: Aqhy-MU Preparing activity: Amy-MU Project No. 1340-A-234 LUS. GOVGRir?uENT PRINTING OFFICE 1967-251-520/6868 12 P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-