NAVY A-A-50357 A-1985 SHOE SUBMARINE DECK《潜水艇甲板用鞋》.pdf

上传人:孙刚 文档编号:976249 上传时间:2019-03-13 格式:PDF 页数:3 大小:147.71KB
下载 相关 举报
NAVY A-A-50357 A-1985 SHOE SUBMARINE DECK《潜水艇甲板用鞋》.pdf_第1页
第1页 / 共3页
NAVY A-A-50357 A-1985 SHOE SUBMARINE DECK《潜水艇甲板用鞋》.pdf_第2页
第2页 / 共3页
NAVY A-A-50357 A-1985 SHOE SUBMARINE DECK《潜水艇甲板用鞋》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、p=-8C(e-30 -_ A-A-50357A 84 W 7777774 0047300 7 W - _=_ A-A-50357A 31 January 1985 SUPERSEDING A-A-50 3 5 7 18 February 1982 COMMERCIAL ITEM DESCRIPTION SHOE, SUBMARINE DECK The Navy Clothing and Textile Research Facility has authorized the use of this Commercial Item Description. SALIENT CHARACTERI

2、STICS: The shoes shall be a low cut, oxford style with a Bal lace opening. Construction shall be the conventional lay-up method. Each shoe shall have 5 pairs of eyelets and may have a padded quarter-top opening. There shall be two foxing strips and a bumper strip. The color of the upper outer fabric

3、 shall be Navy Blue. Component parts of the shoe shall consist of a vamp, quarter, tongue, lining, toe cap, counters, foxing, bumper strip, outsole, insole, bottom stiffener, bindersole, eyelets and laces. Additional requirements for component parts are as follows: Upper material - The upper materia

4、l shall be a cotton duck or a cotton/synthetic blend. The color shall be Navy Blue. Fabric construction shall be standard contractors material. Lining material- The lining material shall be a cotton duck or a cotton/synthetic blend. The calor shall be natural. The lhing may be a loose lining or may

5、be laminated to the upper material. shall be standard contractors material. Fabric construction Outsole - The outsole shall be the contractors standard compound. The outsole design shall be a chevron style and may be molded in the sole or cut in the premolded sole unit. Any color may be used. Insole

6、 - Shall be a full cushioned type laminated to a suitable fabric. Binder sole -May be made of sole compound or other suitable compound. Bottom stiffener - May be made of sole compound or other suitable compound. Foxing - Each shoe shall have two foxings made of sole compound or other suitable compou

7、nd. Color shall be white. FSC 8430 -. _- _I- THIS DOCUMENT CONTAINS 9 PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. ._ .-.- - A-A-50357A 84 M 9777774 OOLt93OL O M . A-A-503 57 A 1 T Bumper strip - Shall be made of sole compound or any other

8、 suitable compound. The color shall be White. Toe cap - Shall be rubber coated fabric adhered to vamp or vamp lining. Any color may be used. Counters - Shall be a rubber coated fabric. May be stitched to quarters or free standing between quarters and loose lining. Eyelets - May be a bright finish co

9、rrosion-resistant metal or roller coated or tumble coated with enamel. Color is optional. When eyelet washers are used, the washers need not be coated. Laces - Laces may be round braided (approximately 1/8 inch diameter) or flat tubular braided (approximately 1/4 inch wide) and tipped. Length of lac

10、es shall be graded to proper length for each shoe size. Laces shall be made of cotton or a cotton/synthetic blend and shall be White in color. Stitching - All upper stitching shall be done using stitch type 301, with 6-10 stitches per inch. Color of the thread shall approximately match the color of

11、the upper outer fabric. As an alternate, white thread may be used. Size, content and strength of the thread shall be sufficient to assure durability and prevent breakage. Label - Contractors standard labels and method of attaching are acceptable. Sizes and Lasts - Shoes shall be made over the contra

12、ctors standard lasts for a medium width in sizes 6 to 12-1/2 (whole and half sizes) and 13. OUALITY ASSURANCE PROVISIONS: Major and Minor Defects. Sampling and end item inspection shall be in accordance with MIL-STD-105. The inspection level shall be Level I and the AQLs shall be 2.5 for Major and 6

13、5 for total. The lot size shall be expressed in units of one finished shoe and selection shall be by pairs. During the manufacturing process, the manufacturer shall remove parts with defective materials and workmanship damages and replace with non-defective components. Major type defects are as fol

14、lows: a. be Ci d. e. f. h. i. k. 1. j. Not properly mated, i.e., not left and right of same size. Any cut, tear, hole, mend, or weak place. Torn or excessively full linings. Materials not as specified. Construction not in accordance with standard industry practice. Broken upper stitches not repaired

15、 Separation of any bottom component. Any component or assembly omitted or misplaced seriously affecting serviceability or appearance. Rubber components not securely bonded. Cushion insole not securely adhered to inside of shoe. Insole wrinkled, distorted, bulged, or out of alignment to an extent th

16、at will cause discomfort to wearer. Any open seam. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-50357A Minor defects shall be classified as follows: a. b. d. e. f. 5 h. Ci Variation in color. Any spot or stain. Excessively loose or tight thr

17、ead tension. Gauge of stitching irregular. Soles not finished square. Eyelets not securely clinched. Strained seams . Any components or assembly omitted or misplaced affecting serviceability or appearance, but not seriously. RECOVERED MATERIALS: The manufacturer shall utilize recovered materials to

18、the maximum extent practicable. PACKAGING: Each pair of shoes shall be packed in an individual shoe box, approximately 5 inches in width X 5 inches in depth X 14 inches in length or in the contractors standard box. PACKING: Twelve (12) pairs of shoes packaged as above, of one size only, shall be pac

19、ked in a fiberboard shipping container assembled and closed conforming to type CF, class domestic, grade 275, size 3A of MIL-B-17757. The packages shall be packed flat, four in length, one in width, and three in depth. Toward the end of the contract, or when there are less than the required amount p

20、er container of the same size, mixed sizes may be packed withing the same shipping container. MARKING: Each individual shoe box shall have the size and contractors style number legibly stamped or printed thereon. Other marking shall be as specified in the contract or order. NOTES: Purchaser should s

21、pecify sizes required. Custodian: Navy - NU AF -99 Review Activity: DLA-CT AF - 11, 82 Navy- SH Preparing Activity: Navy - N Project No. 8430-N349 User Activity: Air Force - 45 * US. GOVERNMENT PRINTING OFFICE, 1985-SO5I3812I020 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 61223-3-3-1996 en Evaluation and Routine Testing in Medical Imaging Departments Part 3-3 Acceptance Tests - Imaging Performance of X-Ray Equipment for Digital Subtraction Angiog.pdf EN 61223-3-3-1996 en Evaluation and Routine Testing in Medical Imaging Departments Part 3-3 Acceptance Tests - Imaging Performance of X-Ray Equipment for Digital Subtraction Angiog.pdf
  • EN 61223-3-4-2000 en Evaluation and Routine Testing in Medical Imaging Departments Part 3-4 Acceptance Tests Imaging Performance of Dental X-Ray Equipment《医疗成像部门评定和常规试验 第3-4部分 验收试验.pdf EN 61223-3-4-2000 en Evaluation and Routine Testing in Medical Imaging Departments Part 3-4 Acceptance Tests Imaging Performance of Dental X-Ray Equipment《医疗成像部门评定和常规试验 第3-4部分 验收试验.pdf
  • EN 61223-3-5-2004 en Evaluation and routine testing in medical imaging departments Part 3-5 Acceptance tests Imaging performance of computed tomography X-ray equipment《医疗成像部门评定和常规检.pdf EN 61223-3-5-2004 en Evaluation and routine testing in medical imaging departments Part 3-5 Acceptance tests Imaging performance of computed tomography X-ray equipment《医疗成像部门评定和常规检.pdf
  • EN 61226-2010 en Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions《核电站 仪器和控制设备的安全重要性 仪表和控制功能分级》.pdf EN 61226-2010 en Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions《核电站 仪器和控制设备的安全重要性 仪表和控制功能分级》.pdf
  • EN 61227-2016 en Nuclear power plants - Control rooms - Operator controls.pdf EN 61227-2016 en Nuclear power plants - Control rooms - Operator controls.pdf
  • EN 61228-2008 en Fluorescent ultraviolet lamps used for tanning - Measurement and specification method《制革用荧光紫外线灯 测试和规范方法》.pdf EN 61228-2008 en Fluorescent ultraviolet lamps used for tanning - Measurement and specification method《制革用荧光紫外线灯 测试和规范方法》.pdf
  • EN 61229-1995 en Rigid protective covers for live working on a c installations (Incorporates Amendments A1 1998 and A2 2002)《交流设备上带电作业用硬质保护罩 包含修改件A1-1998+A2-2002 IEC 1229-1993+A1-1.pdf EN 61229-1995 en Rigid protective covers for live working on a c installations (Incorporates Amendments A1 1998 and A2 2002)《交流设备上带电作业用硬质保护罩 包含修改件A1-1998+A2-2002 IEC 1229-1993+A1-1.pdf
  • EN 61230-2008 en Live working - Portable equipment for earthing or earthing and short-circuiting《带电作业 便携式接地或接地短路设备》.pdf EN 61230-2008 en Live working - Portable equipment for earthing or earthing and short-circuiting《带电作业 便携式接地或接地短路设备》.pdf
  • EN 61231-2010 en International lamp coding system (ILCOS) (Incorporates Amendment A1 2013)《国际灯具编码系统(ILCOS)》.pdf EN 61231-2010 en International lamp coding system (ILCOS) (Incorporates Amendment A1 2013)《国际灯具编码系统(ILCOS)》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1