ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf

上传人:赵齐羽 文档编号:794009 上传时间:2019-02-02 格式:PDF 页数:8 大小:1.36MB
下载 相关 举报
ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf_第1页
第1页 / 共8页
ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf_第2页
第2页 / 共8页
ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf_第3页
第3页 / 共8页
ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf_第4页
第4页 / 共8页
ITU-R SM 1392-2-2011 Essential requirements for a spectrum monitoring system for developing countries《发展中国家频谱监测系统的基本要求》.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、 Recommendation ITU-R SM.1392-2(02/2011)Essential requirements for a spectrum monitoring system for developing countriesSM SeriesSpectrum managementii Rec. ITU-R SM.1392-2 Foreword The role of the Radiocommunication Sector is to ensure the rational, equitable, efficient and economical use of the rad

2、io-frequency spectrum by all radiocommunication services, including satellite services, and carry out studies without limit of frequency range on the basis of which Recommendations are adopted. The regulatory and policy functions of the Radiocommunication Sector are performed by World and Regional R

3、adiocommunication Conferences and Radiocommunication Assemblies supported by Study Groups. Policy on Intellectual Property Right (IPR) ITU-R policy on IPR is described in the Common Patent Policy for ITU-T/ITU-R/ISO/IEC referenced in Annex 1 of Resolution ITU-R 1. Forms to be used for the submission

4、 of patent statements and licensing declarations by patent holders are available from http:/www.itu.int/ITU-R/go/patents/en where the Guidelines for Implementation of the Common Patent Policy for ITU-T/ITU-R/ISO/IEC and the ITU-R patent information database can also be found. Series of ITU-R Recomme

5、ndations (Also available online at http:/www.itu.int/publ/R-REC/en) Series Title BO Satellite delivery BR Recording for production, archival and play-out; film for television BS Broadcasting service (sound) BT Broadcasting service (television) F Fixed service M Mobile, radiodetermination, amateur an

6、d related satellite services P Radiowave propagation RA Radio astronomy RS Remote sensing systems S Fixed-satellite service SA Space applications and meteorology SF Frequency sharing and coordination between fixed-satellite and fixed service systems SM Spectrum management SNG Satellite news gatherin

7、g TF Time signals and frequency standards emissions V Vocabulary and related subjects Note: This ITU-R Recommendation was approved in English under the procedure detailed in Resolution ITU-R 1. Electronic Publication Geneva, 2011 ITU 2011 All rights reserved. No part of this publication may be repro

8、duced, by any means whatsoever, without written permission of ITU. Rec. ITU-R SM.1392-2 1 RECOMMENDATION ITU-R SM.1392-2 Essential requirements for a spectrum monitoring system for developing countries (1999-2000-2011) Scope The specific situation in developing countries, particularly budget limitat

9、ions, requires careful planning of a national spectrum monitoring system. This Recommendation provides some guidance in this regard. The ITU Radiocommunication Assembly, considering a) that the increasing use of radio services in the developing countries requires more efficient use of the radio-freq

10、uency spectrum; b) that spectrum monitoring is an important tool for frequency management in general, and for verification of efficient use of the radio-frequency spectrum in particular; c) that spectrum monitoring systems are often the most expensive part of a national spectrum management system wh

11、ose optimal implementation, including networking, has a significant economic impact; d) that spectrum monitoring equipment becomes more and more sophisticated, providing more and more new functions, and its appropriate operation requires the availability of highly-professional and well-trained perso

12、nnel, as well as the availability of the necessary infrastructure for testing, calibration and maintenance of the equipment, including antennas; e) that Recommendation ITU-R SM.1050 defines the tasks of a monitoring service; f) that it is necessary to specify minimum requirements for monitoring syst

13、ems of developing countries, so that these systems may fulfil their tasks for national spectrum management, and can be part of the international monitoring system, noting the revision of the ITU Handbook on Spectrum Monitoring approved in 2010, recommends that monitoring systems in developing countr

14、ies should be designed to meet the requirements of Annex 1, in order to perform the tasks set out in Recommendation ITU-R SM.1050, but tailored to the national requirements. 2 Rec. ITU-R SM.1392-2 Annex 1 1 Introduction In principle, radio monitoring stations of developing countries and developed co

15、untries have the same tasks, and hence the same requirements. The difference in terms of available budget and available manpower, however, might be substantial. Therefore, thorough planning and careful design are essential to minimise this difference. The purpose of this Recommendation is to provide

16、 some guidance on how to establish a spectrum monitoring system within scarce available resources. 2 Tasks 2.1 General tasks There are four main tasks of a radio monitoring service, which can be derived from the Radio Regulations (RR): monitoring of emissions for compliance with the provisions of th

17、e frequency assignment; frequency band observations and channel occupancy measurements; investigation of cases of harmful interference; identification and elimination of illegal emissions. These are further specified in Recommendation ITU-R SM.1050. Chapters 1 and 2 of the ITU Handbook on Spectrum M

18、onitoring approved in 2010 (hereinafter “the Handbook”) list further tasks, such as the on-site inspection of radio stations, which may be assigned to a radio monitoring service. 2.2 Measurement tasks Closer examination of these general tasks leads to specific measurement tasks which can be found in

19、 Recommendation ITU-R SM.1050 and Chapter 2 of the Handbook, e.g.: frequency measurements; field strength and power-flux density measurements; bandwidth measurements; modulation measurements; spectrum occupancy measurements; signal analysis and transmitter identification; direction finding and locat

20、ion determination. Chapter 4 of the Handbook provides detailed information on the measurements of these basic parameters. Chapter 5 of the Handbook describes more specific monitoring systems and procedures. 3 Scope of the radio monitoring system Having limited budgets and certain requirements in min

21、d, the scope of the radio monitoring system has to be restricted. For this purpose first some questions like the following ones have to be answered: What in detail is expected from the radio monitoring service? Rec. ITU-R SM.1392-2 3 Which fields of activities are of great public, political or comme

22、rcial interest? What is the frequency range of interest? Which radio services are essential to be monitored? Which regions of the country are essential to be provided by monitoring at the current stage of the country economics development and at what extent they should be covered by monitoring? What

23、 are the consequences of not covering a frequency range, a radio service or a task or a region of the territory? Can sufficient amount of highly professional and well trained operational staff be made available? Can the necessary infrastructure for testing, calibration and maintenance of the equipme

24、nt including antennas be made available? Is there a need for data exchange between monitoring stations and monitoring centers and, if so, is the necessary infrastructure available? Is there any other institution available that could accomplish some of these tasks? As these questions are interconnect

25、ed and cannot be answered independently, they have to be considered in relation to operational issues. Resulting questions could be for example: Is there a need to monitor public mobile telephone networks and to measure their radio coverage or can this task be assigned to the network operator? Does

26、the number of licenses issued for fixed links justify the procurement of special equipment for measurements up to 40 GHz or even higher? Which radiocommunication services are most affected by interference or by illegal operation and in which regions of the territory are they located? 4 Planning of a

27、 Radio Monitoring System Upon answering the above mentioned questions, the required monitoring systems as well as the necessary infrastructure can be determined on the basis of finance resources available. In this regard, special attention shall be given to the required number of monitoring stations

28、, and the siting and remote control of monitoring stations. Section 6.8 of the Handbook provides guidance on planning and optimisation of spectrum monitoring networks in the context of monitoring coverage. Requirements on the siting and environmental protection of monitoring stations are presented i

29、n 2.6 of the Handbook. It has to be understood that siting of monitoring station is a very important step as free and appropriate sites might not be found easily. Section 2.5 of the Handbook provides details about the remote control of monitoring stations. The means of connection between different m

30、onitoring station sites, and also between these sites and the main control centre, has to be carefully considered. Annex 1 of the Handbook gives guidance on monitoring system planning in relation to equipment and relevant tender process. 4 Rec. ITU-R SM.1392-2 5 Equipment Basically, all radio monito

31、ring stations are composed of antennas, receivers or analyzers, direction finders and signal analysis and/or recording equipment. Modern equipment offers a high level of automation, and may accommodate several functions in one unit. For example, a receiver could include a DF function. Sometimes it i

32、s possible to upgrade such functions later. Nevertheless, an external PC or laptop computer is required for automated or remote control of the equipment and for the documentation of the results. 5.1 Antennas Suitable antennas are indispensible for all frequency ranges to be monitored. Antennas can b

33、e categorised in various ways, e.g.: passive/active antennas; low/high gain antennas; suitable for fixed/mobile/transportable use; directional/omnidirectional/direction-finding antennas. The various antenna types have different inherent advantages and disadvantages, depending on the individual appli

34、cation. For field strength measurements, the antennas frequency-dependent antenna factor (k-factor) must be known. Ample information on antennas can be found in Chapter 3 of the Handbook. Section 2.6 of the Handbook discusses site criteria and antenna protection measures. 5.2 Receivers and analyzers

35、 Receivers and spectrum analyzers are indispensible tools of all radio monitoring services. The basic difference is that receivers normally provide pre-selection in the RF front-end and are designed for demodulation purposes, whereas spectrum analyzers are designed to display the spectral characteri

36、stics of the RF spectrum. Measurements of analogue radio services, including measurements of frequency deviation and multiplex power of an FM broadcasting signal, for example, have to be performed with a receiver. Field strength measurements are also carried out using receivers. The measurement of p

37、arameters such as frequency and bandwidth can also be performed using a spectrum analyzer. They may also be used for measurements of digitally modulated signals, or for the detection of unknown sources of interference. Modern receivers may include some features which normally are expected from a spe

38、ctrum analyzer. Conversely, a spectrum analyzer operated in zero-span mode may provide some receiver functions. Meanwhile, FFT analysis in both receivers and spectrum analyzers has become affordable and should be preferred. This is not necessarily more costly than conventional sweeping analysis. Reg

39、arding receiver specifications, Chapter 3 of the Handbook and Recommendations ITU-R SM.1836, ITU-R SM.1837, ITU-R SM.1838, ITU-R SM.1839 and ITU-R SM.1840, and Report ITU-R SM.2125 may be consulted. Recommendations ITU-R SM.377 and ITU-R SM.443 as well as 4.2 and 4.5 of the Handbook describe the mea

40、surement of frequency and bandwidth in detail. Rec. ITU-R SM.1392-2 5 Details on field strength and power flux-density measurements can be found in Recommendation ITU-R SM.378 and in 4.4 of the Handbook. Field-strength measurements along a route with geographical coordinate registrations, important

41、for radiocommunication coverage area determination, are presented in Recommendation ITU-R SM.1875, and other considerations concerning coverage measurements are given in 4.11 of the Handbook. Recommendation ITU-R SM.1708 details coverage measurements that apply to digital TV broadcasting. 5.3 Direct

42、ion finding and location determination Direction finders (DF) are probably the most effective tools for the location of sources of harmful interference and for finding unauthorised transmitters. At the same time, they are often one of the most costly tools of a radio monitoring service. Preserving b

43、udget requires careful planning of fixed DF sites in order to minimize their number while providing required location coverage and accuracy. Section 6.8 of the Handbook provides useful guidance on this topic. The temporary deployment of transportable DF stations may also be considered to extend cove

44、rage. Planning fixed, mobile and transportable DF equipment requires prior consideration of the intended purpose. This has substantial influence on the specifications, e.g. the required frequency range and minimum signal duration. It should also be noted that mobile DFs are particularly useful for h

45、oming, whereas the determination of transmitter locations is the domain of fixed or transportable DF stations. For locating an interfering or illegal transmitter, a mobile monitoring station is necessary. One could also consider whether homing receivers might be helpful for some applications. Increa

46、sed location reliability at frequencies above 30 MHz usually requires several DF stations for the triangulation process. For frequencies below 30 MHz, at least one single site location (SSL) station may be provided. Example of DF limitation considerations: The occurrence of fixed links at 26 GHz and

47、 the appearance of high speed data applications, as such, would not justify the procurement of direction finders for that frequency band, or to specify very low minimum signal duration. Section 4.7 of the Handbook should carefully be studied before any decisions are made. 5.4 Equipment for occupancy

48、 measurements and recording equipment Channel occupancy, and band utilisation in general, are useful information for spectrum management. Specialized spectrum recorders facilitate simultaneous measurements of several bands, but require huge storage capacity. Sometimes the equipment requirements can

49、be reduced, e.g. by reducing the recording time, by limiting the span to be observed or by increasing the necessary re-visit time of a frequency during measurement. Under these circumstances, the use of a modern FFT receiver facilitating spectrograms and occupancy measurements without additional equipment should be considered. In many cases, standard monitoring receivers or spectrum analyzers can also be used in conjunction with a computer running software that controls the equipment and stores the data. Section 4.10 of the

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1