ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf

上传人:registerpick115 文档编号:453778 上传时间:2018-11-23 格式:PDF 页数:31 大小:1.08MB
下载 相关 举报
ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf_第1页
第1页 / 共31页
ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf_第2页
第2页 / 共31页
ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf_第3页
第3页 / 共31页
ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf_第4页
第4页 / 共31页
ASD-STAN PREN 9223-104-2016 Programme Management - Configuration Management - Part 104 Configuration Control (Edition P 1).pdf_第5页
第5页 / 共31页
亲,该文档总共31页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 ASD-STAN STANDARD NORME ASD-STAN ASD-STAN NORM ASD-STAN prEN 9223-104:2016 Edition P1 2016-10 PUBLISHED BY THE AEROSPACE AND DEFENCE INDUSTRIES ASSOCIATION OF EUROPE - STANDARDIZATION Rue Montoyer 10 - 1000 Brussels - Tel. + 32 2 775 8126 - Fax. + 32 2 775 8131 - www.asd-stan.org ICS: Descriptors:

2、ENGLISH VERSION Programme Management Configuration Management Part 104: Configuration Control Programm-Management Konfigurationsmanagement Teil 104: Konfigurationslenkung Management de Programme Gestion de la Configuration Partie 104 : Matrise de la configuration This “Aerospace Series” Prestandard

3、has been drawn up under the responsibility of ASD-STAN (The AeroSpace and Defence Industries Association of Europe - Standardization). It is published for the needs of the European Aerospace Industry. It has been technically approved by the experts of the concerned Domain following member comments.

4、Subsequent to the publication of this Prestandard, the technical content shall not be changed to an extent that interchangeability is affected, physically or functionally, without re-identification of the standard. After examination and review by users and formal agreement of ASD-STAN, the ASD-STAN

5、prEN will be submitted as a draft European Standard (prEN) to CEN (European Committee for Standardization) for formal vote and transformation to full European Standard (EN). The CEN national members have then to implement the EN at national level by giving the EN the status of a national standard an

6、d by withdrawing any national standards conflicting with the EN. ASD-STAN Technical Committee approves that: “This document is published by ASD-STAN for the needs of the European Aerospace Industry. The use of this standard is entirely voluntary, and its applicability and suitability for any particu

7、lar use, including any patent infringement arising therefrom, is the sole responsibility of the user.” ASD-STAN reviews each standard and technical report at least every five years at which time it may be revised, reaffirmed, stabilized or cancelled. ASD-STAN invites you to send your written comment

8、s or any suggestions that may arise. All rights reserved. No parts of this publication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ASD-STAN. Order detai

9、ls: E-mail: salesasd-stan.org Web address: http:/www.asd-stan.org/ Edition approved for publication Comments should be sent within six months after the date of publication to ASD-STAN General Domain prEN 9223-104:2016 (E) 2 Contents Page 1 Scope . 5 2 Normative references . 5 3 Terms and definitions

10、. 5 4 Configuration control place in the overall programme Configuration Management 5 4.1 Configuration control process overview . 5 4.2 The Configuration Control process nature . 6 4.3 Tasks associated with configuration control . 8 5 Configuration control principles 9 5.1 General . 9 5.2 Allocatio

11、n of an item to an authority. 9 5.3 Technical changes, deviations permits and concessions shared provisions 9 5.4 Technical changes process 9 5.5 Deviation permit process . 10 5.6 Concessions handling process 10 5.7 Data necessary for decision making . 11 5.8 Request for an engineering change, a dev

12、iation permit or a concession . 12 5.9 Area affected and related management authority 13 5.10 Technical changes, deviations and concessions annulment 16 6 Evolution of configuration control throughout the programme lifecycle 17 6.1 Change of responsible authority 17 6.2 Configuration control activit

13、ies within a programme lifecycle 17 7 Specific cases . 19 7.1 Items common to several programmes . 19 7.2 Shared-programme management . 20 (informative) Document management prerequisite necessary for Configuration Annex AManagement control 21 (informative) Marking and traceability prerequisite neces

14、sary for Configuration Annex BManagement control 22 (informative) Example of technical change handling process 23 Annex CC.1 Introduction 23 C.2 Request elaboration . 23 C.3 Change request investigation 23 C.4 Change detailed design 25 C.5 Technical change implementation on product and production pr

15、ocess 26 (informative) Nonconformity handling process and relationship with configuration Annex Dcontrol . 27 D.1 General principles and scope 27 D.2 Immediate actions - Detection 28 D.3 Investigation and application of the decision . 30 D.4 Nonconformity handling process 30 prEN 9223-104:2016 (E) 3

16、 Foreword This standard was reviewed by the Domain Technical Coordinator of ASD-STANs General Domain. After inquiries and votes carried out in accordance with the rules of ASD-STAN defined in ASD-STANs General Process Manual, this standard has received approval for Publication. prEN 9223-104:2016 (E

17、) 4 Introduction The finality of Configuration Management is to assure during the whole product lifecycle1): consistency and commonality of the technical information among all actors; traceability of this technical information. For that purpose, Configuration Management organizes and implements the

18、following activities: selection of items and technical information that shall be submitted to Configuration Management, under clearly established responsibility (configuration identification); capture, keeping this information and making it available (configuration status accounting); verification a

19、nd validation of the coherence of this information at defined steps of the product lifecycle (configuration verifications, reviews and audits); technical changes and gaps processing in order to keep the consistency of this information (configuration control). 1)See EN ISO 9000. prEN 9223-104:2016 (E

20、) 5 1 Scope The present document is declined from the principles described in the EN 9223-100, it: is based on internationally-recognised concepts; proposes organisational principles and implementation processes for configuration management from both viewpoints: “programme” and “company”, with empha

21、sis on the “programme” viewpoint; deals with configuration control but not contract management methods. It is up to each person responsible for a programme to define the detailed methods of application and tailoring as necessary. 2 Normative references The following documents, in whole or in part, a

22、re normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 9100, Quality Management Systems Requirements for A

23、viation, Space and Defense organizations EN 9223-100, Programme Management Configuration Management Part 100: A guide for the application of the principles of configuration management2)EN 9223-105, Programme Management Configuration Management Part 105: Glossary2)EN ISO 9000, Quality Management Syst

24、em Fundamentals and Vocabulary ISO 10007:2003 Quality management system Guidelines for configuration management 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN ISO 9000, ISO 10007:2003 and EN 9200 apply. The specific terms needed to understand and to

25、use the document are the object of definitions appearing in EN 9223-105. 4 Configuration control place in the overall programme Configuration Management 4.1 Configuration control process overview As a rule, configuration control begins when the configuration baseline has been identified and then ver

26、ified, reviewed and audited. 2)Published as ASD-STAN Prestandard at the date of publication of this standard. http:/www.asd-stan.org/ prEN 9223-104:2016 (E) 6 Figure 1 Place of the configuration control process in Configuration Management processes 4.2 The Configuration Control process nature The co

27、nfiguration management process is composed of a set of actions and decisions (product and responsibilities-trees), set up in order to keep and improve consistent relationships between the configurations and the products trees: maintaining identification (updates of functional, allocated and product

28、configuration baselines, etc.); maintaining qualifications (verification of non-regression); maintaining links between the different configurations of a same item such as, links between index of definition file and index of the technical requirement specification. Configuration control is mainly a d

29、ecisional process (preparing decision and decision making, and control of decisions implementation) meant to guarantee the overtime consistency for configuration items and associated data. As such, for a given authority, configuration control exclusively concerns items and data selected during the c

30、onfiguration identification process. This set of items and data establishes the authoritys field of competence. The process is implemented as soon as the first configuration baseline is established. It addresses any effects on the configuration of (see Figure 3): needs for technical changes (includi

31、ng those following the detection of defects); technical events and anomalies. prEN 9223-104:2016 (E) 7 Within this framework, configuration control relies on an organization that: associates customers, industrial partners and suppliers to jointly carry out tasks and responsibilities; attributes a ma

32、king authority to each configuration item; attributes power delegations throughout the network of customers, partners and suppliers, according to the decisions of selection; uses mandatory or existing document management systems, (see Annex A); uses mandatory or existing technical data management sy

33、stems; uses mandatory or existing product lifecycle management systems; specifies modalities of tracking of changes as described in the Configuration Management plan. Technical events and anomalies detected and characterized throughout the product lifecycle are processed in a specific way, including

34、 as necessary (but not limited to) the following actions: describing conformity issues (actually stated or foreseeable); investigating the causes and assessing the effects; designing and implementing curative actions (e. g. rework or repairs); designing corrective and/or preventive actions; confirmi

35、ng and identifying nonconformity; issuing requests for: o concessions on the considered item; o technical changes and deviations on subsequent items. Such requests are outputs from the above described processes, and should be submitted to the competent Configuration Management authority and forms in

36、puts for the configuration control process (see Figure 3). The final consequences on the configuration may be: technical changes introduced in the updated approved configuration, the applicable configuration, and the as-built configuration; decided and implemented deviations; accepted and recorded c

37、oncessions. Possible consequences on the contractual baseline are covered by the provisions specific to contract management (amendment, endorsement or equivalent). The configuration control process is more precisely described (hereafter). Control process for concessions and deviation permits as well

38、 as the associated competence criteria, should be based on the same basic requirements. prEN 9223-104:2016 (E) 8 Figure 2 Configuration control and other interface processes 4.3 Tasks associated with configuration control 4.3.1 Identifying process The following tasks apply to all items, whether sele

39、cted or not as configuration items, even though these tasks cannot be considered as Configuration Management activities. Nonetheless, an efficient configuration control process cannot be carried out without their rigorous implementation. The Configuration Management plan shall specify details of imp

40、lementation. 4.3.2 Document management tasks The setting up of a system of identifiers permit to identify changes within a document, although it does not belong to configuration management activities (indeed, an item or a document shall have an identifier, whether it is considered as a configuration

41、 item or not). 4.3.3 Product marking Products or batches/lots marking shall permit to link these items to any control decision. Thus: this marking, thanks to the documentation of associated configuration status, can lead to know all the control decisions (change index, deviation or concession markin

42、g); serialisation marking also guarantees the traceability necessary to maintenance (interchangeability); marking ensuring interchangeability must be implemented on the specimen or on its associated accompanying documents. Marking rules could be clarified in the configuration management plan. prEN 9

43、223-104:2016 (E) 9 5 Configuration control principles 5.1 General For a specific authority, configuration control over an item encompasses the configuration documentation and associated data, “identified” as a whole. In order to define its scope of intervention, each authority3)assumes the decision

44、to recognise configuration items and data for which it has been delegated configuration management authority. 5.2 Allocation of an item to an authority The allocation of an item to an authority, and reciprocally, is deduced from an analysis based on the configuration data and items, as potentially i

45、mpacted by a control decision. This allocation rule shall be clarified in the configuration management plan. 5.3 Technical changes, deviations permits and concessions shared provisions In the following clauses, provisions common to technical changes, deviation permits and concessions and provisions

46、specific to each category will be distinguished. Each technical change, deviation permit and concession experiences its own life cycle and is subject to a decision-making process. Management process: indicates involved entities and actors (who does what?); describes process flow (how?) and the decis

47、ions to be made (what?); is tailored as the programme progresses. Two pieces of information are particularly important in the technical changes, deviation permits and concessions management procedure: the request which generally replaces the statement of need (see 5.8); the file which, from the requ

48、est, is step by step supplemented with any necessary elements (see 5.7). A simplified example of the logical progression of technical change management is presented in Annex C. NOTE In case of acknowledged emergency, and subject to previous collection of any necessary pieces of advice, this process

49、may be conducted according to a specific procedure generally called “emergency procedure”. 5.4 Technical changes process Any technical change shall meet an identified specific need (see 5.8). Any technical change exhibits the following features: once approved, the technical change is intended to stand unmodified (any cancellation or modification would require another technical change to be approved); 3)Several authority levels exist; each authority is responsible for the configur

展开阅读全文
相关资源
  • ASD-STAN PREN 4022-1994 Aerospace Series Pipe Coupling 8 Degrees 30 in Titanium Alloy Elbows 90 Degrees Bulkhead Welded (Edition P1)《航空航天系列 钛合金制830管接头 90焊接穿壁弯头 第P1版[替代 ASD-STAN.pdfASD-STAN PREN 4022-1994 Aerospace Series Pipe Coupling 8 Degrees 30 in Titanium Alloy Elbows 90 Degrees Bulkhead Welded (Edition P1)《航空航天系列 钛合金制830管接头 90焊接穿壁弯头 第P1版[替代 ASD-STAN.pdf
  • ASD-STAN PREN 4021-1994 Aerospace Series Pipe Coupling 8 Degrees 30 in Titanium Alloy Elbows 90 Degrees Bulkhead (Edition P1)《航空航天系列 钛合金制830管接头 90穿壁弯头 第P1版[替代 ASD-STAN PREN 325.pdfASD-STAN PREN 4021-1994 Aerospace Series Pipe Coupling 8 Degrees 30 in Titanium Alloy Elbows 90 Degrees Bulkhead (Edition P1)《航空航天系列 钛合金制830管接头 90穿壁弯头 第P1版[替代 ASD-STAN PREN 325.pdf
  • ASD-STAN PREN 4018-2007 Aerospace series Pipe coupling 8 degree 30 in titanium alloy Elbows 90 degree with thrust wire nut (Edition P2)《航空航天系列 钛合金制830管接头 旋转螺母、带止推金属丝帽的90弯头 第P2版.pdfASD-STAN PREN 4018-2007 Aerospace series Pipe coupling 8 degree 30 in titanium alloy Elbows 90 degree with thrust wire nut (Edition P2)《航空航天系列 钛合金制830管接头 旋转螺母、带止推金属丝帽的90弯头 第P2版.pdf
  • ASD-STAN PREN 3256-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 45 Degree Swivel Nut Welded (Edition P 2 )《航空航天系列 钛合金制830管接头 旋转螺母、焊接式45弯头 第P2版[替代为 AS.pdfASD-STAN PREN 3256-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 45 Degree Swivel Nut Welded (Edition P 2 )《航空航天系列 钛合金制830管接头 旋转螺母、焊接式45弯头 第P2版[替代为 AS.pdf
  • ASD-STAN PREN 3254-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 90 Degree Bulkhead Welded (Edition P 2)《航空航天系列 钛合金制830管接头 焊接式穿壁90弯头 第P2版[替代为 ASD-STAN.pdfASD-STAN PREN 3254-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 90 Degree Bulkhead Welded (Edition P 2)《航空航天系列 钛合金制830管接头 焊接式穿壁90弯头 第P2版[替代为 ASD-STAN.pdf
  • ASD-STAN PREN 3253-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 90 Degree Bulkhead (Edition P 2 )《航空航天系列 钛合金制830管接头 穿壁90弯头 第P2版[替代为 ASD-STAN PREN 402.pdfASD-STAN PREN 3253-1994 Aerospace Series Pipe Coupling 8 Degree 30 in Titanium Alloy Elbow 90 Degree Bulkhead (Edition P 2 )《航空航天系列 钛合金制830管接头 穿壁90弯头 第P2版[替代为 ASD-STAN PREN 402.pdf
  • ASD-STAN TR AMS2750-2009 《航空航天系列 航空航天材料规范 高温测定法》.pdfASD-STAN TR AMS2750-2009 《航空航天系列 航空航天材料规范 高温测定法》.pdf
  • ASD-STAN TR AMS2750 FRENCH-2009 《航空航天系列 航空航天材料规范 高温测定法》.pdfASD-STAN TR AMS2750 FRENCH-2009 《航空航天系列 航空航天材料规范 高温测定法》.pdf
  • ASD-STAN TR 9536-2008 Aerospace series Declarable Substances Recommended Practice《航空航天系列 需申报物质 建议做法》.pdfASD-STAN TR 9536-2008 Aerospace series Declarable Substances Recommended Practice《航空航天系列 需申报物质 建议做法》.pdf
  • ASD-STAN TR 9535-2008 Aerospace series Substance declaration (Edition 1)《航空航天系列 物质声明 第1版》.pdfASD-STAN TR 9535-2008 Aerospace series Substance declaration (Edition 1)《航空航天系列 物质声明 第1版》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASD

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1