NAVY MIL-P-17869 A (5)-1985 PUMPS AND MOTORS POWER OIL HYDRAULIC (NAVAL SHIPBOARD USE)《(海军舷侧用)液压石油的电力泵和电动机》.pdf

上传人:lawfemale396 文档编号:980573 上传时间:2019-03-12 格式:PDF 页数:4 大小:18.52KB
下载 相关 举报
NAVY MIL-P-17869 A (5)-1985 PUMPS AND MOTORS POWER OIL HYDRAULIC (NAVAL SHIPBOARD USE)《(海军舷侧用)液压石油的电力泵和电动机》.pdf_第1页
第1页 / 共4页
NAVY MIL-P-17869 A (5)-1985 PUMPS AND MOTORS POWER OIL HYDRAULIC (NAVAL SHIPBOARD USE)《(海军舷侧用)液压石油的电力泵和电动机》.pdf_第2页
第2页 / 共4页
NAVY MIL-P-17869 A (5)-1985 PUMPS AND MOTORS POWER OIL HYDRAULIC (NAVAL SHIPBOARD USE)《(海军舷侧用)液压石油的电力泵和电动机》.pdf_第3页
第3页 / 共4页
NAVY MIL-P-17869 A (5)-1985 PUMPS AND MOTORS POWER OIL HYDRAULIC (NAVAL SHIPBOARD USE)《(海军舷侧用)液压石油的电力泵和电动机》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-P-17869A(SHIPS)AMENDMENT 58 July 1985SUPERSEDINGAMENDMENT 42 July 1984MILITARY SPECIFICATIONPUMPS AND MOTORS, POWER, OIL HYDRAULIC(NAVAL SHIPBOARD USE)This amendment forms a part of Military Specification MIL-P-17869A(SHIPS)dated 24 May 1956, and is approved for use by all Departments and Agenci

2、esof the Department of Defense.PAGE 11*2: Delete:“Class IV - Gear, fixed delivery.“Class V - Screw, fixed delivery.”PAGE 22.1, under “SPECIFICATIONS, MILITARY”: Delete reference to “MIL-L-15017“and add:“MIL-H-17672 - Hydraulic Fluid, Petroleum, Inhibited.”2.1, under “SPECIFICATIONS, NAVY DEPARTMENT”

3、: Delete “General Specificationsfor Inspection of Material. ”PAGE 32.2: Delete.* 3.1: Delete and substitute:“3.1 Qualification inspection. Class I, II and III pumps and motorsfurnished under this specification shall be products which are qualified forlisting on the applicable qualified products list

4、 at the time set for openingof bids (see 6.2).”FSC 4320DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited1 of 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-17869A(SHIPS)AMENDMENT 5PAGE 53.3011: Delete.*PAGE 63.3.14

5、, line 2: Delete “MIL-L-15017“ and substitute “MIL-H-17672“.3.3.17.2: Delete.PAGE 73.3.20, line 2: Delete “4.10.18“ and substitute “4.10.17“.PAGES 9 and 103.4.3 through 3.4.4.8: Delete.PAGE 113.4.4.9: Delete.3.6.1: Delete and substitute:“3.6.1 On board repair parts.* “3.6.1.1 Class I, II, and III pu

6、mps and motors. On board repair parts setsfor class I, II, and III pumps and motors shall consist of such items as gaskets,seals , springs, vanes and bearings which can be easily replaced in the pump ormotor by personnel of limited experience. Quantities of each item shall besufficient for at least

7、1 years maintenance.* “3.6.1.2: Delete.PAGE 124.1: Delete and substitute:“4.1 Responsibility for inspection. Unless otherwise specified in thecontract or purchase order, the contractor is responsible for the performanceof all inspection requirements as specified herein, Except as otherwise speci-fie

8、d in the contract or purchase order,the contractor may use his own or anyother facilities suitable for the performance of the inspection requirementsspecified herein, unless disapproved by the Government. The Government reservesthe right to perform any of the inspections set forth in the specificati

9、on wheresuch inspections are deemed necessary to assure supplies and services conform toprescribed requirements.*PAGE 134.2.4: Delete.2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-17869A(SHIPS)AMENDMENT 5PAGE 14*4.3.1, line 3: Delete “conduc

10、ted or”.4.3.2, line 3: Dele te “conducted or”.PAGE 154.3.3: Delete and substitute:“4.3.3 Qualification check tests. Periodic qualification check tests willbe conducted on a pump at a Government laboratory satisfactory to the Naval SeaSystems Command at such times as deemed necessary by the Governmen

11、t. The peri-odic check tests shall be as follows:(a) Vibration and noise (see 4.10.13).(b) Endurance (see 4.10.14).(c) Time constant (hydraulic motors only) (see 4.10.15).(d) Shock (see 4.10.17).Results of each test shall be compared with this specification. in the event ofany failure to conform to

12、this specification for any periodic check test the con-tractor shall correct the cause of failure on future production units and repairthe deficiency in any pumps or motors not yet shipped. Shock tests may be waivedfor pumps or motors where identical pumps or motors have been successfully shock-test

13、ed. Where the shock tests have taken place, the manufacturer shall submit acopy of the test report before waiver of the shock test will be given.”PAGE 164.6.3, first sentence: Delete “and IV”.4.6.3, second sentence: Delete.PAGE 204.10.9: Delete.4.10.11: Delete.PAGE 214.10.13.2: Delete.PAGE 224.11(h)

14、: Delete.4.11(j): Delete.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-17869A(SHIPS)AMENDMENT 54.12: Delete and substitute:“4.12 Qualification tests. Qualification tests shall be conducted at alaboratory satisfactory to the Naval Sea Systems

15、Command. Qualification testsshall consist of the test specified in 4.10.”4.13: Delete and substitute:“4.13 Inspection reports. The Government inspector shall furnish the com-mand or agency concerned with inspection reports covering results of the periodiccheck tests (see 4.3.3)”.PAGE 246.1, item (k)

16、: Delete.6.2: Delete and substitute.“6.2 With respect to products requiring qualification, awards will bemade only for products which are, at the time set for opening bids, qualifiedfor inclusion in Qualified Products List QPL-17869 whether or not such productshave actually been so listed by that da

17、te. The attention of the contractors iscalled to these requirements, and manufacturers are urged to arrange to have theproducts that they propose to offer to the Federal Government tested for quali-fication in order that they may be eligible to be awarded contracts or purchaseorders for the products

18、 covered by this specification. The activity responsiblefor the Qualified Products List is the Naval Sea Systems Command, SEA 5523,Department of the Navy, Washington, DC 20362-5101 and information pertaining toqualification of products may be obtained from that activity.Application forqualification

19、tests shall be made in accordance with “Provisions GoverningQualification SD-6“ (see 6.2.1).“6.2.1 Copies of “Provisions Governing Qualification SD-6“ may be obtainedupon application to Commanding Officer, Naval Publications and Forms Center,5801 Tabor Avenue, Philadelphia, PA 19120.”* 6.3, line 2:

20、Delete “3.4.3.1 and 3.4.4.1”.Delete “Patent notice paragraph”.NOTE: The margins of this amendment are marked with an asterisk to indicatewhere changes (additions, modifications, corrections, deletions) from the pre-vious amendment were made. This was done as a convenience only and the Governmentassu

21、mes no liability whatsoever for any inaccuracies in these notations. Biddersand contractors are cautioned to evaluate the requirements of this document basedon the entire content irrespective of the marginal notations and relationship tothe last previous amendment.Preparing activity:Navy - SH(Project 4320-N245)4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1