ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf

上传人:proposalcash356 文档编号:538390 上传时间:2018-12-07 格式:PDF 页数:8 大小:163.53KB
下载 相关 举报
ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf_第1页
第1页 / 共8页
ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf_第2页
第2页 / 共8页
ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf_第3页
第3页 / 共8页
ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf_第4页
第4页 / 共8页
ASTM F2322-2012 Standard Test Methods for Physical Assault on Vertical Fixed Barriers for Detention and Correctional Facilities《拘留和教养设施用垂直固定障碍身体攻击的标准试验方法》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: F2322 12Standard Test Methods forPhysical Assault on Vertical Fixed Barriers for Detentionand Correctional Facilities1This standard is issued under the fixed designation F2322; the number immediately following the designation indicates the year oforiginal adoption or, in the case of rev

2、ision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 These test methods cover requirements for simulatedservice tests and testing equipment for determin

3、ing the perfor-mance characteristics of walls designed to incarcerate inmatesin detention and correctional institutions. The testing equip-ment provides for the setup and testing of two sample fixedbarriers side-by-side, one with no openings and one equippedwith a representative penetration in accor

4、dance with theAmerican Correctional Association (ACA) standard for clearview area of 3 ft2(0.279 m2), 12 in. (305 mm) wide by 36 in.(914 mm) high.1.2 It is the intent of these test methods to help ensure thatdetention security walls perform at or above minimum accept-able levels to control passage o

5、f unauthorized or secure areas,to confine inmates, to delay and frustrate escape attempts, andto resist vandalism. It is recognized that in order to meet theintent of these test methods, opening assemblies within thesewalls must be compatible with the level of performancerequired by: Test Methods F1

6、450, F1592, and F1643.1.3 These test methods apply to walls enclosing or separat-ing secure areas of detention/correctional facilities.1.4 The values stated in inch-pound units are to be regardedas the standard. The SI values given in parentheses areapproximate and for information only.1.5 This stan

7、dard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 A

8、STM Standards:2F1450 Test Methods for Hollow Metal Swinging DoorAssemblies for Detention and Correctional FacilitiesF1592 Test Methods for Detention Hollow Metal VisionSystemsF1643 Test Methods for Detention Sliding Door LockingDevice AssemblyF1915 Test Methods for Glazing for Detention Facilities2.

9、2 UL Standard:UL-752 Bullet Resisting Equipment32.3 ANSI Standard:ANSI/HMMA 863 Guide Specifications for Detention Se-curity Hollow Metal Doors and Frames43. Terminology3.1 Definitions:3.1.1 detention securityassurance of the restriction ofmobility of inmates to designated areas within a correctiona

10、l ordetention facility.3.1.2 forcible egressan opening created in the test wallwhich allows a 5 in. (127 mm) by 8 in. (203 mm) by 8 in. (203mm) rigid rectangular box to be passed through it with no morethan 10 lbf (44.5 N) of force.3.1.3 manufacturerthe party responsible for the construc-tion, fabri

11、cation, or supply of the test samples or componentsused to construct the test samples.3.1.4 performance characteristicthe response of the wallin any one of the tests described herein.3.1.5 test completionconduct one test sequence for eachwall.3.1.6 testing laboratoryan independent third party mate-r

12、ials testing laboratory.4. Significance and Use4.1 A major concern for administrative officials is thesecurity of barriers used in detention/correctional facilities.These test methods are designed to aid in identifying levels ofphysical security for walls which enclose or separate secureareas. This

13、does not apply to the passage of contraband.4.2 These test methods are not intended to provide ameasure of resistance for a wall subjected to attack by1These test methods are under the jurisdiction of ASTM Committee F33 onDetention and Correctional Facilities and are the direct responsibility of Sub

14、com-mittee F33.02 on Physical Barriers.Current edition approved June 1, 2012. Published June 2012. Last previousedition approved in 2003 as F2322 03 which was withdrawn January 2012 andreinstated in June 2012. DOI: 10.1520/F2322-12.2For referenced ASTM standards, visit the ASTM website, www.astm.org

15、, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from Underwriters Laboratories (UL), Corporate Progress, 333Pfingsten Rd., Northbrook, IL 60062.4Available from Americ

16、an National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.corrosive agents, by high-powered rifles, explosives, sawing,or other such methods. These test metho

17、ds are intended toevaluate the resistance of a wall to violent attacks by sustainedmanpower using battering devices, such as benches, bunks, ortables, and by handguns up to and including .44 magnum.Attacks from the outside and fire resistance ratings are notaddressed in this standard.4.3 The primary

18、 purpose or result of these test methods is toapproximate the levels of abuse to which walls will potentiallybe subjected in the field. The desired result of its use is to helpprovide assurance of protection to the public, to facilityadministrative personnel, and to the inmates themselves.4.4 It is

19、recommended that detention/correctional facilityadministration provide adequate training, supervision, andpreventative maintenance programs to enable walls to functionas intended throughout the expected service life.5. Sampling5.1 Sample wall shall be constructed in accordance with 6.1.5.2 Test repo

20、rts shall include complete details of the testsamples, details, photographs, or a combination thereof, of thetesting apparatus and installation or construction instructions(see Section 9).5.3 In the event of failure in one or more of the performancetests, the manufacturer shall provide another compl

21、ete testsample or shall continue testing in another location on the wall,subject to the direction of the testing laboratory.6. Specimen Preparation6.1 Construction:6.1.1 The construction of the test wall shall be representa-tive of the wall as it will be placed in service.6.1.2 Required results indi

22、cated in Table 1 are based upon asample size of 8 ft (2438 mm) high by 8 ft (2438 mm) wide 64 in. (102 mm).6.2 Impact Test Fixture:6.2.1 The test wall support fixture shall simulate the rigiditynormally provided to a wall in a building by the ceiling, floor,and adjoining walls (Figs. 1-4). The inclu

23、sion of load bearingconditions on the test wall is at the manufacturers option.6.2.2 The fixture is designed to accommodate two testsamples; however, it is permissible to construct a test fixturethat accommodates one sample only, if the manufacturer sochooses.6.2.3 Description of the Test WallThe te

24、st wall shall beconstructed and mounted in a vertical wall test fixture and shallbe supported as described in 6.2.1 throughout the testingprocedure. The wall specification shall be included as part ofthe test report.6.3 Wall Construction or Mounting for Impact Testing:6.3.1 Construct or install the

25、test walls as shown in Figs.1-4. Position the impact test ram on the outside of the fixture inpreparation to administer the series of impacts described in 7.2.7. Procedures7.1 Bullet Penetration:7.1.1 ScopeThis test is designed to evaluate the capabilityof a test wall to resist the ballistic attack

26、of a .44 magnum(Level 3) handgun.7.1.2 Significance and UseThis test is intended to simu-late a field situation whereby one or more firearms are beingused to attack a fixed barrier. The handgun is considered themost reasonably attainable firearm and the calibre, .44 mag-num, is considered to be the

27、most powerful that will potentiallybe reasonably attainable during a mass disturbance or riotwithin a detention or correctional facility.7.1.3 When specified by the contract documents of adetention/correctional facility project, the wall samples forbullet penetration shall be tested in accordance wi

28、th StandardUL-752.Arepresentative sample based upon the wall construc-tion under investigation shall be tested. Minimum size shall be3 ft, 0 in. (914 mm) by 3 ft, 0 in. (914 mm).7.1.4 The level of performance shall meet the rating .44magnum, Level 3.7.1.5 The pass/fail criteria shall be in accordanc

29、e withStandard UL-752.7.2 Wall System Impact Test:7.2.1 ScopeThis test method is designed to evaluate thecapability of a complete test wall to resist repetitive impactforces at the designated critical areas.7.2.2 Significance and Use:7.2.2.1 This test method is intended to closely simulate asustaine

30、d battering ram style attack and provide an evaluationof the capability of the assembly to prevent, delay, and frustrateescape or access, or both, to unauthorized areas. The test shallbe permitted to be used to aid in identifying a level of physicalsecurity for various configurations of walls.7.2.2.

31、2 An impact test of this design performed on acomplete test wall evaluates the impact fatigue strength and thequality of construction and fabrication techniques as well as thestrengths of materials used.7.2.3 Apparatus:7.2.3.1 The steel impact ram shall be equipped to beincorporated into a hinged or

32、 pivoted swinging pendulumsystem that is capable of delivering the required impact energyof 200 ft-lbf (271.2 J) to the test wall. The combined weight ofthe impact ram (Fig. 5) and either the blunt or the sharpimpactor (see Figs. 6 and 7) shall be 80 lb (36.3 kg) 6 0.25 lb(0.10 kg). The drop height

33、(Fig. 1) of the ram shall be 31 in.(762 mm) 6 1 in. (25.4 mm) to create the required impactenergy at the bottom of the arc and at the point of contact withthe test wall. The angle of the suspension cables, rods, arm orchains shall be no greater than 45 off vertical when the ram isin the raised posit

34、ion.All pivot points in the suspension systemmust be in good repair and well lubricated to minimize frictionlosses that could reduce the impact energy being delivered tothe test sample.TABLE 1 Security Grades and Impact Load RequirementsGradeNo.Number ofImpactsARepresentative BarrierDuration Time(se

35、e X4.1)1 600 60 min.2 400 40 min.3 200 20 min.4 100 10 min.ANumber of impacts equally divided between blunt impactor (first sequence)and sharp impactor, applied in cyclic sequences of 50 impacts each.F2322 1227.2.3.2 Large Blunt ImpactorThe large blunt impactorshall be fabricated from C1010-C1020 ca

36、rbon steel and shallbe attachable to the steel impact ram in accordance with Fig. 6.The striking surface of the impactor shall have a surface areaFIG. 1 Fixture and Test Wall PanelsSide ViewFIG. 2 Fixture and Test Wall PanelsFront ViewF2322 123of 4 6 0.04 in.2(101.6 6 1.02 mm2) and shall have rounde

37、dedges similar to a 10 lb (4.54 kg) sledgehammer head.7.2.3.3 Sharp ImpactorThe sharp impactor shall be fab-ricated from C1010-C1020 carbon steel and shall be attachableFIG. 3 Section A-A from Fig. 2FIG. 4 Section B-B from Fig. 2F2322 124to the steel impact ram in accordance with Fig. 7. Thesharpnes

38、s of the impact point shall be similar to the end of anew Firemans axe at the beginning of the test sequence.7.2.4 Procedure:7.2.4.1 With the test fixture and test apparatus, deliver theseries of impacts listed in Table 1 to the test wall.7.2.4.2 Construct or mount two 8 ft (2438 mm) high by 8 ft(24

39、38 mm) 6 4 in. (102 mm) wide test wall panels supportedon all four sides in each half of the wall test fixture illustratedin Fig. 2. If the wall design requires control joints or seams,one will be included in the test wall for the purpose of testing.7.2.4.3 Construct one of the wall panels with no o

40、peningsand the other wall panel with a monolithic steel impact panel,acting as a simulated window, installed using anchoringtechniques suitable to the wall construction and consistent withANSI/HMMA-863. The clear opening size shall be: 12 in. (305mm) wide by 36 in. (914 mm) high.7.2.4.4 Apply the re

41、quired number of impacts in accordancewith Table 1 to the test panel #1. If there are no predicted weakpoints in the solid panel, apply the impacts to a target area tobe selected by the test agent at the time of the test. If there arepredicted weak points such as seams, unsupported edges, orother ty

42、pes of wall joints, apply the impacts at one of thoselocations. Repeatability of impact location during each seriesshall be 62 in. (50 mm) horizontally and vertically from thedesignated impact target. Using the test apparatus in accor-dance with 7.2.3, begin the series of strikes against the selecte

43、dtarget area of the test wall for the number of required impacts,first with the blunt impactor followed by the sharp impactor onthe pendulum in cyclic sequences of 50 impacts each. Therequired impact energy for the blunt impactor is 200 ft-lbf(271.2 J) per impact and the required impact energy for t

44、hesharp impactor is 100 ft-lbf (135.6 J) per impact. During thetest, reposition the pendulum as necessary to produce themaximum possible duress on the test wall, leading to wallfailure. The time for repositioning and change of impact headsis not to be included in the test duration time. Record thenu

45、mber of strikes required to produce the first penetration ofthe panel, and the number of strikes required to produce anopening large enough to achieve forcible egress.NOTETo prevent shifting during test procedures, any material added inside or outside the ram to satisfy the weight requirement shall

46、be rigidlyattached.FIG. 5 Steel Impact RamFIG. 6 Large Blunt ImpactorF2322 1257.2.4.5 Apply the required number of impacts in accordancewith Table 1 to the test panel #2, which is equipped with theimpact panel. Apply the prescribed number of impacts at acorner of the impact panel. The corner to be t

47、ested shall beselected by the testing laboratory at the time of the test.Repeatability of impact location during each series shall be 62in. (50 mm) horizontally and vertically from the designatedimpact target. Using the test apparatus in accordance with7.2.3, begin the series of strikes against the

48、selected target areaof the test wall for the number of required impacts, first withthe blunt impactor followed by the sharp impactor on thependulum in cyclic sequences of 50 impacts each. The requiredimpact energy for the blunt impactor is 200 ft-lbf (271.2 J) perimpact; and the required impact ener

49、gy for the sharp impactoris 100 ft-lbf (135.6 J) per impact. During the test, reposition thependulum as necessary to produce the maximum possibleduress on the test wall, which is predicted to lead to wallfailure. Record the number of strikes required to produce thefirst penetration of the wall, and the number of strikes requiredto produce an opening large enough to achieve forcible egress.7.2.4.6 The wall must remain in place throughout the testingprocedure. Failure is constituted by the wall being damaged tothe extent that forcible egress can be achieved.7.2