NAVY MIL-I-15676 K (1)-1991 INDICATORS SHIP-S COURSE《船航向指示器》.pdf

上传人:吴艺期 文档编号:979674 上传时间:2019-03-13 格式:PDF 页数:2 大小:84.71KB
下载 相关 举报
NAVY MIL-I-15676 K (1)-1991 INDICATORS SHIP-S COURSE《船航向指示器》.pdf_第1页
第1页 / 共2页
NAVY MIL-I-15676 K (1)-1991 INDICATORS SHIP-S COURSE《船航向指示器》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-I-L5b7bK (I) b3 m 9999906 04745b5 O m U MIGI-l5676K( SH) -1 12 April 1991 MILLTARY SPECIFICATION INDICAmRS, SHIPS OURSE o This amemlmnt foniic a part of MIEI-l5676K(SH) , dated 20 December 1982, and is appmed for use by the Naval Sea Systems command, Department of the Navy, an is - available for

2、 use-by cf eLL- PAGE 3 3.1: Delete and substitute: “3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 6.3) in accordance with 4.2. PAGE 11 4.2: Delete and substitute: “42 First article inmect ion. First article inspection shall consist of “4.2.

3、1, line 1: the tests specified in table 1.“ Delete lqualification of“. Table I title: Delete IQualif ication“ and substitute “First article. II 4.2.2, line 1: Delete “qualificationff an substitute Ifirst article“. 1 of 2 FSC 6320 Approved for public release; distribution is unlimited. AMSC N/A DISTR

4、IBIRIION STATiMEW A: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MTGI-15676K (SH) -1 4.2.2, line 2: 4.2.2, line 5: Delete llqualificationll and substitute “first article.11 Delete Ilqualification oft1. 4.2.2, line 14 : Delete lkpalification ofV1.

5、 4.2.2, line 16: Delete %palification ofIl. 6.2.1: Add: Il (k) When first article inspection is required (see 3.1) o 6.3: Delete and substitute: “6.3 First article. When first article inspection is required, the contracting officer should provide specific guiciance to offerors whether the itm(s) sho

6、uld be a preproduction sample, a first article sample, a first prduction itan, a sample selected from the first prQduction items, a standard prduction item fran the contractor1s ment inventory (see 3.1) , and the number of items to be tested as specified in 4.2.2. The contracthq officer should also

7、include specific instructions in acquisition doc=uments regaring arrangements for examinations, approval of first article test resits, and disposition of first articles. right to waive the requirement for samples for first artiele inspection to those bidders offering a product which has been previou

8、sly acquired or tested by the Government, and that bidders offering su& products, who wish to rely on such prouction or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pendhq contract. cubmit alternate bicis unless specifically requested to do so in the solicitation.11 Invitations for bidc should provide that the Government reserves the Bidders should not 6.3.1: Delete in its entirety. 2 Preparing activity: Navy - SH (Project 6320-NO32) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASHRAE OR-10-047-2010 Infiltration Investigation of a Radiantly Heated and Cooled Office《辐射加热和冷却办公室的渗透调查》.pdf ASHRAE OR-10-047-2010 Infiltration Investigation of a Radiantly Heated and Cooled Office《辐射加热和冷却办公室的渗透调查》.pdf
  • ASHRAE OR-10-048-2010 Influence of Long-Term Trends and Period of Record Selection on the Calculation of Climatic Design Conditions and Degree Days (RP-1453)《记录选择的长期趋势和周期对气候设计条件和度日.pdf ASHRAE OR-10-048-2010 Influence of Long-Term Trends and Period of Record Selection on the Calculation of Climatic Design Conditions and Degree Days (RP-1453)《记录选择的长期趋势和周期对气候设计条件和度日.pdf
  • ASHRAE OR-10-049-2010 Integrated Design of Perimeter Zones with Glass Facades《玻璃墙及周边区域的综合设计》.pdf ASHRAE OR-10-049-2010 Integrated Design of Perimeter Zones with Glass Facades《玻璃墙及周边区域的综合设计》.pdf
  • ASHRAE OR-10-050-2010 Metastable Flow inside Capillary Tubes A Critical Review《毛细管内相对稳定性流动 评论》.pdf ASHRAE OR-10-050-2010 Metastable Flow inside Capillary Tubes A Critical Review《毛细管内相对稳定性流动 评论》.pdf
  • ASHRAE OR-10-051-2010 Method to Specify and Empirically Develop Air-Conditioning Components and System Leak Tightness for In-Line Leak Testing《同轴泄漏测试用规范和凭经验开发空调组件和系统泄漏气密性的方法》.pdf ASHRAE OR-10-051-2010 Method to Specify and Empirically Develop Air-Conditioning Components and System Leak Tightness for In-Line Leak Testing《同轴泄漏测试用规范和凭经验开发空调组件和系统泄漏气密性的方法》.pdf
  • ASHRAE OR-10-052-2010 Methodology to Evaluate End Use Options to Reduce CO2 Emissions from Buildings《建筑物最终使用选择减少二氧化硸排放的评估方法》.pdf ASHRAE OR-10-052-2010 Methodology to Evaluate End Use Options to Reduce CO2 Emissions from Buildings《建筑物最终使用选择减少二氧化硸排放的评估方法》.pdf
  • ASHRAE OR-10-053-2010 Moving Ducts into Conditioned Space Getting to Code in the Pacific Northwest《将管道移入空气调节空间 获得太平洋西北部的代码》.pdf ASHRAE OR-10-053-2010 Moving Ducts into Conditioned Space Getting to Code in the Pacific Northwest《将管道移入空气调节空间 获得太平洋西北部的代码》.pdf
  • ASHRAE OR-10-054-2010 Optimization of the Ground Thermal Response in Hybrid Geothermal Heat Pump Systems《复合式地源热泵系统中热响应优化》.pdf ASHRAE OR-10-054-2010 Optimization of the Ground Thermal Response in Hybrid Geothermal Heat Pump Systems《复合式地源热泵系统中热响应优化》.pdf
  • ASHRAE OR-10-055-2010 Organic Rankine Cycle Working Fluid Considerations for Waste Heat to Power Applications《电力余热用有机兰金循环工作流体注意事项》.pdf ASHRAE OR-10-055-2010 Organic Rankine Cycle Working Fluid Considerations for Waste Heat to Power Applications《电力余热用有机兰金循环工作流体注意事项》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1