FORD FLTM BN 024-1-2001 FLAMMABILITY TEST FOR TRIM MATERIALS.pdf

上传人:cleanass300 文档编号:747185 上传时间:2019-01-14 格式:PDF 页数:3 大小:89.15KB
下载 相关 举报
FORD FLTM BN 024-1-2001 FLAMMABILITY TEST FOR TRIM MATERIALS.pdf_第1页
第1页 / 共3页
FORD FLTM BN 024-1-2001 FLAMMABILITY TEST FOR TRIM MATERIALS.pdf_第2页
第2页 / 共3页
FORD FLTM BN 024-1-2001 FLAMMABILITY TEST FOR TRIM MATERIALS.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、FORD LABORATORY TEST METHOD BN 024-01 2001 O9 10 FLAMMABILITY TEST FOR TRIM MATERIALS Revised Editorial - no technical change A. Cockman Application This procedure is used where specified to test the flammability of textile trim materials. Apparatus Required Laboratory supports and clamps for holdin

2、g the gas jet and sample as shown in the attached illustration. Hypodermic Needle - 3 inch BD-22 Stop Watch - calibrated in seconds Rubber Tubing - 3/16 inch I.D. Hood - to eliminated strong air currents and carry off fumes Natural Gas Source Conditioning and Test Conditions All test values indicate

3、d herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 OC and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedure 1. Cut and mount a 6 by 6 inch test specimen and mount as shown in

4、the attached illustration. Suitable clamps shall be used to hold the test specimen rigidly in place for this test. 2. Adjust gas pressure to obtain a flame which extends 1/2 inch beyond the tip of the hypodermic needle. 3. Move the test specimen into position against the flame so that the tip of the

5、 needle is 1/8 inch from the sample surface. I Date I Action I Revisions I Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BN 024-01 4. Hold the test specimen in this position for the time specified by the material standard and observe whether the material ignites and suppor

6、ts combustion. 5. Remove the flame and observe whether the sample burns or smoulders after removal of the flame and record findings as required by the material standard. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities. Page 2 of 3 Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BN 024-01 FLAMMABILITY TEST FOR TRIM MATERIALS FLAMMAB I LI TY APPARATUS Page 3 of 3 Copynght02001, Ford Global Technologies, Inc

展开阅读全文
相关资源
猜你喜欢
  • ETSI TS 103 260-2-2015 Satellite Earth Stations and Systems (SES) Reference scenario for the deployment of emergency communications Part 2 Mass casualty incident in public transpor.pdf ETSI TS 103 260-2-2015 Satellite Earth Stations and Systems (SES) Reference scenario for the deployment of emergency communications Part 2 Mass casualty incident in public transpor.pdf
  • ETSI TS 103 260-2-2015 Satellite Earth Stations and Systems (SES) Reference scenario for the deployment of emergency communications Part 2 Mass casualty incident in public transpor_1.pdf ETSI TS 103 260-2-2015 Satellite Earth Stations and Systems (SES) Reference scenario for the deployment of emergency communications Part 2 Mass casualty incident in public transpor_1.pdf
  • ETSI TS 103 261-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 1 Protocol Implementation Conformance S.pdf ETSI TS 103 261-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 1 Protocol Implementation Conformance S.pdf
  • ETSI TS 103 261-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 1 Protocol Implementation Conformance S_1.pdf ETSI TS 103 261-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 1 Protocol Implementation Conformance S_1.pdf
  • ETSI TS 103 261-2-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 2 Test Suite Structure (TSS) and Test P.pdf ETSI TS 103 261-2-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 2 Test Suite Structure (TSS) and Test P.pdf
  • ETSI TS 103 261-2-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 2 Test Suite Structure (TSS) and Test P_1.pdf ETSI TS 103 261-2-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 2 Test Suite Structure (TSS) and Test P_1.pdf
  • ETSI TS 103 261-3-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial.pdf ETSI TS 103 261-3-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial.pdf
  • ETSI TS 103 261-3-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial_1.pdf ETSI TS 103 261-3-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S6a interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial_1.pdf
  • ETSI TS 103 262-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S9 interface (3GPP Release 10) Part 1 Protocol Implementation Conformance St.pdf ETSI TS 103 262-1-2015 Core Network and Interoperability Testing (INT) Diameter Conformance testing for S9 interface (3GPP Release 10) Part 1 Protocol Implementation Conformance St.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1