REG NASA-LLIS-1033-2001 Lessons Learned Controlling Risk on Cost-Capped Schedule-Driven Technology Validation Projects (1998).pdf

上传人:towelfact221 文档编号:1018678 上传时间:2019-03-21 格式:PDF 页数:4 大小:17.32KB
下载 相关 举报
REG NASA-LLIS-1033-2001 Lessons Learned Controlling Risk on Cost-Capped Schedule-Driven Technology Validation Projects (1998).pdf_第1页
第1页 / 共4页
REG NASA-LLIS-1033-2001 Lessons Learned Controlling Risk on Cost-Capped Schedule-Driven Technology Validation Projects (1998).pdf_第2页
第2页 / 共4页
REG NASA-LLIS-1033-2001 Lessons Learned Controlling Risk on Cost-Capped Schedule-Driven Technology Validation Projects (1998).pdf_第3页
第3页 / 共4页
REG NASA-LLIS-1033-2001 Lessons Learned Controlling Risk on Cost-Capped Schedule-Driven Technology Validation Projects (1998).pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1033Lesson Info:a71 Lesson Number: 1033a71 Lesson Date: 2001-01-01a71 Submitting Organization: JPLa71 Submitted by: David H. LehmanSubject: Controlling Risk on Cost-Capped, Schedule-Driven, Technology Validation Projects (1998) Abstract: Deep Space 1 (DS1) was a cost-capped, s

2、chedule-driven, technology validation project, designed to flight validate 12 advanced technologies that represented major breakthroughs over state-of-the-art systems. DS1 exceeded its mission success criteria, both in terms of technology demonstration and mission duration.The lesson lists 7 recomme

3、ndations/success criteria for high risk, cost capped missions.Description of Driving Event: Deep Space 1 (DS1) was a cost-capped, schedule-driven, technology validation project, designed to flight validate 12 advanced technologies that represented major breakthroughs over state-of-the-art systems. A

4、n aerospace industry partner was originally selected to provide much of the spacecraft hardware and integration, but ultimately required significant JPL expertise and assistance. JPL was originally responsible for project management and several other elements, but assumed significant additional resp

5、onsibilities. NASA Lewis (now Glenn) Research Center, through the NSTAR program provided the highest priority technology, the ion propulsion system.DS1 exceeded its mission success criteria, both in terms of technology demonstration and mission duration. In addition, it provided the first close-up s

6、pectacular views of a cometary nucleus as part of a very successful extended mission.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionDFrom the very beginning, the project accepted very high risk in developing and flying the miss

7、ion. The accepted risk was compounded by what turned out to be insufficient schedule and funding, leading to insufficient review and oversight of several crucial processes:a71 A lack of an early and complete review of the project to (1) assess adequacy of plans, schedule, cost, resource margins, and

8、 (2) gain a full understanding of the projects risk posture.a71 Cost and schedule reserves that were inadequate given the many advanced technologies to be demonstrated during the mission.a71 Level 1 requirements and mission success criteria that remained unresolved until very late in development.a71

9、 Accepting a formulation phase that was too short for the team to develop a good plan for implementation.a71 A funding profile that lagged the fast-paced schedule, and caused serious inefficiencies during project start-up. This delayed early and full integration of the industrial partner into the pr

10、oject team.a71 Launch vehicle selection that took too long. External influences caused too many different vehicles to be considered.a71 Some technologies were selected for demonstration that proved too ambitious.a71 A cost cap that was imposed early, before the selection of the payload, launch servi

11、ce, and mission plan was finalized.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 The project manager was not fully empowered.References:1. “Deep Space 1 Lessons Learned,“ JPL internal presentation, David H. Lehman, December 1, 2000.2. “Plan Tim

12、ely Implementation of Backups In Case Breakthrough Technologies Fail to Meet Readiness Gates“Additional Key Words: Autonomous Navigation, Flight Qualification, Management and Planning, Technology Plan, Technology Readiness LevelLesson(s) Learned: 1. The Formulation process (Phase A/B) for a typical

13、spacecraft project should be at least one year; it might be shorter for smaller projects as determined on a case-by-case basis. It must culminate in a review to ensure that the mission concept is sound, the requirements are well defined and acceptable, and sufficient resources are available to compl

14、ete the project.2. Very early in the Formulation phase, define: (1) the funding profile, (2) the date the launch vehicle is needed, (3) the Level 1 requirements and success criteria, (4) the reserves strategy and (5) the partnering approach. Do not proceed with further commitments until an agreement

15、 has been reached with NASA.3. Also very early in the Formulation phase, define the use of new technology and its readiness, and backups for risk mitigation.4. Create a project team environment that forces problems to be addressed immediately as they are identified. The extensive JPL technical resou

16、rces should be utilized to assist in early problem resolution.5. Challenge every “new“ or “creeping“ requirement.6. Rigorous technical evaluations of potential industrial partners must be completed. Provide adequate early funding for the chosen partner.7. Co-location of all project team members is a

17、 desired arrangement, but must be implemented very early in the project life cycle to achieve maximum effectiveness.Recommendation(s): See Lesson(s) Learned.Evidence of Recurrence Control Effectiveness: Implementation of NPG 7120.5 effectively addresses all of the high level issues. JPL Corrective A

18、ction Notices have already addressed others.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Aeronautics ResearchAdditional Key Phrase(s): a71 External Relat

19、ionsa71 Payloadsa71 Policy & Planninga71 Procurement Small Business & Industrial Relationsa71 Risk Management/Assessmenta71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2001-12-05a71 Approval Name: Carol L. Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS EN ISO 14855-2-2009 Determination of the ultimate aerobic biodegradability of plastic materials under controlled composting conditions - Method by analysis of evolved carbon dio.pdf BS EN ISO 14855-2-2009 Determination of the ultimate aerobic biodegradability of plastic materials under controlled composting conditions - Method by analysis of evolved carbon dio.pdf
  • BS EN ISO 14877-2002 Protective clothing for abrasive blasting operations using granular abrasives《小颗粒研磨产生摩擦引爆操作时用的防护服》.pdf BS EN ISO 14877-2002 Protective clothing for abrasive blasting operations using granular abrasives《小颗粒研磨产生摩擦引爆操作时用的防护服》.pdf
  • BS EN ISO 14880-1-2016 Optics and photonics Microlens arrays Vocabulary and general properties《光学和光子学 显微透镜系列 词汇和常规属性》.pdf BS EN ISO 14880-1-2016 Optics and photonics Microlens arrays Vocabulary and general properties《光学和光子学 显微透镜系列 词汇和常规属性》.pdf
  • BS EN ISO 14880-2-2007 Optics and photonics - Microlens arrays - Test methods for wavefront aberrations《光学和光子学 显微物镜系列 波像差的试验办法》.pdf BS EN ISO 14880-2-2007 Optics and photonics - Microlens arrays - Test methods for wavefront aberrations《光学和光子学 显微物镜系列 波像差的试验办法》.pdf
  • BS EN ISO 14880-3-2006 Optics and photonics - Microlens arrays - Test methods for optical properties other than wavefront aberrations《光学和光子学 显微镜系列 不同于波前像差的光学特征试验办法》.pdf BS EN ISO 14880-3-2006 Optics and photonics - Microlens arrays - Test methods for optical properties other than wavefront aberrations《光学和光子学 显微镜系列 不同于波前像差的光学特征试验办法》.pdf
  • BS EN ISO 14880-4-2006 Optics and photonics - Microlens arrays - Test methods for geometrical properties《光学和光子学 显微透镜系列 几何学特征试验方法》.pdf BS EN ISO 14880-4-2006 Optics and photonics - Microlens arrays - Test methods for geometrical properties《光学和光子学 显微透镜系列 几何学特征试验方法》.pdf
  • BS EN ISO 14881-2005 Integrated optics - Interfaces - Parameters relevant to coupling properties《集成光学 接口 有关耦合特性的参数》.pdf BS EN ISO 14881-2005 Integrated optics - Interfaces - Parameters relevant to coupling properties《集成光学 接口 有关耦合特性的参数》.pdf
  • BS EN ISO 14889-2013 Ophthalmic optics Spectacle lenses Fundamental requirements for uncut finished lense《眼科光学 眼镜镜片 未切边成品眼镜片的基本要求》.pdf BS EN ISO 14889-2013 Ophthalmic optics Spectacle lenses Fundamental requirements for uncut finished lense《眼科光学 眼镜镜片 未切边成品眼镜片的基本要求》.pdf
  • BS EN ISO 14890-2013 Conveyor belts Specification for rubber- or plastics-covered conveyor belts of textile construction for general use《输送带 通用织物结构的橡胶或塑料包覆的输送带规格》.pdf BS EN ISO 14890-2013 Conveyor belts Specification for rubber- or plastics-covered conveyor belts of textile construction for general use《输送带 通用织物结构的橡胶或塑料包覆的输送带规格》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1