AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf

上传人:dealItalian200 文档编号:541817 上传时间:2018-12-08 格式:PDF 页数:26 大小:328.63KB
下载 相关 举报
AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf_第1页
第1页 / 共26页
AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf_第2页
第2页 / 共26页
AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf_第3页
第3页 / 共26页
AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf_第4页
第4页 / 共26页
AWS B2 1-4-221-1999 Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybde.pdf_第5页
第5页 / 共26页
亲,该文档总共26页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Site LicenseStandard Welding ProcedureSpecification (SWPS) forAWS B2.1-4-221:1999 (R2009)An American National StandardGasTungsten ArcWelding (ConsumableInsert Root) followedby Shielded Metal ArcWelding of Chromium-Molybdenum Steel(M-4/P-4, Group 1 or 2),1/8 through 1/2 in.Thick,As-Welded Condition;

2、1/8through 1-1/2 in.Thick,PWHT Condition, IN515,and E8018-B2,Primarily Pipe ApplicationsER80S-B2,550 N.W. LeJeune Road, Miami, FL 33126AWS B2.1-4-221:1999 (R2009)An American National StandardApproved by theAmerican National Standards InstituteDecember 8, 1999Reaffirmed: May 29, 2009Standard Welding

3、Procedure Specification (SWPS) forGas Tungsten Arc Welding (Consumable Insert Root)followed by Shielded Metal Arc Welding ofChromium-Molybdenum Steel (M-4/P-4, Group 1 or 2),1/8 through 1/2 in. Thick, As-Welded Condition;1/8 through 1-1/2 in. Thick, PWHT Condition, IN515,ER80S-B2, and E8018-B2, Prim

4、arily Pipe Applications1st EditionPrepared by theAmerican Welding Society (AWS) B2 Committee on Procedure and Performance QualificationUnder the Direction of theAWS Technical Activities CommitteeApproved by theAWS Board of DirectorsAbstractThis standard contains the essential welding variables for c

5、hromium-molybdenum steel in the thickness range of 1/8 through1/2 in. in the as-welded condition; or 1/8 through 1-1/2 in. in the postweld heat treated (PWHT) condition, using manualgas tungsten arc welding with a consumable insert root, followed by shielded metal arc welding. It cites the base meta

6、lsand operating conditions necessary to make the weldment, the filler metal specifications, and the allowable joint designsfor groove welds. This standard welding procedure specification (SWPS) was developed primarily for pipe applications.iiAWS B2.1-4-221:1999 (R2009)International Standard Book Num

7、ber: 0-87171-596-1American Welding Society550 N.W. LeJeune Road, Miami, FL 33126 2000 by American Welding SocietyAll rights reservedPrinted in the United States of AmericaReaffirmed: May 29, 2009iiiAWS B2.1-4-221:1999 (R2009)Statement on the Use of American Welding Society StandardsAll standards (co

8、des, specifications, recommended practices, methods, classifications, and guides) of the AmericanWelding Society (AWS) are voluntary consensus standards that have been developed in accordance with the rules of theAmerican National Standards Institute (ANSI). When AWS American National Standards are

9、either incorporated in, ormade part of, documents that are included in federal or state laws and regulations, or the regulations of other govern-mental bodies, their provisions carry the full legal authority of the statute. In such cases, any changes in those AWSstandards must be approved by the gov

10、ernmental body having statutory jurisdiction before they can become a part ofthose laws and regulations. In all cases, these standards carry the full legal authority of the contract or other documentthat invokes the AWS standards. Where this contractual relationship exists, changes in or deviations

11、from requirementsof an AWS standard must be by agreement between the contracting parties.AWS American National Standards are developed through a consensus standards development process that bringstogether volunteers representing varied viewpoints and interests to achieve consensus. While the AWS adm

12、inisters theprocess and establishes rules to promote fairness in the development of consensus, it does not independently test, evalu-ate, or verify the accuracy of any information or the soundness of any judgments contained in its standards.AWS disclaims liability for any injury to persons or to pro

13、perty, or other damages of any nature whatsoever, whetherspecial, indirect, consequential, or compensatory, directly or indirectly resulting from the publication, use of, or relianceon this standard. AWS also makes no guarantee or warranty as to the accuracy or completeness of any informationpublish

14、ed herein.In issuing and making this standard available, AWS is neither undertaking to render professional or other services for oron behalf of any person or entity, nor is AWS undertaking to perform any duty owed by any person or entity to someoneelse. Anyone using these documents should rely on hi

15、s or her own independent judgment or, as appropriate, seek theadvice of a competent professional in determining the exercise of reasonable care in any given circumstances. It isassumed that the use of this standard and its provisions are entrusted to appropriately qualified and competent personnel.T

16、his standard may be superseded by the issuance of new editions. Users should ensure that they have the latest edition.Publication of this standard does not authorize infringement of any patent or trade name. Users of this standard acceptany and all liabilities for infringement of any patent or trade

17、 name items. AWS disclaims liability for the infringement ofany patent or product trade name resulting from the use of this standard.Finally, the AWS does not monitor, police, or enforce compliance with this standard, nor does it have the power to do so.On occasion, text, tables, or figures are prin

18、ted incorrectly, constituting errata. Such errata, when discovered, are postedon the AWS web page (www.aws.org).Official interpretations of any of the technical requirements of this standard may only be obtained by sending a request, inwriting, to the appropriate technical committee. Such requests s

19、hould be addressed to the American Welding Society,Attention: Managing Director, Technical Services Division, 550 N.W. LeJeune Road, Miami, FL 33126 (see Annex A).With regard to technical inquiries made concerning AWS standards, oral opinions on AWS standards may be rendered.These opinions are offer

20、ed solely as a convenience to users of this standard, and they do not constitute professionaladvice. Such opinions represent only the personal opinions of the particular individuals giving them. These individuals donot speak on behalf of AWS, nor do these oral opinions constitute official or unoffic

21、ial opinions or interpretations ofAWS. In addition, oral opinions are informal and should not be used as a substitute for an official interpretation.This standard is subject to revision at any time by the AWS B2 Committee on Procedure and Performance Qualification.It must be reviewed every five year

22、s, and if not revised, it must be either reaffirmed or withdrawn. Comments (recom-mendations, additions, or deletions) and any pertinent data that may be of use in improving this standard are requiredand should be addressed to AWS Headquarters. Such comments will receive careful consideration by the

23、 AWS B2Committee on Procedure and Performance Qualification and the author of the comments will be informed of theCommittees response to the comments. Guests are invited to attend all meetings of the AWS B2 Committee on Procedureand Performance Qualification to express their comments verbally. Proce

24、dures for appeal of an adverse decisionconcerning all such comments are provided in the Rules of Operation of the Technical Activities Committee. A copy ofthese Rules can be obtained from the American Welding Society, 550 N.W. LeJeune Road, Miami, FL 33126.ivAWS B2.1-4-221:1999 (R2009)Personnel (Rea

25、ffirmation)AWS B2 Committee on Procedure and Performance QualificationJ. J. Fluckiger, Chair Idaho National LaboratoryJ. L. Cooley, Vice Chair J. C. and Associates, IncorporatedE. W. Beckman, 2nd Vice Chair International Training Institute S. Morales, Secretary American Welding SocietyL. P. Connor C

26、onsultantW. D. Doty Doty and Associates, IncorporatedE. H. Gray U.S. Nuclear Regulatory CommissionB. J. Hable Ford Motor CompanyM. Herrle Arise, IncorporatedR. A. LaFave Elliott Company, IncorporatedK. Y. Lee The Lincoln Electric CompanyK. M. McTague Factory MutualA. S. Olivares HSB Global Standards

27、J. F. Pike NASA Langley Research CenterW. M. Ruof Bechtel Plant Machinery, IncorporatedJ. J. Sekely Welding Services, IncorporatedM. R. Stone Canadian Welding BureauG. M. Wisbrock Lockheed Martin Missiles and Fire Control (Retired)R. K. Wiswesser Welder Training and Testing InstituteAdvisors to the

28、AWS B2 Committee on Procedure and Performance QualificationW. L. Ballis ConsultantJ. D. Duncan ConsultantN. K. Kanaya BEAR Testing LaboratoryB. B. MacDonald ConsultantA. W. Sindel Alstom Power, IncorporatedC. E. Speader, Jr. Aristech Chemical CorporationW. J. Sperko Sperko Engineering ServicesR. F.

29、Waite ConsultantAWS B2D Subcommittee on Standard Welding Procedure SpecificationsJ. J. Sekely, Chair Welding Services, IncorporatedS. Morales, Secretary American Welding SocietyL. P. Connor ConsultantW. D. Doty Doty and Associates, IncorporatedJ. J. Fluckiger Idaho National LaboratoryK. M. McTague F

30、actory MutualW. M. Ruof Bechtel Plant Machinery, IncorporatedAdvisor to the AWS B2D Subcommittee on Standard Welding Procedure SpecificationsG. M. Wisbrock Lockheed Martin Missiles and Fire Control (Retired)vAWS B2.1-4-221:1999 (R2009)Personnel (Original)*AdvisorAWS B2 Committee on Procedure and Per

31、formance QualificationJ. J. Sekely, Chair Eichleay CorporationG. M. Wisbrock, 1st Vice Chair Lockheed Martin Missiles and Fire ControlJ. J. Fluckiger, 2nd Vice Chair Bechtel Babcock 1/8 through 1-1/2 in. Thick, PWHT Condition,IN515, ER80S-B2, and E8018-B2, Primarily Pipe Applications, but is include

32、d for informational purposes only.The American Welding Society and the Welding Research Council have joined in a cooperative effort to generatestandard welding procedures for industry. The need for pretested welding procedures that are supported by adequate testdata and that satisfy the technical re

33、quirements for the commonly used construction codes and specifications has beenexpressed by many individuals and organizations. The purpose of a welding procedure qualification is to provide test datafor assessing the properties of a weld joint.This Welding Procedure Specification is an outgrowth of

34、 the coordinated work of the Welding Procedures Committee ofthe Welding Research Council and the AWS B2 Committee on Welding Procedure and Performance Qualification. TheWelding Procedures Committee has provided the test data documented by a Summary of Procedure Qualification Records.The welding term

35、s used in this specification shall be interpreted in accordance with the definitions given in the latestedition of AWS A3.0, Standard Welding Terms and Definitions, Including Terms for Adhesive Bonding, Brazing, Soldering,Thermal Cutting, and Thermal Spraying.The AWS Committee on Welding Procedure a

36、nd Performance Qualification was formed in 1979 to provide weldingstandards concerning the subject of qualification. The primary document developed by this committee is AWS B2.1,Specification for Welding Procedure and Performance Qualification. This document established the foundation andframework f

37、or Standard Welding Procedure Specifications.Comments and suggestions for the improvement of this standard are welcome. They should be sent to the Secretary,AWS B2 Committee on Welding Procedure and Performance Qualification, American Welding Society, 550 N.W.LeJeune Road, Miami, FL 33126.AWS B2.1-4

38、-221:1999 (R2009)Page 1 of 18Standard Welding Procedure Specification (SWPS)Permission to reproduce for intra-company use only is granted by the American Welding SocietyGas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybdenum Steel,(M-4/P-4, Gro

39、up 1 or 2), 1/8 through 1/2 in. Thick, As-Welded Condition;1/8 through 1-1/2 in. Thick, PWHT Condition, IN515, ER80S-B2,and E8018-B2, Primarily Pipe ApplicationsWelding Research CouncilSupporting PQR Numbers: 200714, 200715, 200734, 200735, 200736, 200737, 200738, 200739, 200756, 200757, 200758, 200

40、759, 200760, 200761, 200762, 200814, 200815, 200816, 200817, 200818, 200823, 200824, 200828, 200829, 200830, 200831, 200844, 200845Requirements forApplication of SWPSsScope. The data to support this Standard WeldingProcedure Specification (SWPS) were derived fromthe above-listed Procedure Qualificat

41、ion Records(PQRs) which were reviewed and validated underthe auspices of the Welding Research Council. ThisSWPS is not valid using conditions and variablesoutside the ranges listed. The American WeldingSociety considers that this SWPS presents infor-mation for producing an acceptable weld using thec

42、onditions and variables listed. The user needs asignificant knowledge of welding and accepts fullresponsibility for the performance of the weld andfor providing the engineering capability, qualifiedpersonnel, and proper equipment to implement thisSWPS.Application. This SWPS is to be used only asperm

43、itted by the applicable fabrication document(s);such as code, specification, or contract docu-ment(s). The fabrication document(s) should specifythe engineering requirements such as design, needfor heat treatment, fabricating tolerances, qualitycontrol, and examination and tests applicable to theend

44、 product.Users Responsibility. An SWPS does not replaceor substitute for fabrication codes, specifications,contract requirements, or capability and judgmenton the part of the user. An SWPS is to be used onlyas permitted by the applicable fabrication code,specification, or contract document.The abili

45、ty to produce production welds havingproperties suitable for the application depends uponsupplementing the SWPS with appropriate perfor-mance qualification tests and sound engineeringjudgment. The user is responsible for the quality andperformance of the final product in accordance withthe provision

46、s of the fabrication document(s).Supplementary Instructions. To adapt this SWPSto a specific application, a user may issue supple-mentary instructions. Such instructions may consistof tighter fit-up tolerances, higher minimum preheattemperature or any other instructions necessary toproduce a weldmen

47、t that meets the requirements ofthe fabrication document(s). These instructions shallnot be less restrictive than provided in the SWPS.Safety. Safety precautions shall conform to thelatest edition of ANSI Z49.1, Safety in Welding,Cutting, and Allied Processes, published by theAmerican Welding Societ

48、y.This specification may involve hazardous materials,operations, and equipment. The specification doesnot purport to address all of the safety problemsassociated with its use. It is the responsibility of theuser to establish appropriate safety and health prac-tices. The user should determine the app

49、licability ofany regulatory limitations prior to use.AWS B2.1-4-221:1999 (R2009)Page 2 of 18Standard Welding Procedure Specification (SWPS)Permission to reproduce for intra-company use only is granted by the American Welding SocietyLIMITATIONSThis procedure is not qualified for notch toughness applications.This procedure is not applicable for fillet welds.WELDING PROCESSESWelding Processes: Gas Tungsten Arc Welding (GTAW) (Consumable Insert Root) followed byShielded Metal Arc Welding (SMAW)Method of Application: ManualBASE METALSBase Metal:1Low-alloy steel, M-4 or P-4, Group 1 or 2 to M-4

展开阅读全文
相关资源
猜你喜欢
  • ASTM E1154-1989(2003) Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置用标准规范》.pdf ASTM E1154-1989(2003) Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置用标准规范》.pdf
  • ASTM E1154-1989(2008) Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置用标准规范》.pdf ASTM E1154-1989(2008) Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置用标准规范》.pdf
  • ASTM E1154-2014 Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置的标准规格》.pdf ASTM E1154-2014 Standard Specification for Piston or Plunger Operated Volumetric Apparatus《活塞或柱塞操作的容量测量装置的标准规格》.pdf
  • ASTM E1155-1996(2001) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers《使用F-数字制测定楼板平正度和水平度的试验方法》.pdf ASTM E1155-1996(2001) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers《使用F-数字制测定楼板平正度和水平度的试验方法》.pdf
  • ASTM E1155-1996(2008) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers 《使用F-数字制测定楼板平正度和水平度的标准试验方法》.pdf ASTM E1155-1996(2008) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers 《使用F-数字制测定楼板平正度和水平度的标准试验方法》.pdf
  • ASTM E1155-2014 Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers《测定地坪平面度(FF)和地坪水平度(FL)的标准试验方法》.pdf ASTM E1155-2014 Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers《测定地坪平面度(FF)和地坪水平度(FL)的标准试验方法》.pdf
  • ASTM E1155M-1996(2001) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers [Metric]《使用F-数字制测定楼板平正度和水平度的试验方法(米制)》.pdf ASTM E1155M-1996(2001) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers [Metric]《使用F-数字制测定楼板平正度和水平度的试验方法(米制)》.pdf
  • ASTM E1155M-1996(2008) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers [Metric] 《测定地坪平面度(FF)和地坪水平度(FL)的试验方法(米制)》.pdf ASTM E1155M-1996(2008) Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers [Metric] 《测定地坪平面度(FF)和地坪水平度(FL)的试验方法(米制)》.pdf
  • ASTM E1155M-2014 Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers &40 Metric&41 《测定地坪平面度(FF)和地坪水平度(FL)的标准试验方法(米制)》.pdf ASTM E1155M-2014 Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers &40 Metric&41 《测定地坪平面度(FF)和地坪水平度(FL)的标准试验方法(米制)》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1