1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions 2016 05 12 N Status No replacement named D. Murtonen. NA 2008 01 18 Activated L. Neves Copyright 2016, Ford Global Technologies, LLC Page 1 of 2 FABRIC, SALTA EBONY BLACK PATTERN, WOVEN POLYESTER WSS-M1H1123-A NOT TO BE USED FOR NEW DESIGN 1.
2、 SCOPE The material defined by this specification is a woven polyester fabric. 2. APPLICATION This specification was released originally for material used as an interior trim fabric for RANGER 2009 Model Year. 3. REQUIREMENTS In addition to the requirements listed herein, the fabric shall meet all r
3、equirements of WSS-M8P18-A1/A2/A3/A4 as applicable. 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements for Production Materials (WSS-M99P1111-A). 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% tolerance (AST
4、M D 3775) Warp 26.5 yarn/cm Fill 27.5 yarn/cm 3.2.2 Fabric Weight, +/- 5% tolerance (FLTM BN 106-01) Seat (laminated to 4.5 mm foam) 462.0 g/m 3.3 COMPOSITION (ASTM D 629) Fabric 100% Polyester Foam - Seat PUR/Polyether, Density 29 Kg/m3 Backing Fabric (Seats only) 100% Polyester- 46.0 g/m ENGINEERI
5、NG MATERIAL SPECIFICATION WSS-M1H1123-A Copyright 2016, Ford Global Technologies, LLC Page 2 of 2 3.4 YARN CONSTRUCTION (ASTM D 1244) Warp 560 dtex, f 108 BLANK, PES, AIR TEXTURIZED Fill 1 560 dtex, f 108 BLANK, PES, AIR TEXTURIZED, Fill 2 860dtex, f 180 Dark Grey 1952 PES, AIR TEXTURIZED Fill 3 500
6、dtex, f 108 Raw 1025 PES, AIR TEXTURIZED Fill 4 385 dtex, f 96, Grey PES, TEXTURIZED 3.5 METHOD OF DYEING Warp Solution Dyed Fill 1 Solution Dyed Fill 2 Yarn Dyed Fill 3 Raw Fill 4 Yarn Dyed 3.6 FINISHING OPERATIONS Heat Set 3.7 THICKNESS, mm, range (ASTM D 1777) Seat (laminated to 4.3 mm foam + bac
7、king fabric) 4.4 mm +/- 5% 3.8 TRIMMABILITY PROPERTIES 3.8.1 Stretch, %, range (SAE J855) Seat Warp 6.0 +/- 15% Fill 3.0 +/- 15% 3.9 FLAMMABILITY (ISO 3795/SAE J369) Burn Rate, max 100 mm/minute 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 4.1 Purchase departments will ensure that material defined in this specification and shipped to anyone assembly plant will be produced by one supplier only.