BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf

上传人:terrorscript155 文档编号:547314 上传时间:2018-12-09 格式:PDF 页数:52 大小:3.51MB
下载 相关 举报
BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf_第1页
第1页 / 共52页
BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf_第2页
第2页 / 共52页
BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf_第3页
第3页 / 共52页
BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf_第4页
第4页 / 共52页
BS 8243-2010 Installation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions - Code of practice《用于产生确认的警报条件的入侵和截留警报系统的安装和配置 实施规.pdf_第5页
第5页 / 共52页
亲,该文档总共52页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationInstallation and configuration of intruder and hold-up alarm systems designed to generate confirmed alarm conditions Code of practiceBS 8243:20null0Licensed Copy: Wang Bin, ISO/E

2、XCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSIBS 8243:2010 BRITISH STANDARDnullunulllishing and copyright informationThe BSI copyright notice displayed in this docnullnullent indicates nullhen the docnullnullent nullas last issnullednullnull BSI 2010ISBN nullnull8 0 null80 nul

3、lnullnullnullnull 2InullS 13null310The nullollonulling BSI renullerences relate to the nullornull on this standard: nullonullnullittee renullerence nullnullnull1 Dranullt nullor conullnullent 0nullnull301nullnullnullnull0 Dnullnullunulllication historynullirst pnullnulllished as DD 243 nullannullary

4、 1nullnull8nullirst renullisionnull Nonullenullnuller 1nullnullnullSecond renullisionnull nullannullary 2002Third renullisionnull 1null Decenullnuller 2004nullirst pnullnulllished as BS 8243null nullay 2010nullmendments issued since punulllicationnullate nullenullt affected Licensed Copy: Wang Bin,

5、ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSInull BSI 2010 null iBS 8243:2010BRITISH STANDARDContentsnullorenullord iiinull Scope 12 Nornullatinulle renullerences 13 Ternullsnull denullnitions and anullnullrenulliations 14 nullrinullary design and connullgnullration onul

6、lnullectinulles 5null Designnull installation and connullgnullration onull InullHASs incorporating alarnull connullrnullation technology 8null nullther nulleans onull nullininullinulling nullalse alarnulls nullor InullHAS 14null Handling onull alarnull innullornullation nully alarnull receinulling c

7、entres nullARnullsnull 19nullnnenullesAnnenull A nullnornullatinullenull nullnullrther reconullnullendations nullor designnullinstallation and connullgnullration onull IASs incorporating alarnullconnullrnullation technology 25Annenull B nullinnullornullatinullenull Alarnull receinulling centre nullA

8、Rnullnull alarnull handling procednullre nullor alarnull signals associated nullith transnullission nullanulllt signals 28Annenull null nullinnullornullatinullenull Alarnull receinulling centre nullARnullnull procednullres nullor handling tnullo transnullission nullanulllt signals 29Annenull D nulli

9、nnullornullatinullenull nullperational reconullnullendations nullor an InullHAS enullnullipped nullith senullnullential connullrnullation technology 30Annenull null nullinnullornullatinullenull Alarnull receinulling centre nullARnullnull procednullres nullor alarnull systenulls capanullle onull pron

10、ulliding connullrnullation 31Annenull null nullinnullornullatinullenull Innullornullation to nulle inclnullded in the systenulldesign proposal and asnullnulltted docnullnullent 34Annenull null nullinnullornullatinullenull Tinulling diagranulls 35Annenull H nullnornullatinullenull Reconullnullendatio

11、ns nullor control and indicating enullnullipnullent nullnullInullnull 37Binullliography 43nullist of figuresnullignullre Bnull1 null nullnullanullple onull alarnull handling procednullre nullor alarnull signals associated nullith transnullission nullanulllt signals 28nullignullre nullnull1 null null

12、nullanullple onull procednullre nullor handling tnullo transnullission nullanulllt signals 29nullignullre Dnull1 null nullnullanullple onull operational renullnullirenullents nullor an InullHAS enullnullipped nullith senullnullential connullrnullation technology 30nullignullre nullnull1 null nullnul

13、lanullple onull alarnull handling procednullre nullor anulldio connullrnullation alarnull systenulls 31nullignullre nullnull2 null nullnullanullple onull alarnull handling procednullre nullor nullisnullal connullrnullation alarnull systenulls 32nullignullre nullnull3 null nullnullanullple onull alar

14、null handling procednullre nullor senullnullential connullrnullation alarnull systenulls 33nullignullre nullnull1 null nullntry tinulleonullt nullenullore enullpiry onull nullininullnullnull 30 seconds operation onull indicator or nullarning denullice 35nullignullre nullnull2 null nullntry tinulleon

15、ullt anullter enullpiry onull nullininullnullnull 30 seconds operation indicator or nullarning denullice nullnullDnull 35nullignullre nullnull3 null nullntry tinulleonullt nullenullore enullpiry onull nullininullnullnull 30 seconds operation onull indicator or nullarning denullice nullnullDnull null

16、second detector nullenullore end onull 30 seconds delaynull 36nullignullre nullnull4 null Intrnullder alarnull nullenullore entry and detector onull the entry ronullte dnullring entry 36Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSIBS 8243:2010ii

17、null null BSI 2010BRITISH STANDARDSummary of pagesThis docnullnullent conullprises a nullront conullernull an inside nullront conullernull pages i to inullnull pages 1 to 44null an inside nullacnull conuller and a nullacnull conullernullnullist of tanulllesTanullle Hnull1 null Types onull alarnull c

18、ondition pernullitted to contrinullnullte to a senullnullentially connullrnulled intrnullder alarnull 37Tanullle Hnull2 null Types onull alarnull condition pernullitted to contrinullnullte to a senullnullentially connullrnulled holdnullnullp alarnull 37Tanullle Hnull3 null nullontrol and indicating

19、enullnullipnullent nullnullInullnull tests nullor connullrnullation nullnullnctions 40Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSInull BSI 2010 null iiiBS 8243:2010BRITISH STANDARDnullorenullordnullunulllishing informationThis British Standard i

20、s pnullnulllished nully BSI and canulle into enullnullect on 31 nullay 2010null It nullas prepared nully Snullnullconullnullittee nullnullnull1null2null Installed alarm systemsnull nullnder the anullthority onull Technical nullonullnullittee nullnullnull1nullElectronic security systemsnull A list on

21、ull organinullations represented on this conullnullittee can nulle onulltained on renullnullest to its secretarynullSupersessionThe pronullisions onull this standard nulleconulle enullnullectinulle inullnullediately and can nulle nullsed as soon as snullitanullle prodnullcts are anullailanullle to c

22、onullply nullith its reconullnullendationsnull Honullenullernull the technical conullnullittee recogninulles that snullppliers onull prodnullcts and sernullices nullithin the scope onull this standard nullill renullnullire tinulle to conullplynull nullor this reasonnull DD 243:2004 nullill nulle nul

23、lithdranulln on 31 nullay 2012nullInformation anullout this documentThis is a nullnullll renullision onull DD 243null and introdnullces the nullollonulling principal changes:null adds reconullnullendations nullor the nullse onull connullrnulled holdnullnullp alarnulls nullHnullAsnullnull and null pr

24、onullides gnullidance to nullannullnullactnullrers in prodnullcing conullpliant enullnullipnullent nullor nullse in connullrnulled alarnull InullHASnullnullse of this documentAs a code onull practicenull this British Standard tanulles the nullornull onull gnullidance and reconullnullendationsnull It

25、 shonullld not nulle nullnulloted as inull it nullere a specinullcation and particnulllar care shonullld nulle tanullen to ensnullre that clainulls onull conullpliance are not nullisleadingnullAny nullser clainulling conullpliance nullith this British Standard is enullpected to nulle anullle to null

26、nullstinully any conullrse onull action that denulliates nullronull its reconullnullendationsnullnullresentational connullentionsThe pronullisions in this standard are presented in ronullan nullinullenull nullprightnulltypenull Its reconullnullendations are enullpressed in sentences in nullhich the

27、principal anullnulliliary nullernull is nullshonullldnullnullCommentary, explanation and general innullormatinulle material is presented in smaller italic type, and does not constitute a normatinulle elementnullThe nullord nullshonullldnull is nullsed to enullpress reconullnullendations onull this s

28、tandardnull The nullord nullnullaynull is nullsed in the tenullt to enullpress pernullissinullilitynullenullgnull as an alternatinulle to the prinullary reconullnullendation onull the nulllanullsenullThe nullord nullcannull is nullsed to enullpress possinullilitynull enullgnull a consenullnullence o

29、null an action or an enullentnullNotes and conullnullentaries are pronullided thronullghonullt the tenullt onull this standardnull Notes ginulle renullerences and additional innullornullation that are inullportant nullnullt do not nullornull part onull the reconullnullendationsnull nullonullnullenta

30、ries ginulle nullacnullgronullnd innullornullationnullLicensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSIBS 8243:2010inull null null BSI 2010BRITISH STANDARDContractual and legal considerationsThis pnullnulllication does not pnullrport to inclnullde al

31、l the necessary pronullisions onull a contractnull nullsers are responsinullle nullor its correct applicationnullCompliance nullith a British Standard cannot confer immunity from legal onullligationsnullLicensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) B

32、SInull BSI 2010 null 1BS 8243:2010BRITISH STANDARDnull ScopeThis British Standard ginulles reconullnullendations nullor the designnull installation and connullgnullration onull intrnullsion and holdnullnullp alarnull systenulls nullInullHASsnull that incorporate alarnull connullrnullation technology

33、null nullhere snullch InullHASs hanulle signalling systenulls that signal to an alarnull receinulling centre nullARnullnull and renullnullire a police responsenullIt inclnulldes reconullnullendations intended to nullininullinulle the linullelihood onullnullalse alarnullsnullIt is intended to nulle r

34、ead in connullnullnction nullith BS nullN null0131 nullas inullplenullented nully nullD nullnullnull2nullnullInull HnullA connullrnullation is to nulle inclnullded in the installationnull then the relenullant clanullses onull this standard applynullnullnullnullE nullnullnull alarm connullrmation may

35、 nulle used as renulluired in tnulle nullCnullnullnullnullCnullnullnull nullecurity nullystems policies null1null null2nullnull2 nullormatinulle referencesThe nullollonulling renullerenced docnullnullents are indispensanullle nullor the application onull this docnullnullentnull nullor dated renuller

36、encesnull only the edition cited appliesnull nullor nullndated renullerencesnull the latest edition onull the pnullnulllication nullinclnullding any anullendnullentsnull appliesnullBS nullnullnullnullnull nullemote centres receinulling signals nullrom nullre and security systems null Code onull prac

37、tice BS 84null3null Intruder and nulloldnullup alarm systems null nullanagement onull nullalse alarms null Code onull practice BS nullN null0131 nullall partsnullnull nulllarm systems null Intrusion and nulloldnullup systemsBS nullN null0131null1 1nullnull nulllarm systems null Intrusion and nullold

38、nullup systems nullnullart 1null nullystem renulluirements BS nullN null0131null3null nulllarm systems null Intrusion and nulloldnullup systems null nullart 3nullControl and indicating enulluipmentBS nullN null013null nullall partsnullnull nulllarm systems null nulllarm transmission systems and enul

39、luipment DD nullnullnullnullTS null0131nullnullnull nulllarm systems null Intrusion systems null nullart 7nullnullpplication guidelinesnullD nullnullnull2null nullcnulleme nullor tnulle application onull European nulltandards nullor intruder and nulloldnullup alarm systems3 nullermsnull definitions

40、and anullnullrenulliations3nullnull nullerms and definitionsnullor the pnullrposes onull this British Standardnull the ternulls and denullnitions ginullen in the BS nullN null0131 seriesnull the BS nullN null013null series and the nullollonulling applynull1nullSnullnullclanullses nullnull2nullnullnu

41、ll nullnullnullnullnullnull nullnullnullnull2null nullnull8 and nullnullnull nullanulle nornullatinulle renullerence to BS nullN null0131null1:200nullnullA1:200nullnullLicensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 15/07/2010 08:06, Uncontrolled Copy, (c) BSIBS 8243:20102 null null BSI 2010B

42、RITISH STANDARD3nullnullnullnull alarm callconullnullnullnication nullronull an ARnull to the appropriate party nullor partiesnullnullnullhich indicates that an alarnull condition has occnullrred at a snullpernullised prenullisesnull or nullhich pronullides snullpplenullentary innullornullation conc

43、erning a prenullionullsly reported alarnull condition3nullnullnull2 alarm filteringprocednullre nullherenully renullotely notinulled alarnull conditions are intentionally held at an ARnull and their statnulls renullienulled nullor the pnullrpose onull cancelling certain alarnull conditionsnull nullh

44、ere snullch cancellation is anullthorinulled nully the client3nullnullnull3 alarm receinulling centrecontinnullonullsly nullanned centre to nullhich innullornullation concerning the statnulls onull one or nullore InullHAS is reported 3nullnullnull4 alarm signalsignal nullhichnull nullpon nulleing re

45、ceinulled at an ARnullnull or nullpon nulleing receinulled and processed at an ARnullnull identinulles a renullotely notinulled alarnull condition3nullnullnullnull ancillary control enulluipmentenullnullipnullent nullsed nullor snullpplenullentary control pnullrposes 3nullnullnullnull as-fitted docu

46、mentdocnullnullent in nullhich details onull the InullHAS actnullally installed are recorded3nullnullnullnull audinullly confirmeddesignation at an ARnull nully interpreting anulldio innullornullation receinulled nullronull the snullpernullised prenullises and deternullination onull a high pronullan

47、ullility that a gennulline alarnull has occnullrred 3nullnullnull8 audio listening denulliceconullponent nullor connullerting sonullnd nullanulles into electrical energy nullariations nullor snullnullsenullnullent renullconnullersion into sonullnd nullanullesnullnullnullE null micropnullone is an ex

48、ample onull an nullnullnullnull3nullnullnullnull audio monitoring denulliceconullponent nullhich is actinullated nully sonullnds anullonulle a specinullc thresholdnullnullnullE nullypically, an nullnullnull nullould incorporate a micropnullonenull3nullnullnullnull0 clientperson or organinullation pn

49、ullrchasing the InullHAS andnullor other alarnullsernullices nullronull an alarnull conullpany andnullor ARnull3nullnullnullnullnull confirmation timetinulle allonulled nullor a senullnullentially connullrnulled alarnull to occnullr anullter an nullnconnullrnulled alarnull has occnullrred3nullnullnullnull2 confirmed alarmcondition that nullollonulls anullter tnullo independent actions or signals hanulle nulleen generated nullronull an anulldinulllenull nullisnullalnull or senullnullential sonullrce connullrnulling that there is or has nulleen a high pronullanullility onull gennulline alarnu

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1