COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf

上传人:livefirmly316 文档编号:620660 上传时间:2018-12-21 格式:PDF 页数:570 大小:3.92MB
下载 相关 举报
COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf_第1页
第1页 / 共570页
COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf_第2页
第2页 / 共570页
COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf_第3页
第3页 / 共570页
COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf_第4页
第4页 / 共570页
COE EP 1110-1-8 VOL 11-2009 Construction Equipment Ownership and Operating Expense Schedule Region XI《施工设备的所有权和运行费用表XI》.pdf_第5页
第5页 / 共570页
点击查看更多>>
资源描述

1、 EP 1110-1-8 Volume 11 November 2009 Construction Equipment Ownership and Operating Expense Schedule Region XI Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I

2、HS-,-,-DEPARTMENT OF ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 This pamphlet supersedes EP 1110-1-8, dated 31 July 2007. REPLY TO ATTENTION OF: CECW-EC Pamphlet 30 November 2009 No. 1110-1-8, Vol. 11 CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE 1. Purpose. This p

3、amphlet is authorized by and established in accordance with Federal Acquisition Regulation (FAR) 31.105 and Engineer Federal Acquisition Regulation (EFAR) SUBPART 31.105. This pamphlet establishes predetermined equipment ownership and operating expense rates for construction equipment. This pamphlet

4、 also establishes a method to calculate equipment ownership and operating expense rates for construction equipment when the predetermined rates are not considered appropriate. The overall intent of this pamphlet is to determine equipment costs that are fair and reasonable. Expense factors for calcul

5、ating dredge plant and marine equipment costs are provided in chapter 4. 2. Applicability. This pamphlet applies to all USACE commands. It is applicable to all solicitations and contracts for construction expected to exceed the Simplified Acquisition Threshold of $100,000 when actual cost data for b

6、oth ownership and operating costs cannot be determined. This volume is for use in Region XI, which includes the following states: Puerto Rico 3. References. See APPENDIX A. 4. Distribution Statement. Approved for public release, distribution is unlimited. FOR THE COMMANDER: 12 Appendixes STEPHEN L.

7、HILL (See Table of Contents) Colonel, Corps of Engineers Chief of Staff EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-This page intentionally left blankEP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reprod

8、uction or networking permitted without license from IHS-,-,-iCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents CHAPTER 1.0 - INTRODUCTION 1.1 Use 1-1 1.2 Decision Flow Process 1-1 1.3 How to Obtain Assistance 1-1 1.4 How to Obtain CHECKRATE Spreadsheet 1-2 1.5 How to

9、Obtain this Publication. 1-2 CHAPTER 2.0 - METHODOLOGY FOR CONSTRUCTION EQUIPMENT SECTION I. GENERAL.2-1 2.1 Contents 2-1 2.2 Basis for Equipment Rates 2-1 2.3 Total Hourly Rate. 2-1 SECTION II. OPERATING CONDITIONS.2-2 2.4 Average, Difficult, or Severe Conditions 2-2 2.5 Determination of Condition

10、2-3 SECTION III. EQUIPMENT SELECTION2-3 2.6 General 2-3 2.7 Truck Selection 2-3 2.8 Crawler Tractor Selection 2-3 2.9 Equipment Accessories. 2-4 SECTION IV. EQUIPMENT VALUE .2-4 2.10 List Price and Accessories. 2-4 2.11 Discount Code (DC) 2-4 2.12 Sales or Import Tax . 2-4 2.13 Freight . 2-4 2.14 To

11、tal Equipment Value (TEV) 2-4 SECTION V. LIFE .2-5 2.15 Economic Life (LIFE). 2-5 2.16 Working Hours Per Year (WHPY) 2-5 SECTION VI. SALVAGE VALUE .2-5 2.17 Salvage Value (SLV) . 2-5 2.18 Salvage Value Percentage 2-5 EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networ

12、king permitted without license from IHS-,-,-iiCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) SECTION VII. OWNERSHIP COST2-6 2.19 Ownership Elements . 2-6 2.20 Depreciation 2-6 2.21 Facilities Capital Cost of Money (FCCM). 2-7 SECTION VIII. OPERATING COS

13、T2-7 2.22 Operating Cost Elements 2-7 2.23 Fuel Cost . 2-8 2.24 Filters, Oil, and Grease (FOG) Cost 2-9 2.25 Repair Cost 2-10 2.26 Tire Wear Cost 2-12 2.27 Tire Repair Cost 2-13 SECTION IX. STANDBY HOURLY RATE2-14 2.28 Standby Hourly Rate . 2-14 SECTION X. RATE CALCULATION EXAMPLE2-14 2.29 Computati

14、on Example . 2-14 CHAPTER 3.0 - ADJUSTMENTS TO HOURLY RATES SECTION I. GENERAL.3-1 3.1 Contents 3-1 3.2 Basis for Equipment Rates 3-1 3.3 Equipment Rate Adjustment Tables 3-1 3.4 Determination for Use of Equipment Rates in Tables 2-1 and 2-2.3-1 SECTION II. RATE ADJUSTMENTS3-2 3.5 Rate Adjustments 3

15、-2 3.6 Changes in Operating Conditions 3-2 3.7 Change in Cost of Money Rate (CMR) 3-2 3.8 Actual Work Hours Greater than 40 Hours per Week 3-3 3.9 Changes in Fuel Cost 3-4 3.10 Adjustments to Fuel, Oil, and Grease (FOG) Cost 3-5 3.11 Equipment of Different Age than Table 2-1 . 3-5 3.12 Rate Adjustme

16、nt for Overage Equipment 3-6 3.13 Standby Rate Adjustment for Equipment of a Different Age than Table 2-13-7 3.14 Equipment Purchased Used 3-8 3.15 Rate Calculation Examples 3-8 EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS

17、-,-,-iiiCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) CHAPTER 4.0 - METHODOLOGY FOR DREDGING PLANT AND MARINE EQUIPMENT SECTION I. GENERAL.4-1 4.1 Contents 4-1 4.2 General 4-1 SECTION II. ANNUAL USE4-1 4.3 Time Available to Dredge 4-2 SECTION III. LIFE

18、 4-2 4.4 Life. 4-2 4.5 Annual Hours Available . 4-3 SECTION IV. SALVAGE VALUE .4-3 4.6 Salvage Value (SLV) . 4-3 SECTION V. OWNERSHIP COST4-3 4.7 Ownership Cost. 4-3 4.8 Depreciation Factor . 4-4 4.9 The Cost of Money Rate (CMR) Factor . 4-4 4.10 Other Ownership Elements 4-5 SECTION VI. OPERATING FA

19、CTORS 4-5 4.11 Hourly Operating Cost. 4-5 4.12 Prime and Secondary Power. 4-5 4.13 Water, Lube, and Supplies (WLS) . 4-6 4.14 Repairs (RPR) . 4-6 SECTION VII. STANDBY4-7 4.15 Standby Rate. 4-7 SECTION VIII. NEGOTIATED PROCUREMENT .4-7 4.16 Rates. 4-7 4.17 Allowance for Additional Capital Improvement

20、s. 4-8 4.18 Overage Plant 4-8 4.19 Dredging Plant Purchased Used . 4-8 SECTION IX. RATE CALCULATION EXAMPLE .4-8 4.20 Rate Calculation Example . 4-8 EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ivCONSTRUCTION EQUIPMENT

21、 OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) List of Tables Table 2-1. Hourly Equipment Ownership and Operating Expense 2-21 Table 2-2. Hourly Rate Elements.2-253 Table 3-1. Equipment Age Adjustment Factors .3-9 Table 3-2. Equipment Age Adjustment Factors .3-33 Table 4-1.

22、Dredging Plant Cost Factors 4-9 List of Figures Figure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction Equipment1-3 Figure 2-1. Equipment Rate Computation Worksheet .2-15 Figure 3-1. Total Hourly Rate Calculation for Overage Equipment3-25 Figure 3-2. Standby H

23、ourly Rate Calculation for Overage Equipment.3-49 Figure 4-1. Months Available by Region4-2 Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet 4-13 List of Appendixes Appendix A References .A-1 Appendix B Area Factors .B-1 Appendix C Guide for Selecting Operating Conditions C-1 Append

24、ix D Equipment Hourly Calculation Factors. D-1 Appendix E Economic Indexes for Construction Equipment E-1 Appendix F Tire Description and Tire Cost F-1 Appendix G Tire Life and Tire Wear Factors . G-1 Appendix H Manufacturer List . H-1 Appendix I Federal Cost-of-Money Rate I-1 Appendix J Equipment A

25、ccessories J-1 Appendix K Ground Engaging Component Costs Included in Repairs (RCF)K-1 Appendix L Guide for Estimating Drill Steel and Drill Bit Costs L-1 Glossary.Glossary-1 Index . Index-1 EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without lic

26、ense from IHS-,-,-1-1CHAPTER 1.0 - INTRODUCTION 1.1 Use The use of this pamphlet is for rate determination on construction contracts, dredging contracts, and negotiated procurements and relates only to contractor-owned equipment. The overall intent of the pamphlet is to determine equipment costs tha

27、t are fair and reasonable. a. This pamphlet shall be used for determining hourly equipment rates that are contained in the independent government estimate. b. In addition, the use of this pamphlet will be required by contractors for pricing contractor-owned equipment in negotiated procurements when:

28、 (1) Cost or pricing data is not required, as defined in Federal Acquisition Regulation (FAR) Part 15.400, Contract Pricing. (2) Cost or pricing data is required and the actual cost data to support either ownership or operating costs for equipment or equipment groups of similar model and series is n

29、ot available. (3) Cost or pricing data is required and available, but all or part of the data is determined not to be in accordance with the FAR cost principles. 1.2 Decision Flow Process A flow chart (figure 1-1) is provided at the end of this chapter to help the user better understand the process

30、for developing an hourly equipment rate. The flow chart shows the decision points that allow the user to decide whether to use the predetermined rate tables or calculate the rate using the method shown in figure 2-1 or using CHECKRATE (also see paragraph 3.4). 1.3 How to Obtain Assistance When assis

31、tance is needed in understanding the methodology for calculating equipment rates, contact the Chief, Cost Engineering Branch, Engineering and Construction Division, Walla Walla District, U.S. Army Corps of Engineers, (CENWW-EC-X), 509-527-7511, 509-527-7510, or visit the Web site at http:/www.nww.us

32、ace.army.mil/html/offices/ed/c/default.asp. EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1-21.4 How to Obtain CHECKRATE Spreadsheet A Microsoft Excelspreadsheet, named “CHECKRATE,” has been developed to calculate equip

33、ment rates using the methodology required by this pamphlet. The user must have Microsoft Excelto run the application. The factors needed in the hourly cost calculations are located in the appendixes of this pamphlet. A copy of the spreadsheet may be obtained by choosing the CHECKRATE link on the fol

34、lowing Web site: http:/www.nww.usace.army.mil/html/offices/ed/c/default.asp. 1.5 How to Obtain this Publication Volumes 1-12 of this pamphlet are available in portable document format (PDF) and can be viewed or downloaded at http:/140.194.76.129/publications/eng-pamphlets. Copies of the pamphlet are

35、 also available on CD-ROM (Volumes 1-12) through the Superintendent of Documents or government bookstores (see appendix A). For additional information, telephone 202-512-1800, fax 202-512-2104, toll-free 866-512-1800, or access on the Internet at http:/bookstore.gpo.gov/. EP 1110-1-8, Vol. 1130 Nov

36、09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Finished. The methodology in ths pamphlet should not be used for rental or leased equipment.YESYESAVERAGE SEVERENOYESNODIFFICULTIs the equipment contractor owned ? Is the equipment in Table 2-1?Is the

37、re equipment in Table 2-1 that is equivalent in configuration (size, capacity, and horsepower) and value to the equipment for which you are determining a rate? Use the tables in chapter 2 for the actual or equivalent equipment.Is the equipment operating in average severe or difficult conditions? (se

38、e chapter 2, section II for definition)Calculate a rate based on the step-by-step rate computation method shown in Figure 2-1 or use CHECKRATEUse the equipment rate shown in Table 2-1From Table 2-2 use the arithmetic mean of the average and severe equipment rates. (Note: if there is no severe rate f

39、or the equipment see guidance in chapter 2, section II, paragraph 2-4.)Use severe rate shown in Table 2-2. (Note: if there is no severe rate for the equipment see guidance in chapter 2, section II, paragraph 2-4.)Is the use of this pamphlet required in accordance with Chapter 1, paragraph 1-1?YESNOU

40、se the contractors actual cost and pricing data to determine a rate.NOFigure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction EquipmentSTARTNext Page Is this land based or marine equipment?Land Based Equipment Marine equipmentUse the methodology found in Chapte

41、r 4 for determining a rate for Marine Equipment.Is the equipment in Table 2-1 equivalent in configuration (size, capacity, and horsepower) and value to the equipment for which you are determining a rate? YES1-3EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking pe

42、rmitted without license from IHS-,-,-NOYESNONOFINISHED (except for standby)YESNOEquipment is newerIf equipment is older than in Table 2-1 determine economic life by dividing LIFE by Working Hours Per Year. (see chapter3 section II, Paragraph 3-11.a.) Equipment is olderEquipment age does not exceed e

43、conomic lifeEquipment age exceeds economic lifeIs the Cost of Money Rate (CMR) different from that shown in chapter 2, section VII or Appendix B? The Department of the Treasury adjusts the CMR (Prompt Payment Interest Rate) on or about 1 January and 1 July each year. For the current Prompt Payment I

44、nterest Rate seehttp:/www.publicdebt.treas.gov/opd/opdprmt2.htm. If the cost of money rate shown in chapter 2, section VII, is not the current rate, the FCCM portion of the total hourly rate shall be adjusted. Adjust the Cost of Money Rate per the instructions in chapter 3, section II, paragraph 3-7

45、.Is the cost of fuel 10% greater than or 10% less than the cost shown in Appendix B?The contractor shall be required to furnish copies of all fuel supply contracts and invoices to the government to support fuel cost adjustment. Request for upward adjustment in the rates will be considered only when

46、fuel is supplied by recognized distributors of bulk quantitiesIf the contractor is able to furnish the above information, adjust the fuel cost per the instructions in chapter 3, section II, paragraph 3-9.If fuel costs are adjusted FOG costs also need to be adjusted by applying the same ratio used to

47、 adjust the fuel cost.Do the actual hours worked exceed 40 hours per week?Make adjustments to the FCCM per the instructions in chapter 3, section II, paragraph 3-8Is the equipments date of manufacure different from that in Table 2-1 (see chapter 2 section 1, paragraph 2-2)?Adjust the rate using Tabl

48、e 3-1 per the instructions found in chapter3 section II, Paragraph 3-11.c.Adjust the rate using Table 3-1 per the example found in chapter3 section II, Paragraph 3-11.a.Adjust the rate using Table 3-1 per the instructions found in chapter3 section II, Paragraph 3-12.YESFigure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction EquipmentContinue from previous page1-4EP 1110-1-8, Vol. 1130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2-1CHA

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 18211-2016 Non-destructive testing Long-range inspection of above-ground pipelines and plant piping using guided wave testing with axial propagation《无损试验 采用导波检测与轴向传播对地上管线及设备.pdf BS ISO 18211-2016 Non-destructive testing Long-range inspection of above-ground pipelines and plant piping using guided wave testing with axial propagation《无损试验 采用导波检测与轴向传播对地上管线及设备.pdf
  • BS ISO 18215-2015 Ships and marine technology Vessel machinery operations in polar waters Guidelines《船舶和海洋技术 极地水域的船舶机械操作 指南》.pdf BS ISO 18215-2015 Ships and marine technology Vessel machinery operations in polar waters Guidelines《船舶和海洋技术 极地水域的船舶机械操作 指南》.pdf
  • BS ISO 18221-2016 Microscopes Microscopes with digital imaging displays Information provided to the user regarding imaging performance《显微镜 带数码影像显示的显微镜 提供给使用者的影响性能信息》.pdf BS ISO 18221-2016 Microscopes Microscopes with digital imaging displays Information provided to the user regarding imaging performance《显微镜 带数码影像显示的显微镜 提供给使用者的影响性能信息》.pdf
  • BS ISO 18225-2012 Plastics piping systems Multilayer piping systems for outdoor gas installations Specifications for systems《塑料管道系统 室外气体装置用多层管道系统 系统规格》.pdf BS ISO 18225-2012 Plastics piping systems Multilayer piping systems for outdoor gas installations Specifications for systems《塑料管道系统 室外气体装置用多层管道系统 系统规格》.pdf
  • BS ISO 18227-2014 Soil quality Determination of elemental composition by X-ray fluorescence《土质 采用X射线荧光对元素组成的测定》.pdf BS ISO 18227-2014 Soil quality Determination of elemental composition by X-ray fluorescence《土质 采用X射线荧光对元素组成的测定》.pdf
  • BS ISO 1823-2015 Rubber hose and hose assemblies for oil suction and discharge service Specification《油的吸放装置用橡胶软管和软管总成 规格》.pdf BS ISO 1823-2015 Rubber hose and hose assemblies for oil suction and discharge service Specification《油的吸放装置用橡胶软管和软管总成 规格》.pdf
  • BS ISO 18232-2006 Health informatics - Messages and communication - Format of length limited globally unique string identifiers《健康信息学 信息和通信 全球唯一字符型标识符长度限制的格式》.pdf BS ISO 18232-2006 Health informatics - Messages and communication - Format of length limited globally unique string identifiers《健康信息学 信息和通信 全球唯一字符型标识符长度限制的格式》.pdf
  • BS ISO 18238-2015 Space systems Closed loop problem solving management《航天系统 闭环问题解决的管理》.pdf BS ISO 18238-2015 Space systems Closed loop problem solving management《航天系统 闭环问题解决的管理》.pdf
  • BS ISO 18241-2016 Cardiovascular implants and extracorporeal systems Cardiopulmonary bypass systems Venous bubble traps《心血管植入物和体外系统 心肺旁路系统 静脉气泡排除器》.pdf BS ISO 18241-2016 Cardiovascular implants and extracorporeal systems Cardiopulmonary bypass systems Venous bubble traps《心血管植入物和体外系统 心肺旁路系统 静脉气泡排除器》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1