《ASTM C1214-2013 Standard Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method《负压(真空)试验法测定混凝土管下水道的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1214-2013 Standard Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method《负压(真空)试验法测定混凝土管下水道的标准试验方法》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1214 02 (Reapproved 2009)C1214 13Standard Test Method forConcrete Pipe Sewerlines by Negative Air Pressure(Vacuum) Test Method1This standard is issued under the fixed designation C1214; the number immediately following the designation indicates the year oforiginal adoption or, in the c
2、ase of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers procedures for testing concrete pipe sewerlines, when using the n
3、egative air pressure (vacuum) testmethod to demonstrate the integrity of the installed material and the construction procedures. This test method covers testing of4 to 36-in. diameter circular concrete pipe sewerlines utilizing gasketed joints.NOTE 1The user of this test method is advised that metho
4、ds described herein may also be used as a preliminary test to enable the manufacturer orinstaller to demonstrate the condition of sewer pipe prior to delivery or backfill. Minimum test times presented in Table 1 are for pipelines. Holding timesfor testing an individual pipe may have to be increased
5、to allow for the accumulation of leakage when the tested pipe are incorporated into a continuouspipeline.NOTE 2The user of this test method is advised that the negative air pressure (vacuum) test criteria presented in this test method are similar to thosein general use. The test and criteria have be
6、en used widely and successfully in testing smaller diameter pipe. Larger pipe will be accepted moreconveniently by visual inspection and individual joint testing.NOTE 3The user of this test method is advised that no correlation has been found between loss of vacuum and water leakage.Test times tabul
7、atedand the rate of air loss in this standard are based on successful testing of installed pipelines. However, since air and water have different physicalproperties, retests of some pipelines not meeting field air tests have been successful when tested with water.1.2 This test method is the inch-pou
8、nd companion to Test Method C1214M; therefore, no SI equivalents are presented in thetest method.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health
9、practices and determine the applicability of regulatorylimitations prior to use. See Section 6 for specific safety precautions.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and Related ProductsC924 Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure
10、 Air Test MethodC969 Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines3. Terminology3.1 DefinitionsFor definitions of terms relating to concrete pipe, see Terminology C822.4. Summary of Test Method4.1 The sewerline to be tested is plugged. A
11、ir is removed from the plugged line by a vacuum pump or vacuum reservoir. Theamount of vacuum loss is used to determine the acceptability of the sewerline.5. Significance and Use5.1 This is not a routine test. The values recorded are applicable only to the sewer being tested and at the time of testi
12、ng.6. Safety Precautions6.1 WarningThe user of this test method is advised that this test may be dangerous if a line is not prepared properly andproper procedures are not followed.WarningThe user of this test method is advised that this test may be dangerous if a line isnot prepared properly and pro
13、per procedures are not followed.1 This test method is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved June 1, 2009July 1, 2013. Published July 2009December 2013. Originally approved in 1
14、992. Last previous edition approved in 20022009 asC1214 02.C1214 02 (2009). DOI: 10.1520/C1214-02R09.10.1520/C1214-13.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to
15、 the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes
16、 accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. Unite
17、d States16.2 Access manholes or structures must be ventilated and air quality continuously monitored.6.3 No one shall be allowed in or near the manholes during testing.7. Preparation of the Sewerline7.1 Where practical, clean the line prior to testing, wet the pipe surface, and eliminate debris.NOTE
18、 4The user of this test method is advised that a wetted exterior pipe surface is desirable and will produce more consistent test results. Air maypass through the walls of dry pipe. This can be overcome by wetting the pipe. Usually, moisture absorbed from the backfill is sufficient to cope with thiss
19、ituation. If the problem persists, segmental testing of the line will establish if there is a significant leak.7.2 Plug all pipe outlets including laterals. Review safety precautions in Section 6.8. Procedure8.1 Determine the test time for the sewerline to be tested by using Table 1. Table 1 has bee
20、n established using the criteriaspecified in Table 2 and the formulas contained in the Appendixes. The test time is the time required for the vacuum to drop from7 to 5 in. of mercury. (WarningMercury has been designated by EPA and many state agencies as a hazardous material that cancause central ner
21、vous system, kidney and liver damage. Mercury, or its vapor, may be hazardous to health and corrosive tomaterials. Caution should be taken when handling mercury and mercury containing products. See the applicable product MaterialSafety Data Sheet (MSDS) for details and EPAs websitehttp:/www.epa.gov/
22、mercury/faq.htmfor additional information.Users should be aware that selling mercury and/or mercury containing products into your state may be prohibited by state law.)NOTE 5To provide satisfactory test results, the vacuum pump shall be capable of evacuating the sewer test section in the required te
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
最后一页预览完了!喜欢就下载吧,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC12142013STANDARDTESTMETHODFORCONCRETEPIPESEWERLINESBYNEGATIVEAIRPRESSUREVACUUMTESTMETHOD 真空 试验 测定

链接地址:http://www.mydoc123.com/p-463778.html