ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf

上传人:eastlab115 文档编号:741555 上传时间:2019-01-11 格式:PDF 页数:93 大小:935.91KB
下载 相关 举报
ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf_第1页
第1页 / 共93页
ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf_第2页
第2页 / 共93页
ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf_第3页
第3页 / 共93页
ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf_第4页
第4页 / 共93页
ETSI TS 125 319-2018 Universal Mobile Telecommunications System (UMTS) Enhanced uplink Overall description Stage 2 (V15 0 0 3GPP TS 25 319 version 15 0 0 Release 15).pdf_第5页
第5页 / 共93页
点击查看更多>>
资源描述

1、 ETSI TS 125 319 V15.0.0 (2018-07) Universal Mobile Telecommunications System (UMTS); Enhanced uplink; Overall description; Stage 2 (3GPP TS 25.319 version 15.0.0 Release 15) TECHNICAL SPECIFICATION ETSI ETSI TS 125 319 V15.0.0 (2018-07)13GPP TS 25.319 version 15.0.0 Release 15Reference RTS/TSGR-062

2、5319vf00 Keywords UMTS ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can

3、 be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of an

4、y existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may

5、be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the following services: https:/portal.ets

6、i.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified wit

7、hout the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare trademarks of ET

8、SI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSMand the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI TS 125 319 V15.0.0 (2018-07)23GPP TS 25.319 version 15.0.0 Release

9、15Intellectual Property Rights Essential patents IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314:

10、“Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation,

11、 including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Trademarks The present document may inc

12、lude trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the pres

13、ent document does not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks. Foreword This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications

14、or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. Modal verbs t

15、erminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowe

16、d in ETSI deliverables except when used in direct citation. ETSI ETSI TS 125 319 V15.0.0 (2018-07)33GPP TS 25.319 version 15.0.0 Release 15Contents Intellectual Property Rights 2g3Foreword . 2g3Modal verbs terminology 2g3Foreword . 6g31 Scope 7g32 References 7g33 Definitions and abbreviations . 8g33

17、.1 Definitions 8g33.1.1 General 8g33.1.2 FDD 8g33.1.3 TDD 9g33.2 Abbreviations . 10g34 Background and introduction . 10g35 Requirements 11g36 Overall architecture of enhanced uplink DCH . 11g36.1 Protocol architecture. 12g36.2 Transport channel attributes . 13g36.3 Basic physical structure 14g36.3.1

18、 UL Physical layer model . 14g36.3.1.1 FDD. 14g36.3.1.2 TDD 15g36.3.2 DL Physical layer model . 17g36.3.2.1 FDD. 17g36.3.2.2 3.84 Mcps and 7.68 Mcps TDD 19g36.3.2.3 1.28 Mcps TDD . 20g37 MAC architecture . 22g37.1 General Principle 22g37.1.1 MAC multiplexing 22g37.1.2 Reordering entity 23g37.2 MAC a

19、rchitecture UE side 23g37.2.1 Overall architecture. 23g37.2.2 Details of MAC-d . 26g37.2.3 Details of MAC-c/sh . 27g37.2.4 Details of MAC-hs 27g37.2.5 Details of MAC-es/MAC-e . 28g37.2.6 Details of MAC-is/MAC-i 29g37.3 MAC architecture UTRAN side 33g37.3.1 Overall architecture. 33g37.3.2 Details of

20、MAC-d . 36g37.3.3 Details of MAC-c/sh . 37g37.3.4 Details of MAC-hs 38g37.3.5 Details of MAC-es 38g37.3.6 Details of MAC-e . 40g37.3.7 Details of MAC-is . 41g37.3.8 Details of MAC-i 46g38 HARQ protocol 48g38.1 General principle 48g38.2 Error handling 50g38.3 Signalling . 50g38.3.1 Uplink . 50g38.3.2

21、 Downlink 50g3ETSI ETSI TS 125 319 V15.0.0 (2018-07)43GPP TS 25.319 version 15.0.0 Release 159 Node B controlled scheduling 51g39.1 General principle 51g39.2 UE scheduling operation 53g39.2.1 Grants from the Serving RLS . 53g39.2.1.1 FDD. 53g39.2.1.2 TDD 55g39.2.2 Grants from the Non-serving RL (FDD

22、 only) 56g39.2.3 Reception of Grants from both the Serving RLS and Non-serving RL(s) (FDD only) . 56g39.3 Signalling . 56g39.3.1 Uplink . 56g39.3.1.1 Scheduling information . 56g39.3.1.1.1 Content 56g39.3.1.1.2 Triggers . 57g39.3.1.1.3 Transmission and Reliability scheme 58g39.3.1.2 Happy bit of E-D

23、PCCH (FDD only) . 60g39.3.2 Downlink 60g310 Non-scheduled transmissions . 60g311 QoS control 61g311.1 General Principle 61g311.1.1 QoS configuration principles 61g311.2 TFC and E-TFC selection . 63g311.3 Setting of Power offset attributes of MAC-d flows 65g312 Signalling parameters . 65g312.1 Uplink

24、 signalling parameters 65g312.2 Downlink signalling parameters . 65g313 Mobility procedures . 69g313.1 Change of serving cell and/or serving RLS 69g314 Resource management 69g314.1 Scheduler control from CRNC to Node B (FDD only) 69g314.2 Node B to CRNC reporting (FDD only) 70g314.3 Void 70g315 Timi

25、ng Advance and Synchronisation (3.84/7.68 Mcps TDD only) . 70g316 E-DCH transmission in CELL_FACH state and Idle Mode (FDD only) . 71g317 E-DCH semi-persistent scheduling transmission in 1.28Mcps TDD . 72g317.1 Assignment/reassignment of semi-persistent E-PUCH resources for E-DCH semi-persistent sch

26、eduling transmission 73g318 E-DCH transmission in CELL_FACH state and Idle Mode (1.28Mcps TDD only) 73g319 Dual Cell E-DCH operation (FDD only) 73g319.1 Deactivation/activation of secondary RL using HS-SCCH orders . 76g320 Multi-Carrier E-DCH operation (1.28 Mcps TDD only) . 77g321 MU-MIMO operation

27、 in HSUPA channel in 1.28Mcps TDD . 79g322 Uplink Transmit Diversity Operation (FDD only) . 80g322.1 Uplink open loop transmit diversity operation . 80g322.2 Uplink closed loop transmit diversity operation . 80g323 Further Enhancements to CELL_FACH state (FDD only) 81g323.1 Concurrent deployment of

28、2ms and 10ms TTI in a cell . 82g323.2 Fallback to R99 PRACH 82g323.3 Reduction in timing of the initial access in the physical random access procedure . 82g323.4 Common E-RGCH based interference control . 82g323.5 TTI alignment . 83g323.6 Per HARQ process activation and de-activation 83g324 Uplink M

29、IMO Operation (FDD only) 83g3ETSI ETSI TS 125 319 V15.0.0 (2018-07)53GPP TS 25.319 version 15.0.0 Release 1525 Enhanced TTI switching (FDD only) . 84g326 Heterogeneous Networks Enhancements (FDD only) . 85g326.1 General . 85g326.2 Radio links without DPCH/F-DPCH 85g326.3 Serving E-DCH cell decouplin

30、g . 85g327 Implicit grant handling (FDD only) . 87g3Annex A (informative): Change history . 89g3History 92g3ETSI ETSI TS 125 319 V15.0.0 (2018-07)63GPP TS 25.319 version 15.0.0 Release 15Foreword This Technical Specification has been produced by the 3rdGeneration Partnership Project (3GPP). The cont

31、ents of the present document are subject to continuing work within the TSG and may change following formal TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an identifying change of release date and an increase in version number as follo

32、ws: Version x.y.z where: x the first digit: 1 presented to TSG for information; 2 presented to TSG for approval; 3 or greater indicates TSG approved document under change control. y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections, updates, etc.

33、z the third digit is incremented when editorial only changes have been incorporated in the document. ETSI ETSI TS 125 319 V15.0.0 (2018-07)73GPP TS 25.319 version 15.0.0 Release 151 Scope The present document is a technical specification of the overall support of FDD, TDD Enhanced Uplink in UTRA. 2

34、References The following documents contain provisions which, through reference in this text, constitute provisions of the present document. - References are either specific (identified by date of publication, edition number, version number, etc.) or non-specific. - For a specific reference, subseque

35、nt revisions do not apply. - For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same Release as the present document. 1 3GPP TR 25

36、.896: “Feasibility Study for Enhanced Uplink for UTRA FDD“. 2 3GPP TR 21.905: “Vocabulary for 3GPP Specifications“. 3 3GPP TS 25.214: “Physical layer procedures (FDD)“. 4 3GPP TS 25.321: “Medium Access Control (MAC) protocol specification“. 5 3GPP TS 25.427: “UTRAN Iub/Iur interface user plane proto

37、col for DCH data streams“ 6 3GPP TS 25.212: “Multiplexing and channel coding (FDD)“. 7 3GPP TS 25.215: “Physical layer - Measurements (FDD)“. 8 3GPP TS 25.306: “UE Radio Access capabilities“. 9 3GPP TR 25.804: “Feasibility Study on Uplink Enhancements for UTRA TDD“ 10 3GPP TR 25.224: “Physical layer

38、 procedures (TDD)“ 11 3GPP TS 25.225: “Physical layer Measurements (TDD)“ 12 3GPP TR 25.826: “3.84 Mcps TDD Enhanced Uplink: Physical Layer Aspects“ 13 3GPP TS 25.221: “Physical Channels and Mapping of Transport Channels onto Physical Channeals (TDD)“ 14 3GPP TR 25.827: “1.28 Mcps TDD Enhanced Uplin

39、k: Physical Layer Aspects“ 15 3GPP TS 25.222: “Multiplexing and channel coding (TDD)“. 16 3GPP TS 25.308: “High Speed Downlink Packet Access (HSDPA); Overall description; Stage 2“. 17 3GPP TS 25.433: “UTRAN Iub interface Node B Application Part (NBAP) signalling“. ETSI ETSI TS 125 319 V15.0.0 (2018-

40、07)83GPP TS 25.319 version 15.0.0 Release 153 Definitions and abbreviations 3.1 Definitions For the purposes of the present document, the terms and definitions given in 3GPP TR 21.905 2 and the following apply: 3.1.1 General E-DCH: Enhanced DCH, a new dedicated and common (FDD and 1.28Mcps TDD only)

41、 transport channel type or enhancements to an existing dedicated and common (FDD and 1.28Mcps TDD only) transport channel type. HARQ profile: One HARQ profile consists of a power offset attribute and maximum number of transmissions. Power offset attribute (FDD): Represents the power offset between E

42、-DPDCH(s) and reference E-DPDCH power level for a given E-TFC. This power offset attribute is set to achieve the required QoS in this MAC-d flow when carried alone in a MAC-e PDU and subsequently in the corresponding CCTrCh of E-DCH type. Details on the mapping on Beta factors can be found in 3. The

43、 reference E-DPDCH power offset is signaled to the UE for one (or several) reference E-TFC(s) (see details in subclause 11.1). Power offset attribute (TDD): The power offset attribute is set to achieve the required QoS in this MAC-d flow when carried alone in a MAC-e PDU and subsequently in the corr

44、esponding CCTrCh of E-DCH type. Primary Absolute Grant: Absolute Grant received with the primary E-RNTI. Note that the primary E-RNTI is the only E-RNTI for TDD. Serving E-DCH cell: Cell from which the UE receives Absolute Grants from the Node-B scheduler. A UE has one Serving E-DCH cell. 3.1.2 FDD

45、Active Process: HARQ process for which Scheduling Grants are applicable, i.e. scheduled data can be sent. Data Description Indicator (DDI): MAC-e header field used to identify the logical channel, MAC-d flow and the size of the MAC-d PDUs concatenated into a MAC-es PDU. E-DCH: Enhanced DCH, a new de

46、dicated and common (FDD only) transport channel type or enhancements to an existing dedicated and common (FDD only) transport channel type. E-DCH active set: The set of cells which carry the E-DCH for one UE. In CELL_FACH state and Idle mode, the E-DCH active set contains the serving E-DCH cell only

47、. Enhanced Uplink in CELL_FACH and Idle mode: combines the Rel99 random access power ramping phase with E-DCH transmission. The procedure can be started in idle mode and CELL_FACH state. E-DCH MAC-d flow: MAC-es/MAC-is PDUs, carrying MAC-d and MAC-c (FDD only) data sharing the same traffic character

48、istics, and that can be multiplexed with MAC-es/MAC-is PDUs of same or other MAC-d flows on MAC-e/MAC-i. HARQ profile: One HARQ profile consists of a power offset attribute and maximum number of transmissions. Implicit Grant handling: A scheduling scheme where a UEs Scheduling Grant on the Secondary

49、 Serving E-DCH cell may be revoked by means of an Absolute Grant addressed to another UE. Inactive Process: HARQ process for which Scheduling Grants are not applicable, i.e. scheduled data cannot be sent. INACTIVE: Absolute Grant value in CELL_DCH that can be sent by the serving cells scheduler on the E-AGCH to deactivate a process or to switch the UE to its secondary E-RNTI. Absolute Grant value in CELL_FACH (FDD only) that can be sent by the serving cells scheduler on the E-AGCH to release a common E-DCH resource. Power offset a

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1